You say in your evidence that planning regulations do not permit double glazing in listed buildings.
Official Report · Committee
Consideration Stage
Speakers
Choose an MSP to read only their contributions- Ian Mowat 135
- Malcolm Thomson 70
- Bill Aitken Con 51
- Alan Welsh New Town, Broughton and Pilrig Community Council 43
- Stuart Turnbull Jacobs Babtie 40
- Steve Mitchell Environmental Resources Management 38
- Aileen Grant City of Edinburgh Council 24
- David Todd Dublin Street Residents Association 22
- Brian Evans Gillespie’s llp 17
- Jeremy Purvis LD 10
- Andrew Oldfield 5
- Alasdair Morgan SNP 5
- Malcolm Thomson QC Counsel for the Promoter 1
- Andrew J Oldfield Mott MacDonald 1
- Marilyn Livingstone Lab 1
The record
469 contributions · showing 401–469That is correct.
Do you accept that secondary glazing is permitted?
Secondary glazing is accepted in listed buildings, yes.
Thank you, Mr Welsh.
Do committee members have any questions for the witness?
No.
Mr Mowat, would you like to re-examine the witness?
No.
Thank you for your evidence, Mr Welsh. We now turn to David Todd, who will address the issues of noise, congestion, route change and visual impact. There seems to be some overlap there, Mr Mowat. I do not think that we want to duplicate evidence.
I shall try not to do so.Mr Todd, I understand that you speak on behalf of the Dublin Street residents association. It would be helpful if you were to explain, especially in the light of Mr Thomson's questions to the previous witness, exactly who the association represents.
The association deals with the internal management of the top two houses in Dublin Street, which are on the intersection with Queen Street and North St Andrew Street that we are talking about. There are 18 flats there. Both buildings are entirely residential. I am on the committee that is appointed at the annual general meeting every year, and we deal with internal and external matters that concern the two blocks of flats.
Has the proposed tramline been of concern to the residents?
It was raised at the most recent annual general meeting, and the committee was delegated to look into the matter.
Are all the residents aware of the objection?
Yes. It is posted on the notice board in the flats.
Am I right in thinking that, of all those flats, several of them—or all of them, perhaps—have rooms facing Queen Street?
In the top house, which is on six floors, every floor has a window on to Queen Street.
To get to the specifics, my understanding is that you are not objecting to the tramline in principle but that you are simply concerned about the routing of the tramline past the block where you live.
Yes.
You have listed noise and vibration as a concern. As a resident, are you satisfied with what you have heard from Mr Mitchell about the amelioration that might be made?
We are still concerned that the promoter is not concerned about the tunnel, which obviously affects us in Dublin Street. As far as noise is concerned, I do not understand how, if noise were added that was less than the existing noise, that would not make things noisier. I am worried that, although the noise of the tram would be less than the existing noise, when the noise of the tram were added to the existing noise, that would make things noisier. That is how it seems to me, as a layman.
Yes. Despite all the proposals and despite what Mr Mitchell said, your concerns about noise remain a matter of contention. You are not satisfied that you will be looked after.
Yes. We are also concerned that, although the noise was measured 180m from the intersection, it is a special intersection, in that it is on a curve and on an incline. We understand that it will be used not just by line 2 but by line 1. We think that that combination of factors will make things particularly difficult.
Are you satisfied with what Mr Mitchell said about wheel squeal, which, it seems, is the noisiest thing that can happen during operations?
He said that there will be no wheel squeal, but we have been told that on an incline and on a curve there may be such noise.
He said that emergency measures would be taken and that, if necessary, you would be insulated against that noise.
That is correct, although it is interesting that he said that those measures would not be taken in advance.
Okay. Moving on, does congestion remain a concern, or are you satisfied with what Mr Turnbull said about that?
Again, as a layman, I cannot see how what requires to be done in Queen Street will not cause extreme congestion. We have established that it is a busy street, and it must be that there will be more congestion. The only way to avoid that would be for the work to be done at night, which would disturb the residents.
Will you briefly mention your current profession?
I am an arts management consultant.
I take it that you have no special knowledge of architecture.
Not specifically. I am more in the performing arts.
Nevertheless, you are a long-term resident of Edinburgh.
Yes.
And you are interested in the architectural heritage of the place.
I am, yes.
You heard what was said about St Andrew Square, which is close to you, and its importance. It was said that it would be a planning disaster if the north side of St Andrew Square had a tramline on it.
I have a lot of difficulty with the view of one of the previous witnesses, who said that St Andrew Square is a "set piece". That is true of Charlotte Square, but those who created the new town started at St Andrew Square and at that time they did not create palace fronts of the type that are found in Charlotte Square. They moved on to the idea of having complete terraces and palatial fronts after about 10 years of construction. St Andrew Square has always been piecemeal, and at the moment, apart from some of the buildings on the north side, there is a muddle of modern buildings. I do not agree that it requires the same respect as, for example, Charlotte Square.
Going back to noise and vibration, which is something that I missed—
Vibration was not in the original objection, Mr Mowat.
We have certainly discussed it. In any event, in relation to noise, we heard that the test of best practicable means will be used in construction and that something similar will be used in operations. As a resident who will be affected, are you happy with that, Mr Todd?
On the face of it, it sounds fine, but there are financial implications. It does not take too much imagination to think of a situation in which we would be affected by the screeching during the day and the grinding of the rails during the night. What could be done about that? The only solution would be unaffordable, so we would be stuck. That is my concern; the code of construction practice seems fair, but at the end of the day it is a question of money and it will be the residents who suffer.
I think that you also have a concern about noise arising from maintenance.
Yes. As I said, it is not clear how much maintenance will be required. We are told that we will be given notice, but the maintenance, which will be carried out at night, will involve grinding the rails to stop the trams screeching during the day. It is all very well to be warned that one will be unable to sleep, but what if one needs to sleep?
As a catch-all, have you mentioned the main areas about which you are still concerned?
Yes.
Thank you. We will now have the cross-examination.
Mr Todd, am I right in understanding that, despite the name of your association, membership is not open to anyone other than a resident of one of the 18 flats?
That is correct.
Were the 18 flats all constructed at the same time out of larger buildings?
They were.
What sort of glazing do they have?
Many of them have the original glazing. In some of them, secondary glazing has been installed.
What do you have?
I have secondary glazing.
Thank you. I have no further questions.
Do members of the committee have any questions? Members indicated disagreement.
Would Mr Mowat like to conduct a re-examination?
No.
Thank you very much, Mr Todd.We now come to closing speeches, which should be a maximum of five minutes.
In my submission, the issues that, it emerges, lie between the parties concern four matters. Principally, they are: the design process; the use of Queen Street rather than St Andrew Square; noise impacts; and traffic issues. So far as the design process is concerned, we have heard evidence about the design manual and the prior approval process and the fact that, potentially, the community council would be involved in both those. Therefore, there should be ample opportunity, if the project proceeds, for further design involvement by the community council.On the major decision as to whether the route should go through the third side of St Andrew Square or through Queen Street, we have heard the evidence of the conflicting—in a way—traffic, design and aesthetic imperatives. We have heard the City of Edinburgh Council's view on the matter through Ms Grant. We do not know for positive what the view of Historic Scotland and the World Heritage Trust would be if they were confronted with a proposal to take the tram along the third side of St Andrew Square. Ms Grant's belief is that they would be opposed to it. What we know for sure is that they have not opposed the current proposal. In my submission, it is entirely reasonable to infer that, from a design point of view, both those organisations are content with the choice that has been made by the City of Edinburgh Council.We have heard from Mr Turnbull that the traffic issues are not insuperable. Whatever the precise combination of traffic by the time the tram arrives, the situation can be reviewed and detailed options will be available at that stage. The option that is being spoken to at the moment—the preferred option—involves dedicated running for the tram, but inevitably the possibility of shared running along part or all of that stretch of Queen Street would be open.So far as noise is concerned, we heard from Mr Mitchell on the issue of wheel squeal. He is confident that it will not occur, but, if he is wrong about that, he has described the various methods of dealing with it. First, it could be designed out. Secondly, first-aid measures—if I can describe them as such—could be applied. Thirdly, and ultimately, secondary glazing and noise insulation scheme options would be available, as adopted personally by Mr Todd already.In those circumstances, I invite the committee to be satisfied with the promoter's proposals and to conclude that the New Town, Broughton and Pilrig community council has raised no issue that might lead the committee to consider further the possibility of amending the bill.
The community council would like the committee first to observe that the heavy rail option, which would have involved running the line from Haymarket to Waverley on other railways, might well have resolved many of the design problems, but that option was not adequately considered. I accept that that is not a matter for amendment, but it is a matter for observation.We are not entirely satisfied that enough work has been done in considering how the design problems that arise because of overhead wires might be ameliorated by the use of ground rail electrification. Such a scheme exists elsewhere, although there is conflicting evidence on whether it is working. Let the bill be delayed and let the promoter provide further evidence on that. Clearly, the strong line that was taken by the mayor of Bordeaux might be to the benefit of the citizens of Bordeaux, but if the bill is passed, it will be left to TIE to do as it wishes on that issue. Indeed, that is true of many issues under the scheme. As we have heard, the witnesses were not satisfied with the assurances that they were receiving about noise.Above all, our concern is about the congestion that the scheme will cause. As Mr Welsh said, the promoter cannot create road space where it does not exist, but that is what TIE appears to be trying to do, especially in Queen Street. The key moment came when we heard from Mr Turnbull that, as a result of the tramline, west-east traffic in Queen Street will be reduced to one lane for both cars and buses and east-west traffic will be reduced to two lanes.If we consider tramline 2 on its own—as the committee must do—such a proposal is completely absurd. There is no reason why we need to create that situation, as the problem could be so easily avoided by routing tramline 2 around St Andrew Square instead. We have not heard that that fairly important option was given adequate consideration at an early stage. Rather, we heard from Ms Grant that an internal decision was made that the tramline would impact too greatly on St Andrew Square, but the people whom one might have expected to be consulted about that decision were not consulted. Therefore, the committee is put in the terrible position of having to speculate what people might say about such an amendment. The committee should tell TIE that it will not pass the bill as it stands without that matter being thoroughly considered and advertised.As a bunch of residents, members of the community council are not experts, even though some of them may have a certain amount of expertise, but they are greatly concerned about the impact of the proposed scheme on congestion in Queen Street, which will obviously add to the noise impact. Any opportunity of removing tramline 2 from Queen Street should be considered carefully. To my knowledge, St Andrew Square has no residents—at least, none has been mentioned—whereas the current proposal would affect residents near Queen Street.Above all, we urge the committee to give serious consideration to our proposal. The committee might ultimately decide that TIE is doing the right thing but, from what we have heard, the option has not been given enough consideration.
That concludes the evidence for New Town, Broughton and Pilrig community council. I thank Mr Mowat for his attendance.
Meeting suspended.
On resuming—
Ladies and gentlemen, I am sorry for the delay but, obviously, the process has turned out to be much more complex than any of us had imagined it would be. Basically, I must inform you that we will not be able to take any more evidence today due to the lateness of the hour, the unavailability of this room and the fact that, if we continued, we would be sitting simultaneously with the Parliament. We intend to take the evidence on the Scottish Rugby Union's objection next Tuesday at 2 pm. The clerks will be in touch with the other witnesses with regard to when their objections will be heard. I can only apologise to everyone. While it is no one's fault that this situation has arisen, it is clearly a matter of regret that people are being put to this inconvenience. I am sure that everyone concerned appreciates that it is difficult to anticipate the length of time that it takes to deal with each of the objections and that the committee wishes to be as fair as possible to everyone. I thank everyone for their attendance and apologise for any inconvenience that has been caused.
Meeting closed at 12:41.
In this meeting
Everything on 22 Jun 2005 →- Scottish Parliament Edinburgh Tram (Line Two) Bill Committee Wednesday 22 June 2005 Bill debate · 1
- Consideration Stage Evidence session · 1
- Proposed Route Changes Committee business · 5
- Consideration Stage Evidence session · 469
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.