So that would have been even more millions in the system.
Official Report · Committee
Scottish Variable Rate Inquiry
Speakers
Choose an MSP to read only their contributions- John Swinney SNP 69
- Jeremy Purvis LD 43
- Andrew Welsh SNP 31
- Tom McCabe Lab 25
- David Whitton Lab 23
- Jack McConnell Lab 22
- Andy Kerr Lab 22
- Linda Fabiani SNP 20
- Derek Brownlee Con 12
- Joe FitzPatrick SNP 7
- Malcolm Chisholm Lab 3
The record
277 contributions · showing 201–277
link
There would have been a cost to that, yes.
Was that one of the reasons why you were not prepared to commit to spending on the SVR system?
link
No. The two issues were not in any way related.
Okey-doke.
You are stuck.
Not at all. I have hundreds of questions here. I could go on all day if I wanted to, but I dare say that the convener would not let me.
We are not that much at your mercy.
I do not have many more questions. There were a number of occasions between 2007 and when you were, let us say, brought to book by the Parliament on which you had the opportunity to say that the single variable rate was not operable and that discussions with HMRC were on-going. For example, there was an occasion in May 2010, at the Equal Opportunities Committee, in response to a question from my colleague Marlyn Glen. I remember well another occasion, in September, in response to a question from my colleague Lord Foulkes. Why did you not take any of those opportunities to say that the single variable rate system was not operable?
link
The first thing that I should say is that I clearly made a mistake in not communicating that to the Parliament. I have accepted that unreservedly. I cannot unravel that particular mistake. I should have communicated that information to the Parliament. I heard one of my predecessors—Mr Kerr, or perhaps Mr McCabe—helpfully suggest that I should have used an inspired PQ. They are right. That is one action that I got wrong.
Do you accept, then, that the person with the woeful record in this is your good self?
link
I made a mistake, Mr Whitton. I have put my hands up to that and I have accepted it in front of my colleagues in the Parliament, which is where I should do it. On the substance of the matter, I believe firmly that I have taken the correct decisions to remedy a problem that I inherited. I did not inherit a functioning IT system. All the documentation that has been published demonstrates that to be the case and my officials worked to try to restore the position. With regard to the substance of the issue, I have, in my view, taken all the correct decisions; my mistake was in not communicating them to the Parliament.15:30
I might take issue with that comment. Your mistake was not that you did not communicate your decision to the Parliament, but that you did not let the Parliament take the decision along with you. I do not think that the decision was yours to take as minister; it is a decision of the Scottish Parliament and a decision taken by the Scottish people in a referendum.
link
This is where we have to be careful about our terminology. The decision that I took was about restoring a system that I inherited and which could not work. That is the problem and the nub of the issue.
But it could work if you were prepared to put the investment in.
link
There is my point—
—and you have just said that you were not prepared to do so.
This is becoming a conversation. Please let the cabinet secretary finish his response, Mr Whitton.
link
The point that I am making, convener, is that when I came to office, I did not expect to get news that I would have to make significant capital investment to make the SVR system operable. I did not inherit a functioning IT system. My decision was not to stop the power, but to start it and ensure that it could be exercised in future. That is the issue of substance and why I took the decisions that I did.
On reflection, do you think that you overstated your criticism of your predecessors? In the earlier evidence session, which you might have seen, David Whitton read out a civil servant’s note indicating that no advice had been put to ministers and no reply sought on the £3.4 million option. Is it not a bit unfair to blame your predecessor ministers for what you inherited?
link
I inherited a system that could not function without further capital investment. What I have said on that matter is crystal clear. The thing for which I am being criticised, and which the secretary of state decided merited his intervention in the debate with such grace, is not having a system that could be operable 10 months after an election. That is precisely the position in which I found myself in 2007.
The committee will obviously have to come to a view on whether you should be criticised for that. Are you still levelling criticism at your predecessors for what you inherited or is it, as the evidence suggests, that it was a fairly recent intervention from HMRC that indicated that extra investment was required, that that was still being discussed between HMRC and officials, and that that had not been put by Scottish Government officials to the minister at the time?
link
My predecessors, who addressed the committee before me, said that they felt that they were taking actions to maintain the system’s operability. When I came to office, I did not inherit an operable system. I do not think that there is any doubt that that is at the heart of the issue and that that is crystal clear from the information that is now in the public domain. I did not inherit a system that was operable and the circumstances that gave rise to that situation happened when I was not a minister.
We will finish with two short questions from Jeremy Purvis and Linda Fabiani.
Coming right up to 2010, I was interested in an e-mail from Sandra Stewart on 3 August 2010 providing an update on the SVR and giving a brief background on the position. The second bullet point in the section headed “Brief background” says:“We had proposed (at one time officially!) to question why the SG should be asked to fund further costs since we had already paid £12m. However the fact that Ministers decided not to implement the SVR until May 2011 it was agreed that we shouldn’t pursue this point.”Is that correct?
link
The point that I raised in my answer to Mr Brownlee was that in August 2009 Sandra Stewart questioned that point entirely.
I beg your pardon?
link
In Sandra Stewart’s e-mail of 7 August 2009, she questioned the point about what liability, if any, there should be to meet any of those costs.
So it is correct that a letter was proposed and your permission was sought to ask for more information from the Treasury, and that you did not give permission for that letter to be sent.
link
The letter that is referred to, if it is the letter that I think it is, is the draft letter that Alyson Stafford put to me. I do not actually see—
Can we get a reference?
It is in the papers.
link
It would be the letter to which I referred earlier in my evidence to Mr Purvis, which it was proposed to send to HMRC. I advised officials to continue the dialogue with HMRC to try to make some progress on the question.
Instead of sending a formal letter.
link
Yes.
The next bullet point relates to the deadline for committing. It states:“It appears that it will cost £7m (only an estimate which could change depending on the risks/assumptions made by HMRC) to fund the IT infrastructure to deliver the SVR for 6 April 2012. HMRC need a reply by 20/8 if we are to commit to this.”When were you first aware of the date that HMRC had set as a deadline if the power was to be available for use by an incoming Government after the 2011 election?
link
My recollection is that Alistair Brown discussed that with me on—I think, if I have my dates right—either 4 or 5 August.
What was your response to that?
link
My response was that we should find out some more information, because I was not committing to £7 million without more detail about how it had suddenly become £7 million.
But you were fully aware at the beginning of August that HMRC needed a reply by 20 August and that Scottish Government officials had known for a considerably longer period that HMRC had to have sufficient time for that before the elections in May 2011. You were fully aware of the consequence if that deadline was not met. Is that correct?
link
The first time the figure of £7 million was mentioned was, I think, on 28 July. The e-mail is from 3 August and Alistair Brown raised the matter with me on 5 August.
Did you not consider it to be an issue on which you may have wished to speak to other ministers in a UK department? Or were you perfectly content that it would be handled by officials?
link
A range of issues are handled by officials. Sometimes, ministers will delegate particular issues and, in other examples, ministers will be involved in all the discussions. It varies from issue to issue depending on the questions that are involved.
If the Parliament voted to utilise the tax-varying power, when is the earliest availability for it to be implemented?
link
The earliest availability will be in 2013-14.
And is there a time by which a decision would have to be made for it to be implemented at that stage?
link
The committee has had released to it the notes of teleconferences that took place on 2 and 9 December on taking forward some of those questions. I am sure that there will be further work to ensure the operability of the system. As part of that discussion, we have pressed for clarity at the earliest possible opportunity. The Parliament must obviously consider whether that work should be undertaken if it results in a cost, given the UK Government’s proposals to abolish the Scottish variable rate as part of the Scotland Bill.
But it would be impossible to get the power back to a 10-month state of readiness by May 2011.
link
That is my view, based on the information available to me.
And the last discussions relevant to the—
link
On that point, the position that I inherited and the advice that was given to me in May 2007 meant that the reliable date for the operability of the SVR system would have been 2009-10, which was two years after the Government was elected.
The briefing that you had in 2007 went into detail in two paragraphs about an April 2008 start. Mr Whitton was discussing that.
These are very specific questions. I suggest that, if the minister wants to add anything further in writing—
link
No, I have nothing to add.
I am asking because paragraph 15 of the note from the teleconference on 2 December says,“A further meeting would be held once HMRC had considered the implications of the question about returning the SVR systems to a 10-month state of readiness by May 2011”,but you are ruling that out now.
link
I am saying that, on the information available to me—
What information is that?
link
I have had a further response on many of these questions from the Exchequer Secretary to the Treasury, Mr David Gauke MP, and he essentially makes that point to me. I am happy to provide the committee with a copy of that letter.
Why have we not already been provided with that?
link
I am here today and I am happy to make it available to the committee.
That would be helpful.
Convener, I thought that the Scottish Government had said that all relevant material had been provided to the committee.
link
In relation to the circumstances of the issue about which I have been asked to inquire, that is the case.
How much more information and how many more papers exist that we do not know about?
link
All the information that the Scottish Government holds about the issue has been made available.
Up to when?
link
Up to 9 December. The letter from Mr Gauke is from 21 December.
Right. Thank you.
Linda Fabiani will finish off.
I will be quick, unlike Mr Purvis. Earlier we heard Mr Purvis’s questions about the successive budgets that were introduced by the previous Labour-Lib Dem Administration and the statement about the SVR that was contained therein. He finished by talking about the budget for 2006-07. The draft budget that the coalition prepared for 2007-08 had the statement about the 10-month state of readiness of the SVR in it. Cabinet secretary, in retrospect, do you think that that was misleading?
link
It certainly was not what I inherited.
Do you know about the mothballed call centre in East Kilbride? I can tell by your face that you do not.
link
I do not know anything about a call centre in East Kilbride.
Convener, could the committee write to HMRC to find out about the current state of play in relation to that, and ask for further confirmation about who paid the £2 million in that regard? Understandably, there is a bit of confusion because some of the papers are missing.
If it helps the committee to clarify the situation, I am happy to do that. There are no further questions. Do you have any final comments?
link
I have no additional comments to make.
Thank you, minister.Meeting closed at 15:44.
In this meeting
Everything on 25 Jan 2011 →- 13:30 Decision on Taking Business in Private Procedure · 1
- 13:30 Scottish Variable Rate Inquiry Committee business · 277
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.