Does Des McNulty agree that the best way to make progress economically is for the Government to be clear about what can be progressed with the existing bridge? Does Labour accept that the existing bridge can be repaired and that, if that is possible, a second bridge is unnecessary?
I would like to add another question to the member's list. How would she, as a representative of Fife constituents, argue against the inevitable political pressure to open the existing bridge to road traffic once the new one is built and is congested to the same extent that the existing bridge is?
Helen Eadie reminds us that she has been an advocate of a second road bridge all her political life, which is far longer than the few years that we have known about the corrosion. I presume that she is arguing for increased road capacity rather than merely a replacement bridge. Is that the case?
In dissenting on this issue, I had expected to be a lone voice in the wilderness. However, given the determination of the advocates of an additional bridge to disagree violently with each other on every issue that they can find, I feel much more comfortable.
Murdo Fraser used the metaphor of a drug addict, continually looking for the next fix, to describe two Governments locked in an unhealthy relationship that is characterised by abusive falling-outs. In fact, I use the same metaphor for road builders: "Go on—just one more infrastructure project. I need it to support my economy." The situation is infuriating and all too familiar.
Let me be clear: a road crossing on the east of the Forth remains and will remain a vital part of our transport infrastructure. What I object to is this Government's decision, supported by all the other political parties bar my own, to press ahead with a proposal that will cost a vast sum of money before the reparability of the existing bridge has been fully examined.
At the moment, the arguments in favour of an extra bridge are supposedly justified by concerns about the integrity of the existing Forth road bridge. Apart from the notable exception of Helen Eadie, we have largely been asked to ignore the fact that the advocates of an extra bridge were making their case long before corrosion on the existing bridge was ever an issue. I have to say, though, that Helen Eadie dropped her guard a wee bit at the end of her speech when she said that any decision should be based on the viability of the existing bridge. That has never been her basis for supporting an extra bridge over the Forth.
That was indeed a hard question to answer this time last year, or even six months ago when the issue of corrosion was still being addressed. However, the corrosion situation is looking better; the dehumidification appears to be working. Indeed, FETA has told us that the date at which the existing bridge might have to close to HGVs—not close altogether, as I believe the cabinet secretary might inadvertently have indicated—has slipped back. We should use the additional time to gather the information that we need about the existing bridge.
Let us consider the problems and the solutions. The problem of the increasing damage to the existing bridge has not come from nowhere. There is no mysterious, magical force that is forcing bridges around the world to close. Additional damage is being done by additional traffic. I am not aware of any attempt that has been made to examine properly ideas about reducing traffic, traffic management, using existing alternative crossings or switching freight from road to rail. Marilyn Livingstone argued that a new bridge ought to be future proofed, but the existing road bridge was probably thought to be future proofed when it was built. The bridge's problems result from the increasing loads that we have put on it. I am not talking about a law of nature; I am talking about a set of choices that we have made about how we use our road infrastructure.
Marilyn Livingstone also argued that the new bridge would be full on the day on which it opened. We cannot have things both ways. We can say either that congestion and increasing damage to our roads and bridges are the result of too much traffic, or that they are the result of not enough roads and bridges.
I will support the Labour amendment, although it does not go as far as I would like it to. If we discover in the future that a new bridge is necessary, there should, of course, be a multimodal element. However, we must achieve fewer road crossings and more public transport crossings, not more of everything. The argument is exactly the same as that which we have about rail versus air transport. If we simply give in to the business lobby and the Confederation of British Industry, which has argued this week that the new bridge must have more capacity—
If we argue that the new bridge should have more capacity, we will have more of everything. We will have a higher rather than a lower level of emissions. As I said, we need to have fewer road crossings and more public transport crossings.
I cannot support either of the other amendments.
The issue is timing. I ask members to consider their own homes. If a member had been told a few months ago that their roof might fall in, and they were mulling over the remortgaging options to repair it and someone came along and said, "Actually, I think that I can fix it," surely they would give them the chance to come back with a report on whether they could do so for a lower amount of money than would be needed to repair it. All that I ask members to do is consider that. Let us fix the bridge that we have, for goodness' sake.
The minister has implied—I think that I am right in saying that it is on the record for the first time—that under his scheme future Administrations will have the choice of increasing road capacity between the two Forth crossings by using the existing crossing. If his climate change targets mean anything at all, surely he needs a system in place to prevent that from happening. Will he guarantee that the SNP would never support such a scheme? How will he prevent future Administrations from doing so?
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.