When the minority Government arrived in office, it had immediately to set about the process of building bridges. It is ironic that it has interpreted that literally.
The Conservatives have worked to support elements of Government policy on the Forth bridge from an early stage. We worked with the Government to remove tolls from the Forth bridge and we have been perhaps the most enthusiastic supporters of building a second Forth road bridge, fundamentally to replace the existing bridge.
There are those who believe that additional capacity is extremely important. In fact, the Conservatives have a long track record in that regard. While in government in the early 1990s, we made major land purchase decisions that indicated our intention to move ahead with additional capacity over the Forth.
Not at this point.
We then went through a series of policy changes and changes of Government that resulted in other priorities being brought forward. However, the discovery of engineering problems in the Forth bridge focused the minds of members of the Scottish Parliament, other politicians and engineers alike on how to deal with the matter should the problems become insurmountable.
Members have presented those engineering issues in a number of different ways. I was glad to hear Helen Eadie mention Alastair Andrew, the former bridgemaster who has now retired. In the past, I was lucky enough to meet him on more than one occasion. He is one of the greatest sources of information on the bridge and on the dangers that lie ahead.
We have heard much about the biggest single problem that faces us: corrosion in the bridge cables. We are told that the dehumidification process appears to be working. However, unlike some who believe that that process may reverse corrosion in the cables, the Conservatives believe that that will not happen. If we can slow down the rate of corrosion, we will extend the lifespan of the bridge, but dehumidification will neither reverse the corrosion nor repair it.
As a consequence, the current problems with the bridge will not go away. There is also the on-going problem with wires in the cables snapping not as a result of corrosion but because the process of rolling the wires to form the cables over 40 years ago may have been flawed. In addition, there is the potential problem of the anchorage points. The problem is not yet fully understood, but there are engineering risks in that regard that may yet cause us to consider bridge replacement.
The bridge is flawed and will continue to suffer from on-going damage, not only because of its construction method but because of increased traffic volumes. There is a choice that we have to make. Des McNulty described it as a paradox, and I agree with his interpretation. The paradox is this: do we go ahead and build a bridge in the knowledge that it may be required, or do we wait until we know that a new bridge is required and then begin to build a new one? The members who contributed to the debate fall into two distinct groups: those who believe that we should wait and see and those who believe that we should go ahead now and plan for a new bridge. In that respect, the Government has our full support.
Deciding on the option of building a lower-priced bridge and making extensive multimodal use of the existing bridge has resulted in a significant cost reduction, which makes it a worthwhile option to pursue. However, given what members have said in the chamber today, we must look further at the multimodal option. Some individuals take the extraordinary line of saying, "We do not need another bridge but, if we are to have one, can we have the expensive option?"—I know that because I have spoken to them. The argument is not only extraordinary but irrational. When I come across it, I dismiss it.
However, in many of the profound speeches in the debate, members said that, if we are to build the bridge, the multimodal option should be involved. I have this to say to those who believe in a new multimodal bridge: before going down that road, we must consider the cost and the impact of the cost. The Conservatives are not prepared to commit to the much higher level of expenditure that a multimodal bridge would require when the option of reusing the existing bridge to provide that multimodal option is ahead of us.
We know that challenges lie ahead of us. As the new bridge is completed and traffic is moved off the existing bridge, the challenge will be to refurbish and rebuild elements of the existing bridge. That challenge lies in the future—indeed, it will lie further in the future if we agree now on replacing the existing bridge. If we build the replacement, the old bridge's lifespan will be considerably increased, which gives us options for the future.
We have had an extensive debate today on funding and funding mechanisms. I believe that, on balance, the cabinet secretary has clearly stated how the bridge will be funded, and that the funding for the bridge will be in place. However, the cabinet secretary has not accounted for how the massive gap in capital will be filled once the huge elephant in the room, the new Forth bridge, has taken up its place. Time has gone by, and we know how the bridge will be funded, but we do not know how the funding will be replaced within capital budgets.
There are calls for various things in the amendments. It is ironic that two of them, those from Labour and the Liberal Democrats, seem to take out the commitment not to toll the new bridge. That is why the Conservatives cannot support those amendments.