Are we all comfortable with the findings of the House of Commons and with the European Union advice on reductions and limits?
Official Report · Committee
Telecommunications Development
Speakers
Choose an MSP to read only their contributions- Andy Kerr Lab 36
- David Lumley Department of Trade and Industry 36
- Roger Wilkins Vodafone Ltd 31
- Richard Rumbelow Orange Personal Communications Services Ltd 26
- Gordon Sleigh Atlantic Telecom Group plc 21
- Linda Fabiani SNP 17
- Nora Radcliffe LD 15
- Robin Harper Green 14
- Murray Tosh Con 11
- Cathy Jamieson Lab 10
- Nick Greer Vodafone Ltd 10
- Kenny MacAskill SNP 9
- Patrick McDonald Department of Trade and Industry 9
- Nicholas Williams Department of Trade and Industry 8
- Bob Perkins Cellstructures International Ltd 8
- Des McNulty Lab 8
- Helen Eadie Lab 6
- Richard Atkins Cellstructures International Ltd 5
- Janis Hughes Lab 2
- Elaine Smith Lab 1
The record
285 contributions · showing 201–285Discussions are on-going between industry and the Department of Trade and Industry. In light of the Stewart inquiry, which is due to report in the spring of next year, a decision on how the United Kingdom wants to take forward the adoption of the European Union recommendation or the much stricter full ICNIRP compliance will be forthcoming.
As I mentioned earlier, Vodafone is now a Europe-based company. We took the decision prior to the publication of the select committee report to fall in line with the EU recommendations, which are based on ICNIRP.
Do the limits that are being discussed have an impact on the geography and unique aspects of the Scottish landscape? Will there be any effect on the rollout and service levels?
No.
The EU may ask for levels to be reduced fivefold. Is it not the case that the inverse square law applies to radiation? For example, if the distance was 8 m and it was doubled to 16 m, that would achieve a 64-fold reduction. Therefore, only a modest increase in safety distance is required to achieve a fivefold reduction.
Is there any impact on exclusion zones around masts?
At Orange, we are still assessing the implications of moving to the EU recommendation or to full ICNIRP compliance, which will mean assessing the location of the sites that we have. One aspect of meeting either of the two new guidelines will be to examine the exclusion zones that apply to our sites, particularly in locations to which the public have unrestricted access or where we do not have full control over certain types of installations. Exclusion zones are present now and will be required in the future.
Are there any issues to do with physical protection in sensitive areas, such as schools, hospitals and high-rise flats? Does industry have any views on the matter?
We have secure compounds around our towers, because we do not want people to enter and damage either themselves or the equipment.
What is the view of Cellstructures International?
As infrastructure providers, we place a requirement on ourselves to ensure that our installations are totally secure. The network operators require it of us too, but even if they did not, we would ensure it, because it is the way in which we operate. We build appropriate additional space into the initial plans for any site to ensure that sites are totally secure. As some of the installations that we are currently considering are in places such as professional sports grounds, they need to be—and are—well protected.
We are talking about an evolving planning framework and protocol for how operators site their facilities. If we were to move to an arrangement of exclusion zones for future planning applications, would it be possible to review existing installations? What implications would that have? Are there installations that have been sited in areas that might now be in exclusion zones under current or future procedures?
We stated in August that all base stations that we bring into service from now on will conform to EU requirements—if I understand the question. Although we believe that all our existing sites conform to those requirements, they will be checked and those that infringe the regime will be modified by the end of 2000.
I just want to clarify what your definition is. If you are referring to exclusion zones as primarily the distance around the antenna to which someone can gain uncontrolled access, then exclusion zones are generally around a few metres. For example, in the case of a ground-based 15 m mast, that means that nobody could gain access to that exclusion zone.If you are referring to a more general precautionary principle about the siting of base stations hundreds of metres away from certain types of installations or residential land use, such zones would have an impact on the ability of operators to provide service to some places.
There might be locations where it is difficult to disinvent the past, but I got the impression that you would examine your existing pattern of installations and review those instances where what is in place would not meet the planning criteria that you now consider appropriate.
I do not believe that any of our current installations would fall foul of the exclusion zones you describe but, if they did, we are in a different position from mobile operators, as we are a fixed-line operator. To remove a base station would disrupt service to customers, to whom we are obliged to provide service. We might fall foul of the regulatory system if we attempted to do that.
I am still slightly confused about the nature of the question—I am not being rude. If you are suggesting that a precautionary principle could be introduced with an arbitrary figure of hundreds of metres, that would have a significant effect on our activity. However, if we are talking about the kind of exclusion zones that arise from the proposed legislation—a few metres or tens of metres at most—there is not an issue.
You talked about the effect of a 200 m exclusion zone. In terms of technology, why would that have such a detrimental effect?
Because one would be that much further away from the customers one is trying to reach.
It is all about proximity.
If there were a site for this building that was 200 m away, one can imagine all the stonework the signal would have to get through. It just makes life so much more difficult.
Principally, what would happen is that large areas of city centres would not have any coverage at all, as one could not use existing structures of any description to locate stations. There is a misconception that we are able to provide coverage from a base station on the periphery of a city: it does not work in that way. We need base stations in the heart of cities to provide coverage. A precautionary principle that introduced a limit above 100 m or so—even 50 m—would mean that a lot of people would be unable to use mobile phones in city centres.
Is it fair to say that the microcells technology that is coming may resolve some of those issues?
That is true in the sense that the more there are, the lower power they are, but that would mean filling the place up with microcells.
Can I ask an idiot question? How big is a microcell? We are talking about filling the place up, but is a microcell something that could be plonked on top of a lamp post and nobody would notice, or is it the size of a suitcase?
It is typically the size of a burglar alarm. It can be located on the side of buildings. It can be disguised as streetlight furniture or located on top of existing streetlights.
I would add the rider that, although microcells certainly represent part of the solution, the important issue for us is that the industry is dynamic. Subscriber numbers are rising. Therefore, at some stage further down the line, there will arguably be a need for additional capacity. A larger cell may become desirable to obviate the number of small boxes.
Would any of the witnesses like to add anything to the answer that I received to my question to the DTI about satellites? Do you concur with its view, and see that technology coming into being?
Satellites offer a valuable service. At least one commercial satellite service is up and running, perhaps two. However, we have 5 million customers in the United Kingdom, and I cannot conceive of the technology that would get 5 million users through a satellite link.
Am I right in saying that the limiting factor on the whole service provision is the mobile phone itself and how far it can send a signal?
Pretty well, yes.
Let us move on to planning issues.
The DTI evidence earlier brought out the likelihood that, as the cells were split and demand increased, many more masts would be needed and your business would have to develop. How will the pace of that development be affected in practice by the move to prior approval and, beyond that, by the suggested move to full planning controls? How will that affect the future of your industry, your market and your consumers?
To answer your first point, permitted development has been an essential element of the ability of UK networks to roll out in the time that we have done. The reason it has been essential is, first, to allow us to meet the obligations in our licence to fulfil the initial coverage objectives that were set and, secondly, to allow us to provide coverage for the expanding market of customers.Orange alone has probably spent in the region of £1.5 billion on the network. That figure has, I am sure, been replicated by the other three networks. Providing a network is a serious financial business; it is the core of what we do. There needs to be some process by which the development of the network can meet the coverage expectations of customers. We would not have been able to meet that 90 per cent minimum coverage figure without permitted development rights, and prior approval as part of that, being an integral part of the planning system in which we work.We have said—and this was our response to this committee and to the Scottish Office in the original consultations on this issue—that we are more than happy to work, in Scotland, within the prior approval process that is now in place in England and Wales. That process gives the certainty of greater public involvement in consultation than there is at present, and it gives local authorities 42 days to consider an application, in terms of both planning consideration and public consultation. It also keeps the important premise of permitted development. As the DTI outlined earlier, the licensing of third-generation systems is now underway. Networks for that will not be rolled out until 2002 at the earliest. If we are to meet the coverage figure of 80 per cent—sorry, if the licensees are to meet the coverage figure—
Come on. Surely the future is bright. Laughter.
There will have to be some mechanism in the planning system to ensure that we meet that target. Otherwise, it will be very difficult to do so.
I go along with that. I would welcome the amendment in Scotland to include the prior notification and all the benefits of that. It works fine. It is a short cut that you can take after you have made all the decisions, reached all the agreements, and are wondering how to get through the final process. The local authority is comfortable because it has been involved in less effort but is happy with what you are doing. The alternative is to slow things down.
I concur with my colleagues, but I will add that it would be detrimental to the industry—particularly to a Scottish-based company such as Atlantic—if planning regulations in Scotland were different to those in the rest of the UK. The licences by which we operate are issued by the UK Government.Over the past few years I believe that we have been doing exactly what is being advocated in terms of permitted development rights. We have consulted planning and estates people and we have taken their views into account in all the developments in which we have been involved.
In following on from that answer, if full planning control were to be introduced it would slow development down and companies would have to live with that, but how significant an additional burden would that be?
Undoubtedly it would be an additional burden, but at the end of the day how significant that would be would depend on the guidelines that were issued by bodies such as the Scottish Parliament to local authorities, and on how those guidelines were interpreted by local authorities.One of the problems that we have faced over the past year or year and a half is that there have been various sets of guidelines relating to what planning officials and planning committees should or should not do. That is true particularly in relation to health and safety concerns. Interpretation has been different from authority to authority. What is required is a clear set of guidelines that we, as operators of both fixed and mobile phones, can understand and can operate within. It is also important that planning authorities in local authorities can understand them and operate within them.
Would anyone like to come in on that?
I would like to defer to my colleague in the public gallery, if it is possible for him to answer.
He will need to join you at the table.If you use a microphone, that will allow you to become part of the process. Please give us your name.
My name is Nick Greer and I am the environmental and planning manager for Vodafone.I can provide anecdotal evidence to answer the question. Vodafone has, since 1994, written to all local planning authorities in the UK because we experienced difficulties as a result of planning officers' understanding of the legislation, and—as the committee has heard from some of my colleagues—with some of the technology. That is one of the reasons why I encouraged the company to produce an environmental handbook, which I will plug because I wrote it.When the handbook was distributed last in April 1999, the best response was from the 32 Scottish local authorities, from whom we had a 50 per cent response rate. Most of the responses thanked us and said that the handbook was helpful. They felt that it explained many things that they either did not understand or that they had no guidance on. The response rate for the whole UK was 15 per cent.The issue is not one of full planning, although I echo my colleague from Orange's comments to the effect that greater public consultation is long overdue in Scotland. Full planning will, in my opinion, slow the process down. It will give more time to local planning officers who are overworked, under-resourced and overstretched, but it will not enable them to do a better job. What is needed is an education and information campaign.I sit on the telecommunications working group for England for the Department of the Environment, Transport and the Regions and the Department of Trade and Industry. We have been advocating the same process because this issue is not relevant only to Scotland, but applies to every local planning officer in the UK.There are other mechanisms that could be brought in that would be more beneficial than giving greater time to the process.
I am sure that planning authorities would accept to a degree that they are deficient in skills and expertise in areas in which they do not currently have to regulate. I am sure that it is equally true that, if they were charged with regulation of the development of the industry on a full planning basis, they would gear themselves up to do it. They would do as good a job in that field as they do in any other.I am trying to establish what it would mean for your companies and your consumers. You say that it would make things more difficult for the planning authorities, but they could live with that; many of them seem to want controls. I want to know what difference it would make to the overall delivery of the service. How would it affect your businesses? Would it disadvantage them, and would it disadvantage your consumers? You said that it would slow things down. What does that mean?
If full planning permission is required for every application that is made in one part of the UK, in order to meet coverage requirements, particularly for third-generation technology, we will concentrate on areas of the country where we can achieve the targets more quickly. I do not want to end up in a situation in Scotland where some local authorities are very good at dealing with full planning applications, but others are not. The result would be that a technological desert would appear in certain parts of Scotland and there would be a dearth of modern mobile telecommunications coverage.It is sometimes easy to forget that mobile telephony is not just an issue for the individual consumer or for businesses in Scotland, but a global industry. When businesses consider investing in a location, they want to see what infrastructure is in place there: roads, education and so on. If they see that mobile telephony in its new sense is absent, they may decide to invest away from that locality. If the Government wants to ensure that this country becomes the e-commerce centre of the world—certainly of Europe—and the home to a knowledge-driven economy, mobile telephony will have a part to play. If full planning permission is advocated in certain areas, those areas may not receive the modern telecommunications coverage that they want within the same time frame as everyone else.
Under the current regime of permitted development rights in England and the 42-day process, a majority of general permitted development order applications are considered under delegated powers; in other words, they are dealt with under the planning legislation, taking into account the technical limitations. I must echo the comments that were made this morning by my colleagues at the DTI. In my experience—and we may be able to supply evidence of this subsequently, if that would be helpful—once a full planning application is decided on, the matter moves outside the control of the planning officer, operating within the siting-and-appearance or planning policy framework, and becomes more of a local political issue. I think that we are all honest enough to acknowledge what the implications of that can be in certain circumstances. The decision can become one based less on good planning policy and guidance than on local politics.
I want to focus on a related issue, because you have answered the question that I was going to ask about the effect of varying the regime in different parts of the UK. I do not know whether this is possible, but if we in Scotland could insist on a different service obligation that took into account geographical as well as population coverage, what effect would that have on the development of the industry in Scotland?
Because our initial obligation is to provide population coverage, clearly our initial efforts are to ensure that we do that. However, having met that obligation under our current rollout programme, the focus has shifted to providing geographical coverage. We, as an operator, are now concentrating on that. In future, geographical coverage will play a part but, in the first instance, our efforts will be directed towards maximising population coverage, because of the licence obligations that we have to meet. However, geographical coverage is important, and that is evident from what Orange is now doing in Scotland.
How can we or the Westminster Parliament promote the widening of geographical coverage? What is the mechanism for that?
Vodafone and Cellnet are collectively engaged in a programme to roll out coverage in the Highlands and Islands. The programme involves a certain amount of funding from the EU, which is accompanied by an obligation to provide 90 or 95 per cent coverage of all A and B roads.
Ninety-five percentage coverage of what, sorry?
All A and B roads in the Highlands and Islands Enterprise zone. It was assumed that the population would live along those roads, and that they would therefore enjoy that coverage. I do not have a problem with that kind of definition, but I would have a problem with the definition of complete acreage coverage, which strikes me as tricky and expensive to do with not much return.The Office of Telecommunications is doing a comparative trial of four networks across the country. Such trials can be organised on a "go anywhere" basis as opposed to along prescribed routes. It is perfectly feasible to do that and measure the effectiveness of a company's coverage by specific trials. People make calls anywhere they want. We do not say to them, "Here's our coverage map. You can only use our phones here." We say to them, "Here's a phone. Go anywhere you want to with it." Every time that they fail to make a call, it clocks up against us. By that, we can measure ourselves against our competitors, and the pressure to drive the business forward is competition-driven.
On covering A and B roads, as described earlier, radio waves are not confined by anything apart from terrain. Those radio signals will travel many miles from a high point. By virtue of the way the technology works, large areas of countryside will be effectively covered.
I am slightly concerned about that answer. If your answer was hinged purely on your obligations as they stand at the moment, I can understand where you are coming from. I can appreciate that, if the obligations were changed to provide for the scenario suggested by Murray Tosh, it would be done on a geographical basis.Part of our agenda is to address issues of social inclusion. I was once a candidate in Roxburgh and Berwickshire. That area has attracted a lot of attention recently because of the dire economic problems there. The coverage was very poor when I was a candidate. The geographical argument would, in my view, stand up to scrutiny, and I would like you to comment further on how that would help us to accommodate our policy objectives for social inclusion for the areas that are in greatest need, if your obligations change.
The question is more difficult for an operator to answer. It is more a concern of central policy making. The Government's objectives will be set out in terms of how it wants the third generation of mobile telephony to be advocated and advanced. It did that in the document it published. Its priority is to ensure that, within a reasonable time frame, the population of the country is covered as speedily as possible. If you seek an obligation based on geographical coverage, it is up to colleagues in the DTI and other parts of Government to advocate that in the licences that they issue.Geographical coverage will come anyway with meeting population coverage. As I mentioned earlier, that is already happening. Having met and now greatly exceeded population coverage, we at Orange want to ensure that we try to get as much geographical area covered as is reasonably possible. We want to reach over 90 per cent geographical coverage within a reasonable time frame. How that happens depends mainly on how the licences are issued and which criteria are set within that.Your colleagues in the National Assembly for Wales have recently secured EU funding for regional development work to improve information and communications technology across the principality. That includes both mobile and fixed infrastructure. I do not believe that there is any distinction between population and geographical coverage. You could look in other directions for encouragement and investment, for example, EU funding for geographical coverage in areas such as that which Helen Eadie mentioned.
If we agreed that in Scotland full planning controls were not necessary, and instead decided to beef up the prior approval system so that local authorities had a statutory right to take action against you if you did not comply with what they laid down in the approval, would you have a problem with that?I see that you would not.
May I add to that? I do not think that it came out of the discussion earlier, but local authorities have the right to take enforcement action, so that if an operator puts in infrastructure which, in the opinion of the local authority, does not comply with the conditions or the site appearance criteria—that is, minimising the visual impact as much as possible—the local authority has the option to take enforcement action against the operator.
But you can appeal against that.
Yes, we can.
I will return to the technical question that I asked at the beginning, about the use of microcells vis-à-vis masts. As I understand it, you did not feel that you could expand the system using microcells alone. Suppose you wanted to expand in the Highlands. The easiest way to do it is by using masts, because you can put them high up so that they cover a wide area. On the other hand, that approach is most likely to raise most objections, because the masts will be visually intrusive. Is the objection to using microcells economic, or is it a technical impossibility? I am thinking along the lines of small is beautiful.
There are microcells and there are microcells. Microcells in the city cover 100 m to 200 m. If you walk along the high street and go around a corner, you cease to be covered by the microcell, so your call has to be maintained somehow. It is done by handing that call back to the big site on a rooftop somewhere, which searches round and says, "Here is a new microcell. Hand it back down there." That is how microcells work in a town.In the Highlands and Islands, for example, we have quite a lot of sites—we have had to use 200 to cover the roads—but there is not a lot of traffic there to make us build more sites for capacity reasons. However, let us assume that a popular tourist destination overloaded the nearest cell. In such a situation, we would be looking to install something that was quite small and discreet for that tourist location. In a sense, that is a different kind of microcell: it is a rural cell.
Does anyone else wish to comment?
Are you asking why we cannot have lots of microcells every 200 m along the road, as opposed to some large masts?
Yes.
To take up Roger's analogy of going around the corner and losing coverage, another factor is that microcells in city centres are for slow-moving traffic, that is, people who are walking. As a person walks between one cell and another, the signal between the phone and the base station is handed off to each cell as the phone moves along. The switch between base stations takes approximately 400 milliseconds, and when you are walking, the system has time to cope. If you took the A82 to Loch Lomond and you were driving at 50 mph, and there was a base station every 200 m, the system would probably drop you out at the third radio base station, because the system would not have had time to hand off between the stations. That is the technical argument.
For the sake of absolute clarity, I want to raise two matters. Although our planning regime deals with complex and important issues, I think that the view of the industry is that planning policy needs to be developed at a Scotland-wide level and that it should not be significantly different from UK policy. Secondly, is it a fair assessment to say that you do not believe that local authorities have any role other than as regulatory agencies?
Not all sites go down the general permitted development order route. As soon as masts are higher than 15 m, operators are obliged to apply for planning permission. The local authority has a massive role to play. For example, full planning permission is required for an area of outstanding natural beauty or special scientific interest. That is why I referred to the general permitted development order system as a short cut. Do we want to overload the planning authorities with all this work, when all that is involved is a 15 m pole like all the others? Planning authorities should be able to say, "We are happy with it there, so we can just tick the box." That is not to denigrate the role of the planning authority; we value its role in the system and want to discuss matters with it. I support the route that enables straightforward matters to go through more quickly.
I agree with the first part of what Mr Tosh said but disagree with the second part. He is right to say that the consensus in the industry is that we would like Scotland to move in line with the procedures in England and Wales. That does not lessen the role of the local authority as the arbiter of planning issues. The prior approval process requires us, as an operator, to demonstrate the need for a new development—we must show why an additional site is needed and why the benefits of mast sharing may not be relevant. We must go through a number of sequential tests in support of a permitted development application before the local authority can determine it. That is not a rubber-stamp exercise. There is public consultation and an extended period of notification, which means that, through the prior approval process, local authorities have better control over permitted development than they have had for some time. We are happy to go through those hoops to demonstrate the need for a mast. It is incorrect to suggest that the local authority's role is that of a rubber-stamp agency—it is right that local authorities should exercise control in Scotland.
Contrary to Mr Tosh's suggestion, we would encourage local authorities to play a more active role, which we believe is long overdue. If we were intransigent, we would be adopting a short-term approach. We are not here just for a year; we are going to be here in five or 10 years time, so it is incumbent on us to build a long-term relationship with each local planning authority. That is why we have been trying, since 1994-95, to encourage every local authority to meet us and have pre-application discussions. It is extremely difficult to get the time and attention of local authorities, because of their work load. I am defending the local planning offices in this scenario. We can ask them to come to a meeting, but we cannot make the meeting happen. We would encourage them to become more involved with the telecom operators.
In the notes that we submitted to the committee, we set out various issues on which a continuing dialogue between the industry and local concerns can be set in motion. That requires commitment and involvement on both sides, but we believe that it will be beneficial—it will be better for local interests, as represented by the local authority, and for the industry. It will mean that situations do not suddenly arise where a site causes problems and everybody expends time and energy trying to get what they want out of the matter. If there is continuing dialogue, the operators will, as far as they feel able to, have shared with the local authority well in advance their view of how things will develop in the area. The local authority will have garnered views from the local communities, councillors, local commerce and so on. That will enable it to have more than a vague policy on telecommunications or a few local guidelines that are capable of multiple interpretation and that depend for their interpretation on who happens to be in the chair of a sub-committee of three on a wet Wednesday night—members will see that I spent 30 years in local government. Continuing dialogue will give rise to a climate of working together in which both sides know pretty well what is acceptable to the other and what each other's objectives are. In that way, we can make progress. As our submission indicates, the telecommunications industry moves and develops very quickly. Without an awareness of the future or an ability to think laterally about national guidelines for local communities set by the Scottish Parliament, the pace of technology will overtake those authorities that are not up to speed with the implications. Everything has a cost, but if one were to start the process of general dialogue early—now, for example—one would reap the benefits in two or three years' time.
I think that we have established, convener, that the industry welcomes the development of policy at a local authority level, as long as that is done in a clearly understood climate. Some people have suggested that we should give local authorities power retrospectively to examine existing facilities. How would that affect the industry, given the confidence that you have just expressed on how the industry can work with local councils?
That is not a matter for Cellstructures, convener; at this stage, it is a matter for the usual operators. We are the new kids on the block.
In terms of existing infrastructure, and of examining it retrospectively, our licence obligations require us to provide coverage to individuals who reasonably request it. Once that service is in place, we are required to continue to provide it. It would be almost impossible for a fixed operator if that retrospective examination of the infrastructure required the infrastructure to be moved in some way—I think that we discussed that issue earlier. We have worked closely with local authorities, and with the planning and estates people in particular, on our existing locations and on how we can disguise and landscape sites to make them environmentally acceptable. We are happy to talk to people and to consider whether further improvements can be made to the sites. For the fixed operator, relocating sites would be difficult, if not impossible, to achieve.
The application of retrospective planning would be extremely damaging for the network. On what basis would one advocate retrospective planning? Whether people like the approach that is currently used is one thing, but we are doing everything in accordance with what we are required to do, in a legal and regulatory sense. Orange and the other operators have, for 18 months, advocated the introduction in Scotland of guidelines similar to those in place in England and Wales, which shows our commitment and the fact that we are willing to work with the new regime. We can work only within current legislation. It would be particularly damaging to the network as it is provided in Scotland suddenly to suggest that the legislation was totally wrong and that we had to review it, both in terms of its meaning and its application.
Retrospective legislation could have horrendous implications for the networks and the services that are provided in Scotland. For a mobile operator, each site does not stand on its own. Each site links into a network like part of a jigsaw puzzle—if one piece is taken away, several others are affected. It may be blowing our own trumpet to mention this, but we have operated a voluntary code since 1994-95. If someone tells us that we could have done better with a site that is not as good as could be expected, we will put up our hands and admit that, between 1992 and 1995, we sometimes did not get things right. I have revisited problematic sites and about 40 sites have been moved. In the past three or four years, we have not had to do that—we have been learning all the time and will continue to learn. We have already responded to voluntary requests and I welcome that approach. I have answered letters from MSPs, MPs and members of the public. We are happy to make improvements where we can, so I welcome that approach.
What are the benefits of participating in the telecommunications working group in England and Wales? Do you feel that establishing the code of good practice has been a valuable exercise, and how do you see it developing over the next two or three years?
The establishment of a code of best practice was a welcome development for the industry and for national Government and local government in England and Wales. It set out the technical background to the industry. Planning officers, especially those who have other planning issues to deal with, do not necessarily have time to understand thoroughly the details of how a network is planned and what considerations and constraints are involved. The code set out some of those criteria in layman's terms.The code set out the framework according to which operators have to deal with local authorities, how we approach them and how they expect us to approach site-specific issues. It also set out how local authorities should deal with applications, the criteria that they should consider and the information that they should ask for and receive. Overall, it has set out a valuable framework. We hope that it does not collect dust on a planning officer's desk somewhere; we hope that it is actively used and appreciated. It is currently being revised in accordance with the changes that have taken place. We would welcome a publication of such a document for Scotland, because it would give local authorities the assurances that they seek. It would also encourage overall consistency in developing the industry.
As a fixed operator, Atlantic is not party to that code. However, we have agreed a code of working practice with each local authority in Scotland. That is a matter of public record and anyone can have access to those documents.
We have mentioned the rate of technological development and the operational implications that it might have for local government and national Government. How can we maintain effective communication about the changes and about their implications for the process of regulation?
There should be on-going dialogue, but perhaps it could be arranged more informally than at a committee meeting such as this.
After our experiences in England with the telecommunications working group, we feel that on-going dialogue would be beneficial. One gets to know the individuals concerned, so that they are quite happy to pick up the phone or send an e-mail for clarification rather than wait for a formal meeting.
At the most recent meeting but one of the Scottish Advisory Committee on Telecommunications, it was suggested that a liaison group be set up between the Scottish Parliament and the telecommunications operators in Scotland. I understand that that is moving forward, although I do not know who the contact is. That is probably the best vehicle for communication in Scotland.
I draw this part of our meeting to a close. I appreciate the effort that all of our witnesses have put in. Your evidence has been interesting and informative. It may be a good idea to meet again in a less formal environment. We may have to follow up some of the issues that have been raised and take up several offers of further information. We appreciate your visit, which has been of benefit to our work this morning. Thank you very much.
In this meeting
Everything on 3 Nov 1999 →- Scottish Parliament Transport and the Environment Committee Wednesday 3 November 1999 (Morning) Committee business · 5
- Telecommunications Development Evidence session · 285
- Invitations Committee business · 5
- Scottish Utilities Forum Committee business · 23
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.