Further to the answer to question S2W-4159 by Lewis Macdonald on 5 December 2003, how much additional capacity of wind-generated electricit…

Answered Asked by Mary Scanlon Con Lodged 5 Jan 2004

The question

To ask the Scottish Executive, further to the answer to question S2W-4159 by Lewis Macdonald on 5 December 2003, how much additional capacity of wind-generated electricity can be transmitted using the existing national grid structure in Scotland.

The answer

Answered by Lewis Macdonald on 19 Jan 2004 · 14 days after it was lodged, on time

A Renewable Energy NetworkStudy, Impact of Renewable Generation on the Electrical TransmissionNetwork in Scotland, published in 2001 found that 650 MegaWatts of newinstalled renewables capacity could be connected to the grid without the needfor additional reinforcement or extension to the Scottish network. Copies of the study findings are available in the Scottish Parliament Information Centre(Bib. number 20013).