Parliament Workbench
Data: Official Report to 26 Nov 2026

Official Report · Committee

Forth Replacement Crossing

Tuesday 23 June 2009 Transport, Infrastructure and Climate Change Committee Evidence session 116 contributions · 10 speakers

Speakers

Showing Margaret Smith only · show everyone

Margaret Smith’s contributions

7 contributions
Margaret Smith LD Edinburgh West
link

As a preamble to my question, let me make the slight observation that what I have just heard does not square with what I hear on the doorsteps in my constituency from people who are directly affected by the project. You have explained the consultation process. It is fine to tick boxes in that way, but I would be happy to show the convener and committee members some of the many e-mails that I have received from my constituents about how the consultation was undertaken, with their feedback about the exhibitions, the public meetings and how letter drops were done or not done. I will not go into this in detail, but a briefing was held for elected representatives only weeks ago and some of us did not find out about it until after it had taken place—some MPs and MSPs were not even invited to it in the first place.You can tick a box to say that that meeting happened, but the fact that no elected representatives from south of the river were there shows that another story is going on underneath. Many of my constituents tell me that they ask questions but do not get answers. They feel that Transport Scotland just gives them information at briefings or meetings, which does not feel like being part of a genuine consultation. How can you assure Parliament that your consultations are genuine, particularly when the vast majority of people in South Queensferry feel fatalistic about the situation now, because they were not listened to on the tunnel proposal or on many other matters? They do not feel that the consultation is genuine.

Margaret Smith LD Edinburgh West
link

You referred to traffic reduction on Builyeon Road. I want to use that to illustrate something that often happens, which is that Transport Scotland makes an assertion, but local residents who ask for the evidence behind it and for up-to-date traffic figures—I have asked for them but have not received them yet—do not feel that there is hard evidence for what is proposed. They feel that information, but no hard evidence, is simply given out to people at local meetings and that there is no genuine dialogue. I can only represent what people say on the basis of having attended your consultation meetings. I acknowledge that many of the changes, some of which John Howison mentioned, are welcome—for example, the issues around the embankments and so on.However, I think that we are about to be given an embargoed copy of a report that feeds back the results of the consultation and exhibitions that took place in January. Some changes to the roads proposals that were made and put on the website in April are the result of feedback from those exhibitions, but the report that led to those changes being made is not yet in the public domain, although it is nearly July. Many people have told me that they have had no feedback about their input into the process in January. Their input might have led to change—that is a generous interpretation of what you said—but they remain unaware of that.

Margaret Smith LD Edinburgh West
link

You described the process as "consultation; engineering; reconsultation". I presume that the work of recent weeks has been to do with reconsultation on the changes that were made as a result of the consultation in January. People say that they are being told in meetings that the time for consultation on substantive matters such as roads has passed and that only matters such as mitigation and landscaping are open for consultation and change. I want to nail that down. Are you talking about genuine reconsultation, in which your minds are still open to the different approaches that I understand have been suggested, or are the road changes—pardon this pun—set in concrete?

Margaret Smith LD Edinburgh West
link

What work have you done on the traffic levels on the connecting road network? When will that be made available to local residents and others?I also want to pick up on what you said about the indicative road alignment that was in the original proposals, which would have taken traffic straight from the bridgehead out to the M9. Local residents and others based their interpretation of what would happen on those proposals, but I think that you said that further work was done and that that proposition was found not to be feasible. I am a little unclear about why something that it was thought would be helpful to include in the original proposals for illustrative purposes was then judged not to be feasible. Quite a lot of the anger and concern in South Queensferry is about the changes in the roads. I am unclear why it is not feasible to take the road from the bridge away from the town straight to the M9. Was cost the only reason? You certainly said that it was an issue.

Margaret Smith LD Edinburgh West
link

Would it be possible for the committee to have the figures on which those observations, and the decisions to which they led, were based?

Margaret Smith LD Edinburgh West
link

I just want to pick up on Shirley-Anne Somerville's question about the code of construction practice. It will probably not come as too much of a shock to the committee to hear that some of the issues that are giving great cause for concern at the moment are around the siting of construction compounds, particularly the suggestion that one could be put in the Echline field.Mr Howison, it says in the paperwork that you have given me and others who have attended some meetings that your overarching aim is to construct the scheme with the least practicable impact on communities and the environment. Why do you think that siting a construction compound for six to seven years next to hundreds of houses will have the least practicable impact on communities and the environment? I accept that access to the sea is needed, but would not it be more sensible to site the compound on the other side of the road, where it would not be at the back of people's homes?

Margaret Smith LD Edinburgh West
link

I have a point of clarification. Obviously, whether you are given temporary compulsory purchase order powers to acquire any land that you do not own is up to Parliament, but I am simply picking up on what your document says. It does not say that your overarching aim in your construction approach is for the project to cost as little money as possible. If it did, your comment about ownership would have more foundation, but you actually say that you want to have the least impact on communities and the environment. I hope that Parliament shares that aim and that people will not simply say, "Well, let's use this particular site because we happen to have it in public ownership already."

  1. Scottish Parliament Transport, Infrastructure and Climate Change Committee Tuesday 23 June 2009 Committee business · 1
  2. Decision on Taking Business in Private Procedure · 2
  3. Road Safety Framework Committee business · 90
  4. Forth Replacement Crossing Evidence session · 116
  5. Budget Process 2010-11 Committee business · 7

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.