Written Question · S1W-02268 · Session 1
Which projects have been aided under the Trunk Road Cycling Initiatives in the last five years, and how much was spent on each project.
The question
To ask the Scottish Executive which projects have been aided under the Trunk Road Cycling Initiatives in the last five years, and how much was spent on each project.
The answer
Those projects which have been aided by the Trunk Road Cycling Initiative in the last five years and the estimated amount spent or committed to each project to date are set out in the two tables below. Table 1 (total £3.4 million) represents the outlay on trunk road interface sections and crossings for the National Cycle Network and on other trunk road cycling facilities. Table 2 (total £2.4 million) represents the estimated expenditure on cycling facilities within the new M74 corridor.TABLE 1: NATIONAL CYCLE NETWORK AND GENERAL FACILITIESRoute | Project / Location | Estimated Cost
A1 | Spott Road
- Oswald Dean | N/A
A1 | Lemington
- Howburn | N/A
A6091 | Cycleway | N/A
A7 | Boleside | N/A
A7 | Galashiels
- Hawick Cycleway | N/A
A701 | Locharbriggs | £35K
A701 | Tinwald Downs Roundabout | £50K
A701 | Priory Roundabout | N/A
A737 | Highfield | £30K
A75 | A712
- U286 Creetown | £40K
A75 | Twynholm | N/A
A75 | The Glen | £30K
A76 |
A1 | Spott Road
- Oswald Dean | N/A
A1 | Lemington
- Howburn | N/A
A6091 | Cycleway | N/A
A7 | Boleside | N/A
A7 | Galashiels
- Hawick Cycleway | N/A
A701 | Locharbriggs | £35K
A701 | Tinwald Downs Roundabout | £50K
A701 | Priory Roundabout | N/A
A737 | Highfield | £30K
A75 | A712
- U286 Creetown | £40K
A75 | Twynholm | N/A
A75 | The Glen | £30K
A76 |
In the Official Report
No contribution in the Official Report cites S1W-02268 by reference.