Wednesday 22 June 2005 Edinburgh Tram (Line Two) Bill Committee Evidence session 469 contributions · 15 speakers

Speakers

Choose an MSP to read only their contributions

The record

469 contributions · showing 201–400
Steve Mitchell Environmental Resources Management
link

If the question is whether the other route would be the preferred route, I can say that I see no particular difference between them.

Jeremy Purvis LD Tweeddale, Ettrick and Lauderdale
link

I was just asking if, to your knowledge, there is anything different in terms of wheel squeal or ambient noise levels and so forth.

Steve Mitchell Environmental Resources Management
link

The ambient noise levels on the north of the square will be much lower than those on Queen Street. However, a different set of receptors and all the rest of it are involved. We would have to look at the issue in detail. The position is that we do not expect noise impacts in the area; that position would not change.

Bill Aitken Con The Convener · Glasgow
link

As there are no further questions from the committee, we return to you, Mr Thomson.

Malcolm Thomson
link

I have just one matter for re-examination. If I may, Mr Mitchell, I will return to wheel squeal. You said that you do not anticipate wheel squeal's being a problem. You referred to design measures that can be taken to avoid the problem and to the ultimate solution of recourse, which is the noise insulation scheme. Can other measures in between the two be taken? If you take all the care that you can take, follow all the guidance in the design manual and think that you have designed out wheel squeal, but—horror of horrors—it happens, is there anything that you can do before you must have recourse to the insulation scheme?

Steve Mitchell Environmental Resources Management
link

We can do three things, which I will list in no particular order. We can ensure that the driver navigates the bend at the optimal speed, which can be useful in preventing wheel squeal. We can carefully consider the condition of the rails, because wheel squeal can often be removed from a bend by polishing the rails and by grinding and reprofiling them. We can consider options for lubricating the track in order to reduce the frictional forces that generate the noise. There are various ways of doing that, which I need not go into. Again, if you are unlucky enough to visit a system that has a bend that squeals on a dry day, you might find that there is no squeal on a wet day. There are examples that clearly demonstrate that even water can alleviate the problem.

Bill Aitken Con The Convener · Glasgow
link

The next witness is Stuart Turnbull, who will address traffic impacts.

Malcolm Thomson
link

Mr Turnbull, will you give us an update—

Bill Aitken Con The Convener · Glasgow
link

I must interrupt you again, Mr Thomson. I stress that you may consider traffic impacts, but not the central Edinburgh traffic management proposals.

Malcolm Thomson
link

I will certainly not do so, sir. The update that I had in mind relates to Mr Turnbull's meeting last week with the objector. Did any matters arise from the meeting about which the committee should hear?

Stuart Turnbull Jacobs Babtie
link

Yes. The meeting was held on Thursday 16 June. I attended, as did a representative from TIE, Mr Mowat and two colleagues. We principally discussed some of the issues that have been raised in the objection and the various rebuttals—the committee has heard much of the matter. The meeting was positive and went a long way towards addressing the major issues, although the community council still has concerns.

Ian Mowat
link

Mr Turnbull, I note that you have 17 years' experience in transport planning. I put this question to Mr Evans, too: what is the major east-west route for road traffic through the centre of Edinburgh?

Stuart Turnbull Jacobs Babtie
link

Queen Street is starting to become the main east-west route.

Ian Mowat
link

Thank you. In your rebuttal, you said that modelling work on the tram's impact on junctions demonstrated that"in the majority of the locations the impact of re-routing of traffic would be minimal."Where would the impact be more than minimal?

Stuart Turnbull Jacobs Babtie
link

I will not go through every junction in the centre of Edinburgh. We reviewed the impact at 25 key junctions in the city centre, from Haymarket to St Andrew Square. We found that an increase of more than 10 per cent as a result of the tram was predicted at only two of the junctions. To give members a sense of what that means, 10 per cent variation is regarded as normal, day-to-day variation in a city context.The reasons for that are, first, that the tram would lead to modal transfer from car to tram. We have evidence from elsewhere that 15 to 20 per cent of the tram patronage is predicted to come from private car users. Secondly, the proposed scheme would result in few road closures or bans, so that, when the tram scheme is in place, people who want to drive through the city centre will continue to be able to use the routes that they currently use. Therefore we expect there to be a minimal impact on people's route choices. Thirdly, the designs that have been developed to date take cognisance of other road users. Throughout the route there are instances of sections of shared running, for example. The design acknowledges that it is not all about the tram; other road users, pedestrians and cyclists will continue to need to move through the city. The design takes a very integrated approach.Finally, it is worth bearing it in mind that, on tramline 2, six trams an hour will move through city centre streets that might also carry up to 2,000 to 3,000 vehicles an hour. As a result, I believe that the impact of the trams will be insignificant. I am not surprised that, according to the modelling, there will be a limited amount of what we term reassignment, which means drivers taking a different route.

Ian Mowat
link

You have not told me the two junctions where there will be a greater than 10 per cent variation.

Stuart Turnbull Jacobs Babtie
link

I do not have that documentation with me but, from memory, I believe that one of the junctions was certainly in the location of Queen Street and—

Ian Mowat
link

And North St Andrew Street.

Stuart Turnbull Jacobs Babtie
link

Yes.

Ian Mowat
link

And what is the other one?

Stuart Turnbull Jacobs Babtie
link

From memory, the other one is towards the west end at the junction of West Maitland Street and Manor Place.

Ian Mowat
link

Okay. The community council and I are more concerned with the junction at Queen Street and North St Andrew Street. If the variation is greater than 10 per cent, are we talking about 11 per cent, 20 per cent or more?

Stuart Turnbull Jacobs Babtie
link

From memory, I think that it is 16 per cent.

Ian Mowat
link

Were those figures arrived at before or after the impact of the central Edinburgh traffic management scheme, which has shut the east-west route along Princes Street to cars and pushed them all on to Queen Street, became clear?

Stuart Turnbull Jacobs Babtie
link

I appreciate that we do not want to get into detailed evidence on the central Edinburgh traffic management proposals, but I should perhaps briefly explain the process that we have gone through.You are correct to say that the designs in the bill were developed before the introduction of CETM. Indeed, when the documents were prepared, the CETM scheme had not even been approved. Further information on the matter is available in my witness statement, but I should point out that there have been more detailed assessments of how to integrate the tram and the CETM scheme throughout Edinburgh city centre. If the bill receives royal assent, we will need to carry out a detailed design process on the matter. However, the City of Edinburgh Council, which was quite rightly keen to identify any show-stoppers that might result from CETM, carried out some work that showed that, with some minor amendments to some of the layouts in the drawings to date, the tram and CETM could work side by side.

Ian Mowat
link

That answer was very general. Did you consider CETM's impact on the junction at Queen Street and North St Andrew Street and come up with any precise figures?

Stuart Turnbull Jacobs Babtie
link

The introduction of CETM has meant a number of modifications across the city. One key aspect is the move to prevent westbound traffic from going along Princes Street and, in effect, to relocate it to Queen Street, which I accept will impact on traffic flows in that corridor.As you might be aware, recent improvements throughout the city centre have resulted in the reconfiguration of Queen Street and the junction of Queen Street and North St Andrew Street to provide two westbound lanes for general traffic and, eastbound, one lane for general traffic and one for buses. The junction of Queen Street and North St Andrew Street has also been greatly simplified; the signalised junction has been turned into a straightforward pedestrian crossing and some traffic has been banned from heading southbound into North St Andrew Street.Although I fully accept that the introduction of CETM will lead to an increase in traffic flows through that area, the physical measures that have been introduced will improve—and indeed are improving—throughput at that junction. I believe that the junction operates more efficiently than it did before. The promoter's current tram proposals would have no impact on the westbound provision on Queen Street. According to the drawings that have been presented, the existing two lanes for general traffic would continue.

Ian Mowat
link

So there would continue to be two lanes for westbound traffic.

Stuart Turnbull Jacobs Babtie
link

Yes.

Ian Mowat
link

What would be available for eastbound traffic?

Stuart Turnbull Jacobs Babtie
link

For eastbound traffic over that short stretch, the drawings that have been presented to date show one lane for general traffic and one lane for trams.

Ian Mowat
link

What would happen to buses?

Stuart Turnbull Jacobs Babtie
link

To date, the proposal is that buses would travel in the same lane as general traffic over that short stretch.

Ian Mowat
link

You say that that is the proposal to date. Is there some doubt about that?

Stuart Turnbull Jacobs Babtie
link

As we have heard, there is an evolving design process. I expect that, as the detailed design is carried out, a number of issues will rightly be given detailed consideration. A key issue for the operation of that short stretch will be to minimise the length of eastbound queueing outside the Scottish National Portrait Gallery because of the potential for that to have a knock-on effect elsewhere on Queen Street. Through the phasing of the signalised junction at Queen Street and North St David Street, it might be prudent to hold traffic there longer to ensure that the short stretch of Queen Street outside the portrait gallery flows freely. That is common practice. Potentially, the buses might be allowed to share the tram lane over that short stretch. Through the design process, options can be developed within the limits of deviation to address the continuing change in traffic flows that will inevitably occur.

Ian Mowat
link

All your figures assume an element of modal transfer, as you call it, from the car to the tram and public transport. What percentage of modal transfer is assumed?

Stuart Turnbull Jacobs Babtie
link

It is difficult to give a single number. Although it has been stated that the trams will result in a 1 per cent reduction in car travel across the city, that figure is almost meaningless because it covers the whole city. Equally, the analysis has shown—

Ian Mowat
link

I will make the question easy for you. Do you know what modal transfer will take place for the Queen Street junction, which is what I am primarily concerned with just now?

Stuart Turnbull Jacobs Babtie
link

It is difficult to pull out just the modal transfer figure, as the modelling that we carry out deals with a range of things happening all at once. As the traffic management measures are introduced, there will be differences in traffic flows with and without trams, but not all those differences will necessarily be due to modal transfer, as there will also be an effect on travel patterns. I cannot say categorically that modal transfer will result in an X per cent reduction in traffic at that junction. However, the analysis for line 2 has shown that, for example, the predicted reduction in car trips to the city centre is of the order of 5 per cent.

Ian Mowat
link

Let me put to you an alternative scenario, which is that buses, as well as cars, will be held up by the trams, with the result that people will find the bus service less reliable. Thus, given that most public transport journeys in Edinburgh will still have to be undertaken by bus, people might return to their cars, so the modal transfer might happen the other way.

Bill Aitken Con The Convener · Glasgow
link

We are entering the realms of speculation. We are also returning to matters that were determined when we considered the principles of the bill.

Ian Mowat
link

I was merely pointing out that an important assumption in working out how such junctions will operate is that there will be fewer cars on the road, but that that assumption might not be right.

Stuart Turnbull Jacobs Babtie
link

There is no assumption as such. The switch from cars to trams, and indeed from buses to trams, is not assumed but is a function of the traffic modelling that we carry out. The modelling takes account of journey times and levels of congestion for different modes and, on that basis, predicts a level of transfer. It is not that we simply assume that a 5 per cent reduction in traffic will make a change; it is a function of the modelling.

Ian Mowat
link

Are you satisfied that the model will be able to handle the 208 bus movements an hour that, I am told, pass through that intersection?

Stuart Turnbull Jacobs Babtie
link

I have not counted them, but the number is of that order and there are something like 2,000 private vehicle movements.

Ian Mowat
link

On the question of signalling, you said that there were four options on the priority that could be given to the tram. The options range from treating the tram like an ordinary road user and making it go with the rest of the flow to giving the tram absolute priority. Which option would be appropriate for the junction of North St Andrew Street and Queen Street?

Stuart Turnbull Jacobs Babtie
link

That is a matter of detail and I can only give a view at this stage. I would expect that the tram would not be given full priority on that short stretch.

Ian Mowat
link

Would that be priority level 3 in your rebuttal?

Stuart Turnbull Jacobs Babtie
link

Yes. Level 4 is the absolute priority.

Ian Mowat
link

Yes, and it would involve the red light changing instantaneously.

Stuart Turnbull Jacobs Babtie
link

The process is dynamic, because the traffic signalling system in the city centre is linked to reflect traffic movements as they occur at different times of the day. It adjusts itself to reflect queueing throughout the city centre in order to avoid a gridlock developing. It might be that the tram would have absolute priority at various times of the day but that, on short stretches during the peak hour, the impact of that on other road users would be considered significant enough to warrant lowering the level of priority.

Ian Mowat
link

Does not that have a huge impact on the modelling of how other traffic will be affected at those junctions?

Stuart Turnbull Jacobs Babtie
link

I will give you a specific example of how a certain junction will work, although the situation will vary from junction to junction. A traffic-signal junction will tend to work in what we class as a cycle time of 90 seconds or 120 seconds. That means that it takes 90 seconds for the lights to get back to where they were. In the modelling, we have assumed that a tram will arrive during every cycle, which would mean that there would be a tram coming along every two minutes. Clearly, however, that will not be the case.

Ian Mowat
link

It is nearly the case, because you are going to be running 14 trams—

Stuart Turnbull Jacobs Babtie
link

We are running six trams per—

Ian Mowat
link

Yes, but you are going to run another eight on tramline 1, which will come down the same line.

Bill Aitken Con The Convener · Glasgow
link

I will intervene at this point to draw the parties' attention to the fact that the committee needs to make a determination on each objection. We require to know what you want us to do, because we are now dealing with the minutiae of the situation. I am quite happy to let you go a little further down this route, but I would like to think that, shortly, we will see what you are seeking to achieve.

Ian Mowat
link

Mr Turnbull, do you accept that we are talking about 14 trams an hour using those junctions, not six?

Stuart Turnbull Jacobs Babtie
link

We are considering line 2.

Ian Mowat
link

Come on, it is completely ridiculous to model the junction using only the line 2 trams.

Stuart Turnbull Jacobs Babtie
link

The modelling that we have done assumes that there will be 30 trams an hour, because we have assumed that a tram will arrive every two minutes.

Ian Mowat
link

I just wanted to make that clear. Do you agree that a lot of traffic problems would be solved if line 2—with its six extra trams an hour—did not come down on to Queen Street? Surely that junction would become less congested if those six trams did not use it.

Stuart Turnbull Jacobs Babtie
link

There would be less vehicle movement through the junction, which would mean that there would be fewer delays and that it would operate more effectively. However, that answer comes at the issue purely from a traffic point of view and we have heard evidence about many other issues.

Ian Mowat
link

Can you think of any adverse traffic implications of terminating tramline 2 round St Andrew Square on North St Andrew Street? I appreciate that that is a matter of detail.

Stuart Turnbull Jacobs Babtie
link

In your previous question, you asked me to consider the fact that we are promoting two tramlines. As we are promoting two tramlines, the intention is still for tramline 1 to come along York Place and to enter the square, so there will still be trams travelling through the junction of Queen Street and North St Andrew Street, irrespective of whether tramline 2 runs round the north side of the square.

Ian Mowat
link

Yes, I see that. However, I am asking whether, if the six trams an hour on tramline 2 went around the north side of St Andrew Square and the eight trams an hour on tramline 1 went down the route that is planned for it, that would improve the traffic position.

Stuart Turnbull Jacobs Babtie
link

I could not say for certain, as I have not done that modelling. However, any junction in the city would obviously operate better if there were a reduction in the traffic flow.

Ian Mowat
link

Would it also help if you had a layover point there so that, if something were to go wrong with tramline 2, tramline 1 would not be blocked, as there would be an extra layover line for tramline 2?

Stuart Turnbull Jacobs Babtie
link

Potentially, it would help. However, if lines 1 and 2 are constructed, there will be adequate layover facilities, irrespective of the route of the tram round that part of the city.

Ian Mowat
link

Let us briefly discuss Shandwick Place. You looked at Mr Welsh's evidence and said that putting the tramline down Shandwick Place and into the west end of Princes Street would not result in increased traffic along the access from Randolph Crescent to Queen Street. Do you really hold that position?

Stuart Turnbull Jacobs Babtie
link

I mentioned previously the requirement to take account of the needs of other road users and the implications of that for the alignment of the tram and the level of segregation. As you are aware, the proposal is that the tramline will share a running section on Shandwick Place and will operate in the same way as other vehicles, with no priority.

Ian Mowat
link

No priority at all?

Stuart Turnbull Jacobs Babtie
link

It will operate in a lane that is shared with other road users.

Ian Mowat
link

So, a car or a bus can sit there and a tram will have to wait its turn. Is that a definite commitment?

Stuart Turnbull Jacobs Babtie
link

As we have heard several times, the detailed design process, which will consider a number of issues within the limits of deviation, is still to be carried out. I expect that one of the issues to be considered in detail will be the extent of shared and segregated running. As things stand, however, I cannot give a commitment that that will be a shared running section.

Ian Mowat
link

I have one other question. You are well aware that overhead lines are likely to be used, which will clear the height of a double-decker bus so that buses are not impeded in their flow. Do you think that open-top tourist buses will be able to operate under the proposed regime?

Stuart Turnbull Jacobs Babtie
link

I do not want to repeat Mr Oldfield's evidence.

Bill Aitken Con The Convener · Glasgow
link

We have already had that question.

Ian Mowat
link

In that case, that concludes my questioning.

Alasdair Morgan SNP South of Scotland
link

Mr Turnbull, let us confirm the figures that you have given for the traffic that will pass through the junction if both tramlines are there. Did you say that it will be 2,000-plus cars, 200 buses and 30 trams? Are those the rough figures?

Stuart Turnbull Jacobs Babtie
link

No. In assessing the operation of the junction, we look at a traffic signal cycle that lasts for two minutes. We assume—in effect, to test the operation—that a tram will arrive every two minutes. We are not assuming that there will be 30 trams per hour; that figure is used for the design process.

Alasdair Morgan SNP South of Scotland
link

You gave us figures of 2,000 or more cars and 200 or more buses. What would be the equivalent figure for the trams?

Stuart Turnbull Jacobs Babtie
link

The number of trams through the junction would be six per hour on tramline 2.

Alasdair Morgan SNP South of Scotland
link

And then 14 for the other line. So the figures would be 20 trams, 200 buses and 2,000 cars.

Stuart Turnbull Jacobs Babtie
link

It would be of that order. It would vary by time of day and time of the year, for example.

Stuart Turnbull Jacobs Babtie
link

My understanding is that the figure would be the same. There would be six trams per hour through to 1.30 am, I think, for tramline 2.

Malcolm Thomson
link

Mr Turnbull, if one took account of both lines, would the number of trams that run through the junction be six plus eight?

Stuart Turnbull Jacobs Babtie
link

That is correct.

Malcolm Thomson
link

I am thinking about your evidence on Shandwick Place and the shared running there. Where there is shared running on a stretch such as Shandwick Place, would there be any priority for the trams at junctions?

Stuart Turnbull Jacobs Babtie
link

There would be a mechanism for that. Along the length of the tram route, there would be some form of detector to enable the tram to advise of its approach to a junction. The control system that operates all our signalised junctions would take appropriate action, which might be to introduce a phase of the lights to let the tram through the junction or to say, "Tough: you'll have to sit in the queue."

Malcolm Thomson
link

Might the odd car benefit from the priority that would be afforded to the trams?

Stuart Turnbull Jacobs Babtie
link

Yes, it would in such instances.

Malcolm Thomson
link

So, even in shared running, a degree of priority would be afforded to the trams.

Stuart Turnbull Jacobs Babtie
link

Yes. There would be a mechanism for that.

Bill Aitken Con The Convener · Glasgow
link

Thank you, Mr Turnbull. That concludes the promoter's evidence on the objection. We now turn to the objector's witnesses, Alan Welsh and David Todd. We will suspend briefly so that those witnesses can come to the table and the present batch of witnesses can return to the public gallery.

Meeting suspended.

On resuming—

Bill Aitken Con The Convener · Glasgow
link

We move on to the objector's witnesses Alan Welsh and David Todd.Alan Welsh and David Todd took the oath.

Bill Aitken Con The Convener · Glasgow
link

The first witness is Alan Welsh, who will address service relocation, noise, visual impact, congestion, segregated tram tracks, tram-prioritised intersection signalling and route change.

Ian Mowat
link

Mr Welsh, I understand that you give evidence on behalf of the New Town, Broughton and Pilrig community council.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

That is correct.

Ian Mowat
link

I also understand that, for a number of years—until this month, in fact—you were chairman of that council.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Yes, I was chairman for four years.

Ian Mowat
link

I understand that you were chairman during the time that the objections were required to be lodged and amplified, until June of this year.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

That is correct.

Ian Mowat
link

I understand also that you have a professional background in engineering.

Bill Aitken Con The Convener · Glasgow
link

Mr Mowat, that is all in the witness statement.

Ian Mowat
link

I did not think that that latter point was, but I think that it is relevant to hear briefly where Mr Welsh worked.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

By profession, I am an engineer. For 37 years, I worked with GEC Alsthom as a project engineer—that is, someone who works on technical and other definitions.

Ian Mowat
link

We have got that, thank you. I understand that the community council has no objection to the tramline in principle but is concerned about the various effects that routing it through the city centre would have.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

We are particularly concerned about the congestion that might arise during the construction of the tramline and during its operation. We are rather upset that, in the early stages of the tram procedure, no community liaison group was set up for our area of the city. Groups were set up for the west end and for Leith Walk, but there was no community liaison group for central Edinburgh, which our community council covers. To a certain extent we have been disadvantaged, because we came to the process late.

Ian Mowat
link

Nevertheless, you have lodged a fairly wide-ranging objection. We will deal with the issues one by one. On construction, are you now content with what you have read in TIE's witness statements and heard from its witnesses? TIE has mentioned the Control of Pollution Act 1974 and certain measures that it will take.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

We are not content with the assurances that have been given on construction. We are particularly concerned that, although it is generally accepted that, to put a tram track down, it is necessary to remove all surfaces from beneath the tram track, many people are not aware of the repercussions of removing and relocating all underground sewers, water mains, gas mains and electricity mains throughout the centre of the city—in particular, in our case, in the Queen Street and York Place corridors. That will be vastly disruptive. To accommodate the construction process, traffic will, of necessity, be redirected into other areas. We are concerned that the redirected traffic will go through residential areas. As you are aware, Princes Street is now out of bounds to normal traffic; if Queen Street and York Place are under construction, they too will become out of bounds.

Ian Mowat
link

Would it ameliorate some of the problems if, as I understand is your suggestion, tramline 2—which we must consider on its own—were to terminate at St Andrew Square and not turn down to Queen Street?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

That would ameliorate every problem, except for the concern about York Place. However, it would ameliorate every problem in relation to tramline 2.

Ian Mowat
link

We are dealing only with tramline 2.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

In that respect, there would be no disruption on the Queen Street corridor, which, as previous witnesses have pointed out, is now the major east-west traffic route through the city. If the tram were not taken in front of the Scottish National Portrait Gallery on Queen Street, there would be no problems with construction or operation.

Ian Mowat
link

Mr Evans said that St Andrew Square is of such architectural and heritage importance that to run a further line round it would be very serious from a planning point of view. As a former chairman of the community council that covers the new town, do you agree with that?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

There are problems with St Andrew Square. As previous witnesses have mentioned, there are plans afoot with regard to the public realm. Those plans, which have been played down to a certain extent, have had major repercussions for the response from Historic Scotland and the Edinburgh World Heritage Trust to the location of tram routing through St Andrew Square.I point out that, although St Andrew Square has a few grade A listed buildings, the buildings within the square are predominantly 20th century—I am sure that you have all been to Harvey Nichols, which is very recent—and many of the buildings are not of the highest quality. There are older buildings on the north side of the square, where we suggest that the tram route could go, but they have been vastly reconstructed—I refer to the IBM office, for example. The quality of the architecture in St Andrew Square is in no way comparable to that in, say, Charlotte Square. It is common knowledge that Queen Street and York Place probably have the longest unspoiled and uninterrupted Georgian architectural vistas in Europe, but they are major traffic corridors and trams could also potentially run on them.

Ian Mowat
link

We have heard that there was at least—

Bill Aitken Con The Convener · Glasgow
link

Mr Mowat, I take it that we will get to the outstanding issues at some stage.

Ian Mowat
link

I understand that a key outstanding issue for Mr Welsh and the New Town, Broughton and Pilrig community council is that they simply do not agree that tramline 2 should go down to Queen Street.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

We are particularly concerned about the overhead electrification system. The New Town, Broughton and Pilrig community council has responsibilities for the area from the west end of Princes Street to Leith Walk, which encompasses a large chunk of the proposed line 2 route. I am sure that we are all aware that the prospect from Princes Street has been legally protected for 200 years. There have been many fights over the matter—people did not even want St John's church at the west end of Princes Street to be built because it would block the view. The overhead cables would be a major incursion on the setting of listed buildings on Princes Street.We have presented evidence on the Bordeaux tram system. The site there is a world heritage site and the mayor did not want overhead cables in his city, so the system was put underground, on the mayor's insistence. There were initial teething problems, but they have been sorted out and the system is now running at 99 per cent capacity. We commend the Bordeaux experience to Edinburgh as a solution to many problems.

Ian Mowat
link

You are not satisfied that everything has been done to protect listed buildings and so on, and that remains an outstanding issue.We have heard that you are not satisfied with the construction, so we will pass on to the operation of the trams. I will leave aside congestion for a moment. Are you satisfied with what you have heard regarding wheel squeal and the various ameliorations of it that are possible?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

As a long term city-centre resident with personal experience of the traffic—I walk everywhere in the city centre—and an engineer with knowledge of tram systems, I dispute what previous witnesses have said about there being no, or hardly any, wheel squeal at a corner. The minimum design radius for the tram is 24m. On the corners that come out of St Andrew Square into Queen Street, the design radius is 25m, which is so close to the tolerance that it is not true. The road is also on an incline—it goes down a hill and then turns round a very sharp corner. Normally in such a system, what is technically known as a third rail would be put on the corner to stop the tram coming off and to stop wear. The third rail would be above the road level by around a centimetre—12 mm—which is an added complication.Wheel squeal and wheel screech are almost certain to happen at the location in question. The ameliorations that witnesses have suggested of lubrication and running trams very slowly around the corner are possible, but they are only ameliorations and, technically, there will be wheel squeal. The problem with the noise figures is that they cannot predict the amount of wheel squeal, as they do not show the peak level of noise at any particular time—they are averaged out over an hour. The peak noise that a tram would make when it goes round such a corner for 10 seconds would be considerably in excess of what previous witnesses have said that it would be. Wheel squeal and wheel screech are a problem, and would be a particular problem on that corner.

Bill Aitken Con The Convener · Glasgow
link

We have the written evidence and we appreciate concerns about wheel squeal. Can we move on?

Ian Mowat
link

Yes, absolutely. The witness heard Mr Turnbull say that 10 per cent variation in traffic congestion is normal—during the day, I presume—and that the modelling of congestion at that junction suggests a variation of only 16 per cent. Would not that be acceptable?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Previous witnesses have admitted that there will be levels of prioritisation for vehicles as they pass through intersections and that the tram will have top priority. We are concerned because the Queen Street and Dublin Street intersection, which is of particular interest to the community council, has three sets of lights—

Ian Mowat
link

Sorry, but people might become confused. Are you talking about the tramline junction at North St David Street, where the route goes down to Queen Street and up to North St Andrew Street, with Dublin Street blocked off in the other direction?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Yes. There is also a bus route. For tramline 2 there would be just two intersections, which technically would have to be linked so that the tram could have priority and not be blocked. The lights would switch simultaneously and other traffic would have to stop to allow the tram free access through both intersections. Therefore, traffic would be held up. The same operational problem would arise at the West End, where three sets of lights, at Shandwick Place, Princes Street and Lothian Road, would have to be switched simultaneously to let the tram through. All other traffic would stop and there would be an appreciable transit time as the tram passed through the intersection.

Ian Mowat
link

We heard evidence from Mr Turnbull that, at the West End, the tram might well run simply as if it were any other vehicle on the road, and would be given no priority. Would that be workable?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

I attended a public meeting in Edinburgh that was attended by representatives from the Scottish Association for Public Transport and Mr Andrew Wood, the manager of Transdev Edinburgh Tram, which would run the tram system on behalf of TIE. Mr Wood is an experienced tram operator who set up and operated the Nottingham system, so he has vast experience of such systems. He said that in his opinion there will be much more segregated tram track than is envisaged in the bill. I expect that the tram will eventually have to run in a segregated lane at Shandwick Place, which will not leave much space for buses and other traffic, because there are only four lanes on Shandwick Place.

Ian Mowat
link

The community council suggested in its original objection that if the tram ran on the heavy rail through the centre of the city, many problems would be avoided. Mr Oldfield responded that such an approach would not be practical for a number of reasons. Are you satisfied by his response?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Mr Oldfield's response to our suggestion raised a number of issues that are of interest—let me put it that way. I am sure that the committee is aware that Waverley station will be revamped and that two more through tracks through Waverley will be provided. To that end, the signalling from Haymarket to Waverley will have to be upgraded. In our submission we noted—

Ian Mowat
link

The issue is outstanding. The community council made three proposals: first, that the heavy rail option be considered; secondly, that even if the heavy rail option is not considered, the tramline be moved from Queen Street to a route round St Andrew Square; and thirdly, that rubberised track be used. We heard that rubberised track base will be used. Are you satisfied by that?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Yes. There are also such things as polythene sleepers. Although rubberised track—

Ian Mowat
link

It is rubberised track bed, not track.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Polythene sleepers provide additional vibration insulation and could be used city centre-wide.

Ian Mowat
link

You maintain the community council's other two suggestions: first, that the heavy rail option should be considered; and, secondly, even if that is discarded, that tramline 2 should end at St Andrew Square and be routed round the north of St Andrew Square.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Yes. The heavy rail option would remove many of the design problems. Most of the problems that arose in objections, that will arise and that will be considered would not arise if the route that was chosen used preserved rail tracks, which are preserved as transport corridors for a reason. Development has never been allowed on them; they were preserved to be used for transport. I am puzzled about why that engineering solution has not been considered more seriously.

Ian Mowat
link

Is the committee clear about where Mr Welsh stands?

Ian Mowat
link

In that case, I end my examination of Mr Welsh.

Malcolm Thomson
link

Good morning, Mr Welsh.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Good morning.

Malcolm Thomson
link

First, I will ask you a little about the catchment area of your community council. The original objection says that it includes"Princes St, St Andrews Sq, York Place, Picardy Place and Leith Walk down to Pilrig Street."

Alan Welsh New Town, Broughton and Pilrig Community Council
link

That is correct.

Malcolm Thomson
link

I have read somewhere else that the area ends at Hope Street towards the west. Is that correct?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

In effect, it ends at Queensferry Street.

Malcolm Thomson
link

What about Randolph Crescent?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Randolph Crescent is included in our patch. We go down Queensferry Street to Dean bridge and down to the Water of Leith. The committee received objections from Lord Moray's feuars, who reside in the Randolph Crescent area, which is particularly inconvenienced by the central Edinburgh traffic management rearrangements. They consider that if Shandwick Place were heavily overtrafficked with trams, buses and normal traffic—

Bill Aitken Con The Convener · Glasgow
link

I interrupt to point out that that objection was withdrawn.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

The objection has been withdrawn? No it has not.

Bill Aitken Con The Convener · Glasgow
link

The witness statement from Lord Moray's feuars has been withdrawn.

Ian Mowat
link

The witness is not available to give evidence.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

The feuars have not withdrawn their statement.

Ian Mowat
link

Technically, the convener is correct. If a witness does not come along, the objection is deemed to have been resolved. On the other hand, the New Town, Broughton and Pilrig community council made similar points about Shandwick Place, so the points were made twice.

Bill Aitken Con The Convener · Glasgow
link

If Mr Welsh is making the same point from a different angle, that is fair enough.

Ian Mowat
link

I think that he is.

Malcolm Thomson
link

Is Shandwick Place outwith the area of your community council?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

That is correct.

Malcolm Thomson
link

It is in the area of the West End community council.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

That is correct. However, the three intersections at the end of Shandwick Place, which are a crunch point, are in our patch.

Malcolm Thomson
link

The West End community council is not an objector to the bill.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

I am not aware of that.

Malcolm Thomson
link

My next questions will help the committee to have a feel for whose views, beyond those of you and Mr Mowat, are being described when you give your evidence. Have your witness statement and rebuttal been before a committee of the community council? Were they voted on at any annual general meeting? Will you give us a flavour of the process?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Because of the amount of work that the community council must do, it divides the work among sub-committees. We have a traffic and transport sub-committee, which Mr Mowat convenes. It contains four or five community council members; I am not one of them. That sub-committee has considered all the documentation that has been submitted to the committee throughout the process.

Malcolm Thomson
link

As I understand it, you were not on the sub-committee, because you were the chairman.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

I was on the sub-committee for the first objection at the beginning of the process.

Malcolm Thomson
link

So how has the work of the sub-committee been factored into your statement?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

I am sorry, I do not understand.

Malcolm Thomson
link

We have a witness statement from the community council, to which you have just spoken. Am I wrong in thinking that it is your personal statement?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

It is signed by me as chair, but it is the evidence of the traffic and transport sub-committee.

Malcolm Thomson
link

My difficulty is in understanding how you are speaking to something that presumably originated in the sub-committee that was tasked to examine the issue—or am I wrong about that?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

As chairman, I usually speak on behalf of sub-committee chairpersons.

Malcolm Thomson
link

So did the sub-committee report its findings in relation to the objection to the full committee, of which you are the chair?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Yes.

Malcolm Thomson
link

Does the witness statement that you have spoken to today reflect the recommendations from the traffic and transport sub-committee?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

It only does not do so in so far as some of the technical aspects are from my personal experience as an engineer. The rest of the written statement is from the community council traffic and transport sub-committee.

Malcolm Thomson
link

Did some form of report go from the traffic and transport sub-committee to the main community council?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Yes. The traffic and transport sub-committee has separate meetings, and it reports what it has been discussing to the full community council on a regular basis.

Malcolm Thomson
link

Were the issues in your statement discussed by the full community council?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Yes.

Malcolm Thomson
link

The options that you have been speaking about are for the tram to go either round the north side of St Andrew Square or into Queen Street. Given that your organisation is also concerned with St Andrew Square, was there any discussion in the community council of the pros and cons—particularly the pros—of the tram running into Queen Street rather than round St Andrew Square?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Yes. The community council was concerned because as a residential area we are subject to rat-running, as I explained with regard to congestion. The City of Edinburgh Council is aware of rat-running and has been good to us in certain respects by closing off certain streets. Given the amount of extra traffic along Queen Street that will result from the trams, we are concerned.

Malcolm Thomson
link

Did the community council consider—

Bill Aitken Con The Convener · Glasgow
link

Mr Thomson, will you clarify where we are going with this? I have not seen any of this in any witness statement.

Malcolm Thomson
link

I am simply exploring the extent to which we are discussing the views of one person or of a large swathe of the community.

Bill Aitken Con The Convener · Glasgow
link

I can see the fishing expedition that you are on, but we have to deal with what is before us. I would prefer it if this did not go too much further.

Malcolm Thomson
link

I hear the point, sir.Did the community council consider the aesthetic aspects of having the tram running round the north side of St Andrew Square, as spoken to today by Mr Evans?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

The community council did not consider the aesthetic aspects of that suggestion.

Malcolm Thomson
link

Because it was more concerned with traffic issues, such as rat-running.

Alan Welsh New Town, Broughton and Pilrig Community Council
link

It was more concerned with congestion. We are a city community council and we are considering not just our own interests; we are located in the city centre, so we consider the interests of everybody. We can see that there is a major problem with overlaying a tram system on an existing efficient bus system on limited road space. As an engineer, I would love to be able to create space out of fresh air, but that cannot be done. If a road has only four tracks, one cannot make five. One of the major problems with the tram system is that it is attempting to make more space where there cannot be more space. The community council's main concern is that we cannot see how additional traffic requirements can be met within the limited space in the world heritage site without causing major knock-on effects elsewhere.

Malcolm Thomson
link

Do you know roughly how many listed buildings there are in St Andrew Square?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

Off the top of my head, I would say that there are not more than 15, and they are mostly on the north side.

Malcolm Thomson
link

Do you have any particular expertise or qualifications in tram design or tram construction?

Alan Welsh New Town, Broughton and Pilrig Community Council
link

I have worked more on aspects of the metro side of the business, on the Jubilee line extension down in London. My firm was also heavily involved with the Docklands light railway, so I do have a certain amount of experience. As a systems engineer, I was taught that if, when one considers a solution to a problem, it throws up more extra problems than one can deal with, it is always sensible to consider an alternative. In my experience as an engineer, if one insists on going down the road of the first decision, the repercussions or knock-on effects can be horrendous. I have worked on many projects in which we tried to design our way out of a problem, but if we had gone back and considered the original design, the problem would have gone away.

  1. Scottish Parliament Edinburgh Tram (Line Two) Bill Committee Wednesday 22 June 2005 Bill debate · 1
  2. Consideration Stage Evidence session · 1
  3. Proposed Route Changes Committee business · 5
  4. Consideration Stage Evidence session · 469

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.