What the estimated costs would be, at 2006 prices, to convert each of the proposed options for a new Forth crossing from road traffic use t…

Answered Asked by Claire Baker Lab Lodged 30 Aug 2007

The question

To ask the Scottish Executive what the estimated costs would be, at 2006 prices, to convert each of the proposed options for a new Forth crossing from road traffic use to (a) light and (b) heavy rail use at some point during the crossing’s proposed minimum 120-year lifespan.

The answer

Answered by Stewart Stevenson on 18 Sep 2007 · 19 days after it was lodged, on time

The costs associatedwith including light rail at the design stage for each of the proposed options wereprovided at the Public Information Exhibitions.
To provide sufficientwidth for light rail on a new bridge would mean strengthening the deck, increasingcosts by around 20%. Tunnels would require an additional tunnel for light rail onlywhich would increase costs by around 50%.
No work has been conductedon adding light rail to a crossing at a later stage.
Heavy rail has beendismissed as an option for any replacement crossing as the existing rail infrastructurecan be improved to meet foreseeable demand.

In the Official Report

No contribution in the Official Report cites S3W-03854 by reference.