In a week when Queensland had a cyclone of 163mph, perhaps if we are worrying about 25mph winds we are relatively lucky. I want to explore further the issue of taking the cranes down. Is there a difference between the weather requirement to take the jib down—I think that Mr Climie pointed out in previous evidence that the jib had to be aligned with the wind direction—and to take the tower down? Once the jib is down, are the constraints less severe?
Official Report · Committee
Forth Replacement Crossing
Speakers
Showing Stewart Stevenson only · show everyone- Keith Brown SNP 16
- Edward Mountain Con 15
- David Climie Transport Scotland 11
- Stewart Stevenson SNP 4
- Rhoda Grant Lab 3
- Richard Lyle SNP 3
- Mike Rumbles LD 2
- John Mason SNP 2
- Sally Cox Forth Crossing Bridge Constructors 1
- John Finnie Green 1
- Jamie Greene Con 1
- Gail Ross SNP 1
- Michael Martin Forth Crossing Bridge Constructors 1
Stewart Stevenson’s contributions
4 contributionsIs the deconstruction taking place at the bottom of the tower, with the whole thing being taken down while the jib remains in place and is the last thing to be removed, more or less?
Is it the case that, while that jib is there, which it is for most of the time that the crane is being taken down, there is a risk of strong wind gusts making the jib interfere with the tower and, in extremis, perhaps causing damage? I would imagine that that would damage the crane.
My other point, which I think can be dealt with fairly briefly, is on the accuracy of forecasts. We are told that we need the 48-hour window, so we must clearly have some confidence that that window will exist, if we start a particular process that depends on it. How often has the forecast in respect of wind deviated from the outcome? I speak as the former minister who, on a 0.4o error in the forecast, found eight times as much snow falling as had been forecast in 2010. That incident is well documented and well understood.
In this meeting
Everything on 29 Mar 2017 →- 09:00 Subordinate Legislation Subordinate legislation · 168
- 10:30 Forth Replacement Crossing Committee business · 61
- 11:15 Transport (Update) Evidence session · 73
- 12:00 Subordinate Legislation Subordinate legislation · 27
- 12:15 Seat Belts on School Transport (Scotland) Bill: Stage 1 Bill debate · 83
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.