Parliament Workbench

Question thread · 4 questions

What the estimated costs would be, at 2006 prices, to convert each of the proposed options for a new Forth crossing from road traffic use to (a) light and (b) heavy rail use at some point during the crossing’s proposed …

Started with S3W-03854 on 30 Aug 2007; latest 24 Sep 2007. Each later question says it follows up an earlier answer.

Follow-ups
3
longest chain 1 step
Span
25 days
30 Aug 2007 to 24 Sep 2007
Answered
4 of 4
by Stewart Stevenson
Asked by
1
Claire Baker

The thread, in order

Each answer’s opening lines; open a question for the full text
  1. S3W-03854 30 Aug 2007 Claire Baker Lab Answered

    To ask the Scottish Executive what the estimated costs would be, at 2006 prices, to convert each of the proposed options for a new Forth crossing from road traffic use to (a) light and (b) heavy rail use at some point during the crossing’s proposed minimum 120-year lifespan.

    Stewart Stevenson, 18 Sep 2007: The costs associatedwith including light rail at the design stage for each of the proposed options wereprovided at the Public Information Exhibitions. To provide sufficientwidth for light rail on a new bridge would mean strengthening the deck, increasingcosts by around 20%. Tunnels would require an additional tunnel f…
  2. S3W-04557 24 Sep 2007 Claire Baker Lab Answered

    What the estimated costs would be, at 2006 prices, to strengthen the decking of a new Forth Bridge during its lifetime as opposed to when initially constructed.

    Stewart Stevenson, 22 Oct 2007: No decision has yetbeen made regarding the form of the replacement crossing. Following the decisionon the form, function and location of the crossing, the crossing will be designedand constructed to suit its proposed function and to carry specific, alternativetransport modes. Therefore, no costshave been prepared for …
  3. S3W-04558 24 Sep 2007 Claire Baker Lab Answered follows S3W-03854

    What the estimated costs would be, at 2006 prices, to convert one of the two proposed bored tunnels from road use to light rail use during the lifetime of the new Forth crossing.

    Stewart Stevenson, 22 Oct 2007: Converting one of the two proposed bored tunnels from road to light rail would raise the capacityissue of reducing the crossing to a single lane for general traffic in either direction. Therefore, no costinghas been produced.
  4. S3W-04559 24 Sep 2007 Claire Baker Lab Answered follows S3W-03854

    What the estimated costs would be, at 2006 prices, to convert one of the two proposed bored tunnels from road use to heavy rail use during the lifetime of the new Forth crossing.

    Stewart Stevenson, 22 Oct 2007: The tunnel optionsunder consideration do not satisfy the gradients required for heavy rail to be incorporated,either during construction or at a later stage. As such, we have not estimated thecosts of converting one of the two bored tunnels from road use to heavy rail duringthe lifetime of the new Forth crossing.

How this thread is put together

Follow-up
A question whose text says it is “further to the answer to question …” (or reply, response, or asks for a “substantive answer” to an earlier question). The question it names is its parent.
Several citations
When a question cites more than one earlier question, the most recent one we hold is used as the parent; the others are listed as “also cites”.
Thread
Follow parents back to the first question; every question that leads back to it is in this thread. Branches are shown in date order.

All question threads