To ask the Scottish Executive which projects have been aided under the Trunk Road Cycling Initiatives in the last five years, and how much was spent on each project.
Sarah Boyack, 22 Nov 1999: Those projects which have been aided by the Trunk Road Cycling Initiative in the last five years and the estimated amount spent or committed to each project to date are set out in the two tables below. Table 1 (total £3.4 million) represents the outlay on trunk road interface sections and crossings for the National Cy… -
Which of the figures provided relate to the costs of work already carried out under the Trunk Road Cycling Initiative and whether or not the figures given are all attributable to cycling provision.
Sarah Boyack, 7 Feb 2000: All of the figures given were attributable to provision for cyclists. Those works already carried out are indicated below.Route | Project A1 | Spott Road - Oswald Dean A1 | Lemington - Howburn A701 | Locharbriggs A701 | Tinwald Downs Roundabout A701 | Priory Roundabout A75 | -
To provide a detailed breakdown of the #138,480 costs involved in providing cycling facilities for the Parkhead to J13 Abington section of the M74.
Sarah Boyack, 7 Feb 2000: This section was procured within the M74/A74(M) Design, Build, Finance & Operate Contract and a detailed cost breakdown is not available. The value of the scheme is based on securing 10.215km of cycleway at an estimated rate of £13.56 per metre length. -
To provide a detailed breakdown of the #1,057,500 costs involved in providing cycling facilities for the Harthope Viaduct to Coatsgate section of the M74.
Sarah Boyack, 7 Feb 2000: This section was procured within the M74/A74M Design, Build, Finance & Operate Contract and a detailed cost breakdown is not available. The value of the scheme is based on securing 9km of cycleway at an estimated rate of £117.50 per metre length. -
Whether it will explain the difference in the cost of providing cycling facilities on the Harthope Viaduct to Coatsgate section of the M74 and the cost of providing cycling facilities on the Millbank J12 to Parkhead section of the M74.
Sarah Boyack, 24 Feb 2000: The difference in cost is attributable to the longer length and more extensive works applicable to the Harthope Viaduct to Coatsgate section. In this case new carriageway construction was required to support the cycleway. Within the Millbank to Parkhead section the cycleway was formed on the disused carriageway of the… -
To provide a detailed breakdown of the #88,000 costs of providing cycling facilities on the Bargower section of the A76 and the #99,000 costs of providing cycling facilities on the North of Bowhouse section of the A76.
Sarah Boyack, 7 Feb 2000: In each case, consideration of cyclists' needs resulted in the provision of hardstrips in larger improvement contracts. On the Bargower section of the A76, the installation of edge of carriageway hardstrips cost £88,000. On the North of Bowhouse section of the A76 the installation of edge of carriageway hardstrips cos… -
To provide a detailed breakdown of the #450,000 costs involved in providing cycling facilities for the Ayr Road Route of the M77.
Sarah Boyack, 7 Feb 2000: The detailed breakdown of the £450,000 cost involved in providing cycling facilities for the Ayr Road Route of the M77 is as follows:1 | Corkerhill Pedestrian/Cycle Bridge | £155,000 2 | Arden/Darnley Pedestrian/Cycle Bridge | £155,000 3 | Nithsdale Road/Drumbeck Road remote pedestrian/cycle track. | £19,250 4 | Corke… -
What further cycling facilities attached to trunk roads are planned.
Sarah Boyack, 7 Feb 2000: Those improvements for which plans have been made are contained in the list which I published in answer to your question S1W-2268 on 22 November 1999.
How this thread is put together
- Follow-up
- A question whose text says it is “further to the answer to question …” (or reply, response, or asks for a “substantive answer” to an earlier question). The question it names is its parent.
- Several citations
- When a question cites more than one earlier question, the most recent one we hold is used as the parent; the others are listed as “also cites”.
- Thread
- Follow parents back to the first question; every question that leads back to it is in this thread. Branches are shown in date order.