When the electricity grid will be upgraded and what the cost of each connection will be from (a) Dounreay to Beauly, (b) Beauly to Denny and (c) Western Isles to the National Grid in order to provide extra capacity for …

Started with S2W-04159 on 20 Nov 2003; latest 5 Jan 2004. Each later question says it follows up an earlier answer.

Follow-ups
1
longest chain 1 step
Span
46 days
20 Nov 2003 to 5 Jan 2004
Answered
2 of 2
by Lewis Macdonald
Asked by
1
Mary Scanlon

The thread, in order

Each answer’s opening lines; open a question for the full text
  1. S2W-04159 20 Nov 2003 Mary Scanlon Con Answered

    To ask the Scottish Executive when the electricity grid will be upgraded and what the cost of each connection will be from (a) Dounreay to Beauly, (b) Beauly to Denny and (c) Western Isles to the National Grid in order to provide extra capacity for increased renewable energy generation.

    Lewis Macdonald, 5 Dec 2003: While the regulation of theelectricity network is a reserved matter, the Executive is working with the UKGovernment, the regulator, and the industry to ensure that the grid isstrengthened in order to fully realise Scotland’s renewable energy potential. I understand that thetransmission companies are currently consider…
  2. S2W-05217 5 Jan 2004 Mary Scanlon Con Answered

    How much additional capacity of wind-generated electricity can be transmitted using the existing national grid structure in Scotland.

    Lewis Macdonald, 19 Jan 2004: A Renewable Energy NetworkStudy, Impact of Renewable Generation on the Electrical TransmissionNetwork in Scotland, published in 2001 found that 650 MegaWatts of newinstalled renewables capacity could be connected to the grid without the needfor additional reinforcement or extension to the Scottish network. Copies of t…

How this thread is put together

Follow-up
A question whose text says it is “further to the answer to question …” (or reply, response, or asks for a “substantive answer” to an earlier question). The question it names is its parent.
Several citations
When a question cites more than one earlier question, the most recent one we hold is used as the parent; the others are listed as “also cites”.
Thread
Follow parents back to the first question; every question that leads back to it is in this thread. Branches are shown in date order.

All question threads