Question thread · 7 questions
What the latest cost estimates are for (a) upgrading the A80 from Stepps to Haggs through Cumbernauld to full motorway status and (b) constructing a motorway through the identified Kelvin Valley route to join the M80 at…
Started with S2W-21275 on 30 Nov 2005; latest 23 Mar 2006. Each later question says it follows up an earlier answer.
The thread, in order
Each answer’s opening lines; open a question for the full text-
To ask the Scottish Executive what the latest cost estimates are for (a) upgrading the A80 from Stepps to Haggs through Cumbernauld to full motorway status and (b) constructing a motorway through the identified Kelvin Valley route to join the M80 at Stepps to the M80 at Haggs.
Tavish Scott, 15 Dec 2005: The estimated total scheme cost of the on line route lies in the range £127 million to £146 million excluding VAT at 2004 quarter 1 prices. The equivalent range for a route through the Kelvin Valley is £239 to £271 million. -
Whether the estimated cost of its planned on-line upgrade of the A80 to full motorway status does not include the cost of the Auchenkilns interchange project and work on the millennium bridge over the Forth and Clyde Canal.
Tavish Scott, 20 Mar 2006: The estimated cost of themotorway upgrade does not include either the Auchenkilns Junction or the Millenium Bridge. Transport Scotland hasthe operational responsibility for this area, and can be contacted for moreinformation if required. -
Whether it will revise these figures to include an estimate of what the total cost would be to (a) upgrade the A80 to full motorway status on the on-line route by one lane more than is presently planned, as recommended by consultants in 2002, and (b) construct the motorway through the Kelvin Valley route with an extra lane.
Tavish Scott, 20 Mar 2006: No. Neither of these isbeing proposed. Transport Scotland hasthe operational responsibility for this area, and can be contacted for moreinformation if required. -
Whether its estimate of the cost of constructing the M80 through the identified Kelvin Valley route is based on a motorway with the same amount of lanes which it plans for its preferred on-line upgrade of the A80 to full motorway status.
Tavish Scott, 20 Mar 2006: Yes, except for the section of the on line upgrade between M73 and Low Wood when the M80 and the M73 merge requiringadditional lanes. Transport Scotland hasthe operational responsibility for this area, and can be contacted for more informationif required. -
Whether its estimate of the cost of constructing the M80 through the identified Kelvin Valley route takes account of the (a) good rock that would be excavated at various points on the route that could be crushed on site and utilised for hardcore and other purposes, thus saving purchase cost and aggregate tax, (b) utilisation of excavated material which could be used as filling, thereby saving on landfill transport a…
Tavish Scott, 20 Mar 2006: The Kelvin Valley Route was costed in outline for the Public Local Inquiry held in October 2005.A general allowance for these items was included in these costs, but the estimatesdid not separately identify these savings. Transport Scotland hasthe operational responsibility for this area, and can be contacted for more … -
Who made the assessment of these costs.
Tavish Scott, 20 Mar 2006: I referthe member to answer to question S2W-23923on 20 March 2006. All answers to writtenparliamentary questions are available on the Parliament’s website, the search facilityfor which can be found at http://www.scottish.parliament.uk/webapp/wa.search. Transport Scotland hasthe operational responsibility for this area… -
What the combined cost would be of the Executive’s estimated cost of its planned on-line upgrade of the A80 plus the cost of the Auchenkilns interchange project and the cost of the millennium bridge.
Tavish Scott, 19 Apr 2006: The estimated cost ofconstructing the on line route is between £127 and £146 million. The cost of the Auchenkilns Junction was £25 million. The cost of the Millennium Bridge was£2.44 million. Transport Scotland hasthe operational responsibility for this area, and can be contacted for moreinformation if required.
How this thread is put together
- Follow-up
- A question whose text says it is “further to the answer to question …” (or reply, response, or asks for a “substantive answer” to an earlier question). The question it names is its parent.
- Several citations
- When a question cites more than one earlier question, the most recent one we hold is used as the parent; the others are listed as “also cites”.
- Thread
- Follow parents back to the first question; every question that leads back to it is in this thread. Branches are shown in date order.