I welcome the public, the press and the witnesses to this committee meeting. We shall move on to item 2 on the agenda, which is the beginning of our inquiry into telecommunications development and the consideration of evidence from the many organisations that submitted written responses, of which there were more than 100. Using those submissions, we decided on a number of oral evidence sessions. Today, we are taking evidence from the Department of Trade and Industry and from a panel of telecommunications companies.We appreciate the effort that all the organisations have put in. We appreciate also the fact that they have managed to come before the committee at such short notice. I hope that we have a fruitful session this morning.I welcome Nick Williams, Patrick McDonald and David Lumley from the Department of Trade and Industry and I ask them to take their seats at the table. In this committee we operate on first name terms, and I hope that we will continue to do that in this morning's session.We have a number of areas that we wish to discuss with you. Time pressure is always present, so I have asked questioners to be succinct. We would appreciate it if you were focused with your answers.I invite Janis Hughes to kick off this session.
Official Report · Committee
Telecommunications Development
Speakers
Choose an MSP to read only their contributions- Andy Kerr Lab 36
- David Lumley Department of Trade and Industry 36
- Roger Wilkins Vodafone Ltd 31
- Richard Rumbelow Orange Personal Communications Services Ltd 26
- Gordon Sleigh Atlantic Telecom Group plc 21
- Linda Fabiani SNP 17
- Nora Radcliffe LD 15
- Robin Harper Green 14
- Murray Tosh Con 11
- Cathy Jamieson Lab 10
- Nick Greer Vodafone Ltd 10
- Kenny MacAskill SNP 9
- Patrick McDonald Department of Trade and Industry 9
- Nicholas Williams Department of Trade and Industry 8
- Bob Perkins Cellstructures International Ltd 8
- Des McNulty Lab 8
- Helen Eadie Lab 6
- Richard Atkins Cellstructures International Ltd 5
- Janis Hughes Lab 2
- Elaine Smith Lab 1
The record
285 contributions · showing 1–200Could you give me some information on the contribution of the telecommunications sector to the economies of Scotland and the UK as a whole?
In our memorandum, we set out some statistics for the UK as a whole. Telecoms underpins the whole economy, because the whole economy is dependent upon it. The wider impact of the telecoms industry on the economy is more important than the contribution of the telecoms sector to gross domestic product.
Looking at the future development of the sector, I know that the universal mobile technology system will be licensed next year. Could you outline some of the anticipated future development trends of the sector, what the nature and the level of the demand is likely to be, and could you also outline the technology that will be needed to meet that demand?
This year, we are seeing explosive growth in the mobile telecoms sector. With the third generation of mobile telecommunications that you referred to, we will see a range of new applications using mobile technology, such as internet on the move and video delivery to mobile terminals.We will also see wider developments, such as convergence across the various communications technologies and, indeed, convergence between fixed and mobile telecommunications. Mobile telecommunications now compete with fixed-line communications at some times of the day and for some telephone calls.
If I may briefly expand on what was said, from what I have read, it seems that the committee has a general interest in the growth of mobile telecommunications, which has led to the proliferation of masts and base stations. To give an indication of where those developments might lead in the near future, currently the penetration of mobile phones in the UK is 33 per cent. In places such as Scandinavia and Italy, the percentage penetration ranges from the high 40s to the 50s, and is still growing. We expect that, within the next couple of years, the penetration of mobile phones in the UK could be as high as 50 per cent.In terms of the type of usage, we are seeing movement away from using the phone for voice transmission to using it for data transmission. Some figures released by the industry suggest that 98 per cent of all traffic will be data by as early as 2003. Those figures underpin the explosive growth that David mentioned earlier.
Is it fair to say that third-generation mobile telecommunications technology requires a mast system with more intense emissions?
That will depend on the density of coverage of cells, as one factor.
On the technical side, it will operate at a slightly higher gigahertz frequency, so the signal will be able to travel less far. It is therefore possible that we will have more structures. Whether we have a proliferation of sites depends on whether existing sites can be used, but the network will probably have more base stations than the current network, which operates at 900 MHz.
Is the implication of what you are saying that a higher-powered system will have to be used if data as well as voice are transferred?
I am not sure that I could say that before the committee; I would need to talk to a radio frequency engineer. I would be happy to do so.
It is a question that needs to be answered.
What are the sector's current obligations under the legislation and licensing arrangements, and what obligations remain to be met?
In licences granted under the Telecommunications Act 1984, there are conditions on the coverage and/or level of service. The current obligation on the mobile operators is that they should roll out their networks to cover at least 90 per cent of the UK population. That figure has already been well exceeded. The obligation in the proposed licences for third-generation mobile services will be to roll out to cover at least 80 per cent of the population by 2007.If you wish, I can go on to talk about other obligations, but you will probably—
Could you outline them for us?
In addition to those licence obligations, all the operators clearly have to comply with health and safety legislation and consumer protection legislation. In the case of the former, operators are expected in practice to be able to demonstrate that they can comply with National Radiological Protection Board guidelines.Would you like me to talk about planning obligations?
First, have the health and safety obligations been met in every case?
I believe that to be the case, yes.
You mentioned that you had exceeded initial targets. Is that the case for all operators, or were you talking about the sector overall?
All operators have rolled out their networks to well beyond the 90 per cent level.
Do you monitor that, to ensure that they are meeting their targets?
We monitor whether they have met their obligation to hit the 90 per cent target. To go beyond that is primarily a commercial decision for the operators, although, under the Telecommunications Act 1984, the secretary of state does have a general duty to secure the provision of telecommunications services to meet a reasonable demand.
You mentioned that the next generation of mobile phones was coming. What is the likely future phasing of the licensing and obligations on the sector?
The auction of the licences will be held early next year. The information memorandum for the auction was published on 1 November.
Will the obligations under those licences be the same as for previous ones?
The coverage obligation will be 80 per cent rather than 90 per cent, to be achieved by 2007.
Will the health and safety and consumer protection obligations be the same?
The Health and Safety at Work etc Act 1974 applies anyway, regardless of what the licence says. That applies to all our obligations. I do not know whether Nick can add anything further on the timetable.
Not usefully.
Is there any responsibility for geographical coverage rather than population coverage? A huge number of areas do not have access to those services.
No, I do not think that there is. The competitive urge—"I can sell a mobile phone that will get you coverage anywhere"—will come in the long term. Currently, we do not have a geographic coverage requirement.
Do you regard 80 per cent as virtually saturation point?
No, I do not think that it is. That is a minimum requirement that we want to reach. I am sure that, as with the current generation of mobile phones, the market pressure will be to achieve as near 100 per cent coverage as possible. When people buy a mobile service they want to know that they will be able to get access to that service wherever they travel.
I pick up on the point that Cathy made. One of the complaints that I hear from businesses in more isolated areas, which do not have these services, is that it is a material disincentive to trade and industry. That must apply to all sorts of social and personal uses. How could this committee, or the Parliament, establish a regime that would insist on a fuller geographical coverage? Given the current state of technology, what would be the physical implications, on the ground, of pursuing that line of action?
I will begin by talking about the universal service obligation. At the moment that applies only to voice telephony and to fixed telecommunications links. It requires the operators, mainly in the form of BT, to provide coverage, across the whole country, of a basic voice telephony service. The Office of Telecommunications is reviewing the universal service obligation.Some of the issues that will arise in the context of that review, which is out to consultation, will concern whether the universal service obligation should be extended to broad band. There are arguments as to whether such an obligation, which is set by the Government, should follow social developments and respond to them or anticipate them. That issue is being raised in the on-going consultation process. If the committee wanted to pursue that matter, the universal service obligation might be something to consider, although it does not extend to mobile telephony.
I am aware of the penetration, according to numbers per head in Finland. Are you aware of the geographic penetration of the service that is provided in that country? If it is better than here, why is that?
I am not sure that I can answer your question on geographic coverage. In Finland, people tend to live in the south, near urban areas, and it is easy to build a network within that constraint. People often have a second home in the countryside, near the main conurbation. I suspect that geographic coverage is not 100 per cent, or even 80 per cent. If you want further information, I shall try to dig some out, but I do not know the answer.
I would be obliged if you found out the geographic penetration in Finland. That would be useful.
Do members have any other questions?
I was interested in your reply to Linda Fabiani's question about the regulatory framework. Paragraph 12 of annexe C in your submission states that compliance with NRPB guidelines is not a condition of licences that are issued by the Department of Trade and Industry. Can you explain why that is so?
It is not a condition of the licences, because it follows from health and safety legislation rather than from the licences. In its guidance, the Government expects compliance with health and safety legislation to include the operator being able to demonstrate that he has complied with NRPB guidelines.
In paragraph 13 of annexe C, in your submission, you state: "Further elaboration of how the precautionary principle in its widest context can be applied is being developed."Can you tell us who is developing that, what the content of the guidance is likely to be and when it is likely to be made publicly available?
There are three levels on which the precautionary principle is elaborated. In the UK, the precautionary principle applies interdepartmentally to all Government activity. The European Commission is also considering the most appropriate way in which to apply the precautionary principle to its legislation. Mr Prodi announced last week that the Commission is reconsidering the way in which article 130r of the Maastricht treaty is worded and applied. Globally, the application of the precautionary principle is being reviewed following the Rio declaration. The precautionary principle is an ill-defined subject that is particularly difficult for policy makers to tackle sensibly and rationally. I cannot give much information on the timetable for guidance. Discussions are being held, and I am sure that the Government will try to produce sensible guidance as soon as it can.
Thank you. I have another question. Is the thermal measure, which is used by the International Commission on Non-Ionizing Radiation Protection, linked to geographic limits on exclusion zones that surround telecommunications equipment? How, and by whom, are those limits determined? Will a reduction in the limits by a factor of five—as recommended by the House of Commons Select Committee on Science and Technology—have any impact on the geographic limits of exclusion zones that surround telecommunications equipment?
Current levels are based on well-established thermal effects of microwave radiation. The limits are based on discussion between international experts on what constitutes an acceptable level of exposure, both occupationally and to the consumer. The issue of occupational exposure is broadly agreed, and there is little debate on acceptable occupational exposure levels. That argument includes the issue of exclusion zones around base stations, which vary in extent but are usually no more than a few metres.The House of Commons Select Committee on Science and Technology has recommended that the industry adopt the ICNIRP guidelines, which include an arbitrary fivefold reduction in the limits of exposure to the general public. That reduction is generally agreed to be arbitrary. The World Health Organisation, ICNIRP and the NRPB make it quite clear that there is no scientific basis on which to apply that reduction. That is a sensible precautionary step, however, and we are discussing with the industry the potential impact of applying ICNIRP guidelines to its networks. I cannot say much more about that at this stage, as those discussions are still in progress.
When are those discussions likely to come to a conclusion?
We will almost certainly be responding on this not to the House of Commons select committee but to Sir William Stewart's independent expert advisory group on mobile phones, which will be reporting in the spring. I anticipate that a response from Government and from the industry will come sometime in the summer of next year.
You mentioned that the fivefold reduction is an arbitrary figure. Am I correct in saying that that came about as a result of guidelines from the European Community? They would presumably have taken scientific evidence before arriving at their conclusion? Has there been discussion at a European level during which guidance on this matter has been issued to member states?
No. The fivefold reduction came from the ICNIRP, which is an international body but not part of the European Community. It is a body of experts. They are quite clear that the reduction is not based on scientific evidence; it is a precautionary, arbitrary reduction.
Has the European Community in fact issued guidance on this to its member states? That is the same as the guidance to which I was referring.
Indeed, yes. The EC has issued a recommendation on the exposure limits, adopting the ICNIRP guidelines. That was done in full recognition of the fact that there is no scientific basis for doing that, but it is a precautionary step. It is also interesting to note that the EU recommendation came after very detailed consideration of whether the precautionary principle should be applied to it. With the exception of one member state, that was rejected as inappropriate.
I would like to quote from paragraph 25 of the main part of the DTI's submission. It states:"Whatever views there may be about the appropriateness of the application of the Precautionary Principle in respect of mobile communications equipment, it is clear that, because public exposure is so low, any arbitrary measure, whether in reducing exposure or in specifying a ‘safe' distance from an installation, would be extremely difficult to justify, and by reducing network availability would restrict access to mobile communications services."Is that the present position of the DTI?
It is.
I have a few more questions on current planning control measures. The DTI submission seems to suggest that making mobile phone masts and so on subject to full planning approval would slow down the rollout of the network and would cause problems compared with the current system of prior approval. How much impact would the fact that such installations must be subject to full planning control have?
It is difficult to be specific about that. If the developments were subject to full planning control, we would expect two things: first, applications would take longer and there would be less certainty among operators as to where and when they would be able to locate their masts; secondly, the issue would become more dependent on local politics. There would therefore be extra uncertainty as to what each local authority will decide. That could lead to a rather more patchy coverage of communications networks across the country.
Are you suggesting that the main issues that you are concerned about are the length of time for planning approvals to be granted and a potential lack of consistency across the board?
That is correct.
Given that people are elected to local politics to represent local people, would it be a bad thing for local people to have a say in the process?
There is perhaps a slight difference between telecoms developments and other planning issues. There is a balance of local advantages and disadvantages for a lot of planning issues. Because telecoms is a national infrastructure, the balance between local advantages and disadvantages and national advantages and disadvantages may be different.
Why should people need planning permission to build an extension to a house, while there is no necessity for planning permission if a huge telecoms mast is to be built outside someone's front door? Why should not local people have a say in those planning decisions?
It is a question of balance between the desire for a national network that is effective throughout the country and local considerations, whether environmental or concerned with health and safety.
Do you think that the introduction of full planning control is likely to result in a pattern of problematic cases?
In some parts of the country,
even under the permitted development rights, local authorities are being quite difficult about giving prior approval.
Is there a particular type of case in which that is happening?
There is no particular pattern. It depends on the characteristics of each local authority.
My final question is probably the most crucial. In your submission, you suggest that it would be unhelpful to have a variation in approach across the UK. Can you say why that is a problem? Why should not things be done differently in Scotland?
Any inconsistency in approach will entail an inconsistency in network coverage. That has a national impact and might also have an impact on the competitiveness of the local area.
I would like to follow up the point about local authorities being, as you put it, quite difficult. Planning matters do not end with local authorities, do they? If local authorities take arbitrary or perverse decisions, or even decisions that are slightly wrong, the industry has an appeals system. As appeals patterns build up, planners study appeal decisions, report on them to their committees and advise them on the likely outcome of appeals. Is not it the case that the very existence of an appeals procedure means that changes in the planning regime would bed in quite quickly as people got used to the new rules? Could not the industry suffer a few disruptions until everyone was used to the new pattern of working? Is it really such a threat, given that the appeals system acts as a control on difficult councils?
It is possible that, if we had full planning control, we would end up in a few years' time in a situation not unlike the one in which we find ourselves now. The intervening period, however, would probably be one of high uncertainty for the industry, affecting investment plans and confidence. We could lose time and fall behind other countries in developing our telecommunications network.
The other consideration that members might want to bear in mind is the Government's commitment to make the UK the best place to do business electronically by 2002. David has alluded to our concern that, if Scotland has what operators perceive as a slower procedure than is found in other parts of the country, they might develop their operations more quickly in other areas. As a result, other areas would see the benefits of this new electronic age, with the competitive advantage that it brings.That raises the question of how operators will perceive their roles in our plans if they feel that implementation might take longer in one area, which might also regulate more than another.
Planning is about getting the right time and the right place. If that means that things take a little longer, so be it.So far we have been discussing issues such as how planning will hold up rollout. However, if companies already have 90 per cent coverage, is there anything to discuss?
Although coverage is approaching 100 per cent, the increase in demand as more customers get on the network means that we have to split existing cells to allow the larger number of calls on the network. If there is slowdown, although we will maintain the almost 100 per cent coverage, calls will increasingly fail.
Although you are probably not the right people to ask, what measures are being taken by the industry to develop the technology? Can we do the same job with fewer masts?
That question is worth asking the industry. Operators' licence conditions oblige them to consider mast sharing or the sharing of apparatus before they decide to install new apparatus.
How stringently would that condition be applied?
The local authorities have the right to ask whether operators have investigated sharing, and prior approval might be refused if operators have not made reasonable efforts to do so. However, we should bear it in mind that there is a trade-off between mast sharing and the size of masts.
My question very much touches on what Nora Radcliffe was saying. As Murray Tosh pointed out, under the present system, operators can appeal if they do not get prior approval from the local authority. If an operator does not comply with the terms of the prior approval, what rights do local authorities have? Has the Department of Trade and Industry ever taken sanctions against an operator who has not met the terms of the licence?
In answer to your first question, in England and Wales, if an operator applies to a local authority for prior approval, the operator must have complied with the conditions of permitted development. If that has not happened, the local authority can refuse to give prior approval. Such conditions include protecting the amenity of buildings as far as is practicable.The local authority might also wish to comment on the siting or appearance of apparatus, even if the conditions of permitted development have been met. In such circumstances, the operators would try to accommodate the planning authority's concerns, although there might be technical reasons why they could not do so.
What if the operators felt that they could not do so?
It would be an issue for discussion between the planning authority and the operators. Those discussions often take place before prior approval is sought. If that cannot be resolved, the local authority must take the decision as to whether it refuses prior approval, and the operators must decide whether to appeal against that decision or seek an alternative site.
If the local authority says, "You have not complied with what we asked, so we are not giving you prior approval," do the operators still have the right to appeal?
I am not sure. I think that they do. Please check that with the industry.
What about sanctions from the Department of Trade and Industry if licence conditions are not met?
I am not aware that we have identified any need to do anything under licence conditions.
Do we know what percentage of masts is shared?
The figure that we have is about a third.
We should consider the regulatory framework in comparable European nations, given the penetration in the market. I mentioned Finland. What are its regulations on both planning and thermal measures? Helsinki is a comparable size to Edinburgh.
Unless Nick Williams or Patrick McDonald can help me, that is something that we will have to take away—we will give you further information if we can get it.
As we are considering international comparisons, should we not examine what is happening in Finland, the Netherlands and Germany, for example?
I can help with the application of guidelines for thermal effects. All European countries have adopted either the ICNIRP guidelines or the European Union recommendations. Some countries have the same experience as the UK, which is that some local authorities are concerned that those guidelines are not stringent enough, so they are delaying planning applications. I am not familiar with the planning side.
There are strong similarities between prior approval and full planning. Arguably, the only major differences are the number of days that the local authority has to consider the proposal and that if the authority does not respond, it goes ahead. What is the effect of having to apply for full planning approval on the slowdown of the rollout?
The main difference between the two approaches is that, under the prior approval regime, the generic issue of what the planning position might be on those developments has been considered, and guidance and codes of practice have been developed. Therefore, there is a presumption that the operators will be able to go ahead with their development if they comply with the conditions set out in the permitted development rights. With full planning approval, there is no such presumption.
The timing concerns me. You are saying that the outline for the third set of licences is out now. They are being bid for early next year, but those responsible for your own work on the impact of that arbitrary reduction on the industry are not reporting until spring and the expert committee is not reporting until spring. There seems to be a mismatch in the timing. Will you comment on that?
Although the auction for the third generation of mobile licences will be early next year, the rollout of the networks will not start immediately. That is likely to happen in 2002.
What effect will the fact that the reports are not happening until the spring have on what is required of operators?
Any decisions, including those in the report from Sir William Stewart's committee, will be available before the third-generation networks have to be rolled out. In the meantime, the information memorandum that was issued on 1 November sets out fully the current position, including the fact that the Transport and the Environment Committee is considering the position in Scotland and that there have been proposals from the Scottish Executive. The industry knows what the state of play is and can make a judgment about the level of certainty.
I have a question about the telecommunications code. What is the process for and purpose of granting the code powers? In what circumstances do you envisage that such powers would not be granted? The enforcement functions of the director general of telecommunications apply to the conditions and licences related to the application of the code. What are the strategic issues?
The Secretary of State for Trade and Industry issues licences under the Telecommunications Act 1984, which are enforced by the director general of telecommunications. The decision on code powers depends on a judgment that the person applying for the licence will develop a network that is in the public interest, or something to that effect—I cannot remember the precise wording. It depends also on the secretary of state judging that the granting of code powers is necessary to enable that network to be developed.
Why would powers not be granted? Why would it be considered unnecessary to have the powers? Can you give an example of a time when that has occurred in the past?
No, but I can give a theoretical example. Many networks are add-ons—for example, they interconnect with a BT switch and ride over infrastructure that is operated by someone else. There is a plethora of network operators, but many of them house only technology that interconnects with a network. We would provide code powers only to someone, such as cable and mobile operators, who was rolling out the hard infrastructure to which many others would connect their much smaller switch networks.
Are there any other questions?
Are masts the only way in which to provide the technology?
Masts are only one part of it. Base stations or antennae can be placed on existing structures. There are ground-based masts, which understandably cause significant planning issues, but much of the coverage, particularly in major city areas, will be provided by antennae attached to the sides of buildings. A ground-based mast, one would hope, is a solution of last resort. We expect operators to attach antennae to existing structures, as that is what is economically best. We understand that 65 per cent of antennae are attached to existing masts or buildings.
I do not know whether the committee is aware of this, but Sir William Stewart is holding a public meeting in Edinburgh next Thursday.
I have made the committee aware of that.
Could mobile phone transmissions be done via satellite, as opposed to via masts?
There are a number of problems with satellite infrastructure. The telephone handset would have to be more powerful, because the switch would be further away. With geostationary satellites, the time delay means that real-time applications such as video would not be possible. Satellites are not a complete solution.
I thank you all for coming.We will have a short break, during which time the representatives from the telecommunications companies can come to the table.
Meeting suspended.
On resuming—
I welcome the witnesses from the industry who have joined us. They are Bob Perkins and Richard Atkins from Cellstructures; Gordon Sleigh from Atlantic Telecom; Roger Wilkins from Vodaphone; and Richard Rumbelow from Orange. We are aware of the importance of the industry from your submissions and those of other organisations. We appreciate your willingness to come here today, and we appreciate your written submissions of evidence.Members of the committee will ask you questions. Perhaps you could indicate to one another who will answer each question—if anyone wants to make supplementary points, by all means do so. I hope that that is a suitable way of carrying out business.
I will kick off with a general question. How is the siting, appearance and size of telecommunications equipment likely to be affected by demand and technological development?
I am sure that almost everyone will want to answer that one.
As members will have seen from our memorandum, we are an independent network provider rather than an operator. As well as being about public service, our perspective is about using leading-edge technology to achieve the delicate balancing act that is necessary in public life between the regulatory process and the need to generate income and wealth for, in this case, the Scottish nation, and, in the case of local authorities, the local environment. We—particularly Richard Atkins, our technical director—spend a lot of time researching how we can use the newest technology to reduce the environmental impact and introduce new and better-quality services. As our colleagues from the DTI indicated, the industry is concerned not about coverage, but about capacity. More and more people are using mobile telecommunications—there are more and more applications for this technology—and the existing coverage cannot cope with the demand. Some of the demand is industry developed and some of it is local need developed; in Scotland, almost uniquely in the British context, sparsity is a factor. We, as providers of infrastructure, will look wherever possible to introduce the newest technology and the newest techniques both to develop the network and to reduce the impact that it will have on the environment and on health and safety. That is the best global answer that I can give you at the moment.
The good news is that more and more people are buying mobile phones. As the DTI representatives said, we have to build more sites to accommodate the additional customers. One of our typical base stations will handle 120 simultaneous calls. It does not take much mathematics to understand that, as the number of customers increases, more sites are needed.The good news is that, every time a site is added, it covers a smaller patch. Ultimately, we will be able to have sites that cover 100 or 200 sq m—they will be discreet and low powered, because they will not extend over a large area. At the end of this, there is a good story—this is not about more and more big things, it is about more and more small things.
I understand that, instead of using masts, you can disguise your equipment as things such as lamp posts and burglar alarms.
Lamp posts, chimney pots—
I am in something of a unique position. Atlantic is not a mobile operator, but it uses radio technology to deliver services.On your specific point, we would rather not use masts at all; we much prefer to locate our infrastructure on buildings. In all the major cities in Scotland, we have agreements with the local authorities, and for about 90 per cent of the network we have utilised existing local authority buildings or buildings rented from private landlords. Where we have to use masts, because of the nature of our technology—which is very low powered—the masts have to be located relatively close to the area that we propose to serve. However, there is good news on that as well, as the technology that we operate is moving forward. At the moment, we are running tests on the next generation of technology, which will allow us to remove some of the existing infrastructure and replace it with new technology. In future we expect any masts or structures of that nature to be much smaller than those that we currently use.
Does that mean that in a dense provision area you might be able to remove masts entirely and rely on the smaller pieces of equipment?
No, the masts would still be required. If no existing buildings are suitable as locations for the infrastructure, the ultimate solution would be to erect a mast. However, we would first check whether an operator, such as Vodafone or Orange, was already active in the area, and try to share existing infrastructure. We do that throughout Scotland.
Technical innovation will allow different mast designs to be brought forward. The industry in the UK is committed to pursuing that, as has been amply demonstrated by the steps that it has taken to disguise structures as flagpoles, trees and other forms of urban environment. The process of innovation will continue. From a network-operator point of view, in both the current generation of services and in the future generation that the DTI outlined earlier, there is a progression towards smaller-designed masts, which are more appropriate to different types of landscape and different types of urban situation.
I would like to follow on from the question about whether we take masts down. The implication appears to be that we do not, but in fact we do. I will illustrate that. There is a large mast at Winter hill outside Manchester—next to it was one of the first masts that we had in the area. Its coverage extends for miles—wonderful stuff. However, you can imagine that when the 120th conversation was going on, we needed more coverage. Eventually, there were a lot of smaller sites surrounding the original one, which we then took out of service. Our policy is to take the high masts out of service.
Are environmental considerations high up on your planning agenda?
All the operators recognise the increasing number of environmental concerns. There are, therefore, certain processes that we at Orange will undertake. Our first preference is to look for existing structures—whether masts or buildings—at which to locate base stations. If that is not possible, we must look for alternatives, such as ground-based stations that are well disguised or designed to blend in with the environment. We are committed to the use of existing masts and structures.We are also committed to technical innovation, particularly in relation to microcell technology using small lamp post designs and other street furniture. That shows a clear commitment to the environmental objectives to which we all aspire.
Members might be aware that Vodaphone has produced an environmental handbook, which has been sent to all local authorities and which is readily available to any one. That handbook determines how we work.We also have an extensive programme of building sites in the Highlands and Islands. That is clearly an environmental issue, more so than elsewhere, but the masts are part of our way of life.
I am a bit concerned about all the hidden masts that are sprouting up all over the country. Who knows where they are? Is there any requirement to have some form of labelling on a site where there is a hidden mast?
I would like to answer that question on behalf of Atlantic. We have very few masts, but in every location at which we have one, we identify it as belonging to Atlantic, although we are not required to do so.
There are two answers to that question. The first answer is from Orange's perspective—we clearly identify all the sites that we operate and include on them contact numbers and addresses if people wish to contact us about those sites. Secondly and more generally, local authorities are encouraged to keep a register of all forms of mast structure. This year, an industry initiative was announced—in conjunction with the company that operates the BBC's infrastructure—to start a national sites database. That will be updated monthly; local authorities will be able to examine and assess it. That database provides all the information about our network infrastructure, including location descriptions, size of mast and so on. That is a way forward that demonstrates our commitment to look for alternative sites to use existing masts and to ensure that people can, through their local councils, see where masts are located.
There is no obligation, though.
The mast register is a voluntary commitment made by the industry this year. The only statutory obligation is for local authorities to keep a mast register of all radio communications sites in their jurisdiction.
The only other place where such information is held is at the Radiocommunications Agency. That agency holds records on every radio transmitter in the country.
So, there is there no obligation on anyone to ensure that folk living near or around a mast are told that there is equipment there.
I would like to look at the regulatory framework and the obligations in it. How far have companies progressed in meeting existing licensing obligations, particularly in terms of coverage? What obligations remain to be met and what is the coverage in Scotland?
Orange has met its initial target of 90 per cent population coverage across the United Kingdom. We were to achieve that target by the end of this year—5 years after the start of our operation. Now that we have met that target, our next commitment is to ensure that we meet all reasonable demands for our services across the country. We have to maximise our population coverage and ensure that our geographic coverage is as good as it can be. Our United Kingdom population coverage is currently just over 98 per cent. Our geographic coverage is between 80 per cent and 85 per cent. Those figures reflect the coverage across Scotland as well.
Vodafone is probably broadly in line with that. I will get the precise numbers if the committee needs them.
Our licence is different from those of mobile operators. As a fixed-line operator, my company has no specific coverage obligation in its licence. We are required to provide coverage for anyone in our licensed area who makes a reasonable request for it, but we have no specific figures to meet. We are probably about three quarters of the way through building our networks in Scotland. We expect that they will be pretty much fully completed by the end of this year.
What is the proposed coverage?
Our networks are primarily city based, covering Glasgow, greater Glasgow, Edinburgh and parts of the Lothians, Dundee and Aberdeen.
Do you have any particular problems in meeting your targets?
We have certainly experienced a slow-down in the past six to nine months. As you heard from the DTI, some local authorities would, for different reasons, effectively ban telecommunications infrastructure. To give you a good example, we have been in discussions with North Lanarkshire Council for well over a year. We thought that we had secured access to 14 or 15 rooftops to locate equipment. After we have gone through various stages, access has been delayed and delayed. Unless there is a change in the attitude of the council, the only effective way in which we will be able to complete our network will be to build some tower infrastructure. That is the last thing that we want to do. We would far rather come to an agreement with the local authority and put our infrastructure on to suitable rooftops. All that has slowed us up in the past year. We now have an alternative plan to build towers, but we are still in discussion with the local authority and we hope that we can resolve matters.
Are the objections to those rooftop installations visual or on health grounds?
We have been given no specific reason. Our understanding is that the objections are related to health and safety.
Bob Perkins and Richard Atkins of Cellstructures, do you want to comment at this stage?
No—we are not licensed operators.
Part of what I am going to ask has already been covered, but it might be helpful if you could run through the different operational and sight requirements for fixed-line and mobile systems and for systems operating at different frequency and power levels. Will you also discuss the technical limitations on the development of networks, and the constraints of current and developing systems and technology?
Who wants to kick off?
Can we have the idiot's guide please? Laughter.
Because we are dealing with a terrestrial radio-based network service, we are confined to the way in which radio signals propagate—in other words, how far and wide they can be broadcast from a central point. In that respect, Orange is no different from any other radio broadcast operator. We have a slightly higher radio frequency than that of, for example, Vodafone. That gives us an additional technical requirement because our signals do not travel as far from a central point as Vodafone's would from the same point. The higher you go in radio frequency, the less distance the signals will travel.In planning a network, we have to ensure that we use the minimum possible number of base stations. To do that, we try to find the optimum site that provides us with the geographic or population coverage for the area that we want to cover. Then there are other factors to take into account, such as natural and man-made topography features that will influence the distance that radio signals will travel.For example, in the fenland of England, which is relatively flat, the distance that the radio signal will travel is proportionally greater than in a hilly area of the Highlands of Scotland. We have to bear in mind the various features, man-made and natural, that will affect the radio signal. We are not just rolling out the network to new areas; we are trying to provide additional capacity in areas where the network is already present. We have to re-engineer the network to provide the optimum coverage in those areas. In improving coverage, we have to deal with radio signals, which do not like too many natural or man-made features, and with a high radio frequency specification, which will impose additional constraints. We also want to ensure that we use the minimum number of base stations in planning the network—we aim for the optimum location of those stations to achieve that.
Thank you, Richard, for that full answer. Do you want to add anything to that, Roger?
I think that that is a pretty good answer. I would like to add a point that is sometimes missed about the operation of base stations. One cannot simply shove more and more power into a base station to make the signal go further, because what counts is the signal coming from the phone back to the base station. The operational range of a cell site is governed by how far the signal from the hand-held phone goes rather than by how far the signal from the base station goes. There is a sensible limit to the amount of power that we would put into a base station to make it balance with the mobile phone signal coming the other way.
How far is that? It is quite short—hundreds of metres—is it not?
No. As has been said, it depends on the landscape. In the middle of the city, it is a few hundred metres; in open country, it could be 30 km. It depends on the obstacles that are in the way.
As I said, our technology is totally different from the mobile phone technology and operates at a very low power level. Atlantic operates in a frequency band at 2.4 GHz, which is much higher than the frequency that mobile phone operators use. The band in which we operate is the ISM band—the industrial, scientific and medical band. We do not have unique spectrum, as mobile operators have. We have to share the band with other users. Other types of application in that band include industrial lasers and medical laser scalpels. The most prominent use in the ISM band is probably a device called a radio LAN—local area network. Those devices are designed to work within buildings to connect one computer to another by radio without the use of wires. The guidelines that apply to them are, as one might imagine, very stringent, because they operate in buildings where people are working. That is the type of technology that we use in an outdoor environment, so our base stations are limited to a maximum power output of 100 mW, which is a 10th of a watt. A mainstream broadcast station typically operates at something like 500,000 W. That gives an idea of how low our power level of a 10th of a watt is—the power level that we use is so insignificant as to be almost unmeasurable. Our network is a city-based network that operates to a 1 km radius cell. Because of the low power levels that we use, it is a very small radius indeed.
Can you explain the planning principles on which networks are developed? How do you see them changing as technology and demand increase?
When one begins a network, one's objective is to cover large areas with the least possible number of sites. If there are investment problems, one's instinct is usually to go to the highest points or to existing structures such as Independent Television Authority or BBC masts or high buildings. Winter hill, which I mentioned, is typical of that and covers a big area. One would aim to create an impressive coverage map so that one can sell the service and get customers. As customers are taken on, capacity has to be added. As in the case of Winter hill, more and more smaller sites have to be added to provide local capacity. A provider begins with a small number of high sites and migrates to a large number of small sites.
What sort of process do you use for network configuration? How much do you involve planning authorities in the early stages?
Atlantic Telecom involved the planning authorities even before we got to the planning stage of our networks. We have developed a good relationship with the officials of the local authorities.When setting up a city-based network, we try to factor in the capacity from day one, so that we do not have to add infrastructure later. The design that we put forward to the planners at first is the design that we hope to end up with.Each time that we request approval to site a base station, we give the planning authority the same information as we would if we were making a full planning application, which, in many cases, we are doing. The authority will make comments based on that information and we will try to take its points on board. We work very closely with planning authorities in Scotland, as, I am sure, the mobile companies have done.
Orange uses various computer models to work out our coverage needs in a local council area. Although there is no requirement to make any prior notification to councils about plans in their areas, we follow the code of best practice from England and Wales. That code sets out commitments for local authorities and network operators with regard to information, prior consultation on applications and negotiations about specific sites. We want to ensure that local councils are as well informed as possible about our plans for their area, so that they can properly consider them.
How possible is it to be flexible in terms of the criteria that you use? Are the impediments primarily financial or technological?
I go along with what Richard just said. A policy of prior notification, which exists in England and Wales, could be adopted in Scotland. When a planning application is received by a local authority, it does not come as a surprise; it probably arrives with a nod from the planning officer. There will have been discussions and the plans will have been agreed to. The paper submission is just a formality. The degree of flexibility depends on the circumstances. Everybody has to understand what everybody else wants.
There is another aspect to the matter. Cellstructures is working with a number of local authorities in England in an attempt to reach global agreements with them. We have done so with many local authorities already. Some of our business arises from providing for the network operators' needs, but we also believe that it is possible to work with a local authority to assess its needs and find the best way of meeting those needs, given the local criteria. We try to carry out a balancing act between public protection responsibilities and the need of every local authority to generate income, in this case from public buildings and public open space. We are developing expertise on that and are rolling out a number of seminars for chief executives of local authorities, at which we can explain their potential. We believe that that will be beneficial to the industry and to the local authorities.As the committee knows, local authorities in Scotland have expressed some fears and, as a result, progress is fairly slow. We will be back in Edinburgh towards the end of this month for the Convention of Scottish Local Authorities seminar, in an attempt to address the local authorities' perceptions, but that will be a slow process. Mr MacAskill's overall question can be approached in two ways. Our approach is not simply to try to provide the sites that the operators require at a particular time, but to encourage local authorities to plan their whole area in the longer term. The situation will change over time and, if only the current climate is taken into consideration, the result might be a piecemeal development, which might not be in anyone's interests. We try to take a balanced approach.
I got the impression that you perceived a difference between Scotland and the rest of the United Kingdom. Is that correct?
There is a more heightened perception in Scotland at the moment, in particular on the public health aspect.
Is that having an effect on development?
Colleagues have already said that it is affecting the rollout of certain networks. With certain local authorities, we have been involved in fairly advanced discussions that have now come to a complete halt until such time as the local authorities, collectively, feel that their questions have been answered reasonably. We hope that we will be able to make some progress towards that end at the end of this month, when COSLA convenes its seminar.
I have had some experience of mobile phone masts being erected in the area that I represented, where a variety of possible sites existed on which the masts could—technically—have been erected. In effect, it was easier—financially and in terms of planning—to place the mast nearer to housing than on available alternative land. On such decisions, do the companies perform a cost-benefit analysis that includes public amenity consideration? From a purely business point of view, there might be an argument for putting the structure in the cheapest place where land is most easily available. Do you go through a process of considering alternatives and balancing other considerations against those of cost and ease of erection?
In planning coverage of a specific area, our first step is to find out whether any existing mast or structure is available to share. Our negotiations on sharing the site might take many a course—with the owner of the mast, the owner of the land where the mast is located, and the local authority. Those three elements are dealt with first. The existing operator might well find our approach acceptable, but the landowner might not. The local authority might consider that some issues connected with sharing the site—such as increasing the height or overall size of the structure—are not acceptable in planning terms. Any one of those three elements could easily fall out of the equation and, if that happens, one is left with little option but to look for a ground-based structure of one's own from which to provide the coverage.Overall, our first commitment is to look for an existing structure or mast, but if that falls through for any reason, we have to look for an alternative solution, which will often be our own ground-based installation. The priority is to look for site sharing first.
Presumably, everything in your business comes down to a cost-benefit analysis to some extent, as that is how business operates. I am interested in whether the easiest and cheapest solution always applies. To what extent are you prepared to examine environmental and social considerations and to adopt a more expensive solution rather than a cheaper one?
From Atlantic's perspective, we adopt pretty much the same criteria as those described by Richard Rumbelow. We always look first of all for an existing piece of infrastructure—a building or a tower. If there is nothing suitable, we are restricted because our technology operates at such a low power level that we have to be in fairly close proximity to the area that we want to serve. Industrial estates would be the next type of area that we would consider. If we have to build, our first choice would be to build there. Absolutely the last choice would be to locate infrastructure close to a residential area. We have two or perhaps three examples of that in the whole of Scotland—that is it. When it comes down to the cost-benefit analysis of such a mast, we do not consider it on a purely economic basis. We examine the site and we landscape it, to try to disguise the mast as much as possible so that it blends in with the landscape. I assure members that that is an expensive business. For example, we are transplanting trees on one site at the moment—we are planting a ring of mature trees round a mast.
Is it possible for the companies to provide us with some examples of where such work has been done and an indication of the costs? It would be helpful for the committee to understand the criteria on which such judgments are made and what the implications are, as opposed to—
I can give you details of the example that I talked about straight away. That site is in the north of Aberdeen, on a farm at the edge of a residential area. We made an agreement with the landlord who owns the site and the tenant farmer, from whom we secured the rights. Then we consulted the local estates department on how best to landscape the site. We submitted drawings to the estates department on three separate occasions and took on board its comments about what it thought the site should look like. I believe that the final design is now going ahead. The cost to us, for landscaping, will be between £15,000 and £20,000.
It is not true that cost is a massively significant feature of a site. We will pay what it costs to get a site to do what we want. If we have to take extraordinary steps to achieve something that is environmentally superb, that is what we have to do. The cost of renting the site does not represent much of its total cost to us. The choice of whether we go with this landlord or that landlord is down to which landlord is the most willing and not which is the cheapest.
From our perspective, as an infrastructure provider, site development is our core business. We will not go near any establishment or building. For example, given the public perception of masts, our policy is to keep well away from educational establishments such as schools and from hospitals. As far as possible, we go out of our way to attempt to develop sites in the most physically acceptable locations. We are developing a product that is saleable to the industry, if you like. We are looking at higher capital investment on a site to achieve minimal visual impact, by disguising masts and so on.
Given what you said, one of the points that the committee might want to consider is a best practice code that highlights examples of good practice. Do you think that the industry will be willing to contribute its expertise to that process?
I mentioned the environmental handbook that we produce, which gives guidance to staff in the company and to planners and potential landlords on what we are happy to do. I am supportive of such a process.
Richard, can you sustain a network based on the philosophy and principles that you have just spoken about?
It is partially possible. Our colleagues in the Department of Trade and Industry pointed to a number of relevant sites. I would turn round and say that some situations demand that the operators have their own infrastructure. However, there is more mileage in existing developments and in third-generation developments. The number of pieces of infrastructure will certainly rise, but we hope to offer a solution that will, to a certain extent, put a limit on proliferation. However, the operators will justifiably make a case that, under certain circumstances, they need a particular piece of infrastructure to provide a capacity coverage solution in an area. Given their network planning constraints, it might not be possible to use shared infrastructure.
You mentioned hospitals and schools as an example of where you are listening. We can argue to and fro on the environmental and health impacts, but are you listening to what the public are saying? Do you have a perspective on high-rise flats, which are popular sites? The residents of those buildings are also concerned.
We are not involved in negotiating on any form of residential property at the moment, within our operational portfolio.With regard to the health and safety arguments, there is nothing conclusive on the effects of radio communications on health. Unfortunately, there is a certain amount of popular misconception and, as a business, we have to be swayed by that.
We will continue to focus on site selection and will deal with health in a moment.
There is much encouragement to share sites. Is it easier to share if you are at different bands? What percentage of your sites is shared?
When it comes to sharing a structure, several issues must be taken into account. First, is the mast structure in a location where we are trying to provide new coverage or capacity? Secondly, is the structure currently suitable for the attachment of additional equipment? Thirdly, is the landlord willing to have an additional operator on his land? Lastly, is the section of the local authority that deals with town and country planning willing to have the site changed in some way?Those are the four principal issues that we take into account when investigating a site share. However, the height or shape of structures that we would erect would have to be changed to accommodate other operators' equipment. Very few changes are made to substantial structures more than 100 m high, such as radio and television broadcasting installations.
But technically?
That is not an issue, as operators place their own equipment on the structures.
Do the installations interfere with each other?
There has to be some space between antennae, because there is a risk.
What proportion of installations is shared?
From Atlantic's point of view—
We will not hold you to these figures; we know that they are just approximate.
No, the figures are exact. Of 125 operational base stations in Scotland, Atlantic has 16 towers, of which seven are shared.
My colleague has advised me that 30 per cent of Vodafone's installations are shared.
Similarly, 30 per cent of Orange's installations are shared.
What regulations are there for operators in comparable European Union nations, such as Finland or the Netherlands?
Vodafone has a number of European interests. Vastly different planning regimes are in operation across Europe, but I do not know the details. For example, the Netherlands regime will be different from the Greek regime.
I meant more social democratic, northern European countries.
Orange has limited experience of overseas operations. We have only recently begun to operate networks in Belgium, Switzerland and Austria. I would be more than happy to supply more detailed information on planning matters. The town and country planning procedures are vastly different among those three countries. Where Belgium is relatively relaxed, Switzerland is very regulated as regards planning issues.
I want to establish a baseline of understanding. Do you acknowledge current advice that mobile phone masts do not affect health?
Vodafone is comfortable with the outcome of the report on the issue by the House of Commons Science and Technology Select Committee.
The Science and Technology Committee report gave a balanced and objective view. Its recommendations were fair. The industry supports the notion that further research needs to be done and that it can play a responsible part in that process, by independently funding research or by providing mechanisms for research to happen.
Again, because of the power levels on which we operate, I have to differentiate my company from the mobile phone operators. We are comfortable with our technology. Our power levels fall within all known guidelines and well below the prudent avoidance levels as advocated by such organisations as Friends of the Earth, which has investigated levels across Europe, Australia and New Zealand.
In this meeting
Everything on 3 Nov 1999 →- Scottish Parliament Transport and the Environment Committee Wednesday 3 November 1999 (Morning) Committee business · 5
- Telecommunications Development Evidence session · 285
- Invitations Committee business · 5
- Scottish Utilities Forum Committee business · 23
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.