What estimate the Scottish Parliamentary Corporate Body has made of the cost of car parking provision at Holyrood (a) in total, (b) by square meter and (c) per car parking space, and whether it will detail these costs f…
Started with S1W-05936 on 3 Apr 2000; latest 4 May 2000. Each later question says it follows up an earlier answer.
The thread, in order
Each answer’s opening lines; open a question for the full text-
To ask the Presiding Officer what estimate the Scottish Parliamentary Corporate Body has made of the cost of car parking provision at Holyrood (a) in total, (b) by square meter and (c) per car parking space, and whether it will detail these costs for each of the cost reports contained in paragraph 4.2 of the Spencely Report.
David Steel, 5 Apr 2000: The car park forms part of the substructure works package for the west part of the site and comprises 45% of the total west basement area. The costs for the car parking area and the building structure support cannot be separately identified. -
In respect of each of the 10 separate cost reports referred to in paragraph 4.2 of the Spencely report what was (a) the cost of the substructure element; (b) the total usable space within the substructure; (c) the proportion of this usable space allocated to car parking; (d) the total number of parking spaces to be provided within the substructure, and (e) the total parking provision within the site.
David Steel, 17 May 2000: The information requested is detailed, I will write to Ms Fabiani shortly and place a copy of the letter in the Scottish Parliament Information Centre. -
What alternative solutions were considered for the provision of car parking for the Holyrood complex and what the comparative costs of each solution were.
David Steel, 17 May 2000: The original provision of 135 car parking spaces for the Parliament building was influenced primarily by security considerations which recommended a secure space for each MSP, and also by building regulations which requires a proportionate number of spaces to be provided for the disabled, in this case six spaces. Foll… -
What alternative solutions were considered for the construction of foundations for the Holyrood complex and what the comparative costs of each solution were.
David Steel, 17 May 2000: The ground conditions on the Holyrood site together with the physical properties of the proposed Parliament building dictate the types of foundations which can be used. The Structural Engineer's professional judgement was that the most suitable and cost-effective solution for the Holyrood site was to use a combination…
How this thread is put together
- Follow-up
- A question whose text says it is “further to the answer to question …” (or reply, response, or asks for a “substantive answer” to an earlier question). The question it names is its parent.
- Several citations
- When a question cites more than one earlier question, the most recent one we hold is used as the parent; the others are listed as “also cites”.
- Thread
- Follow parents back to the first question; every question that leads back to it is in this thread. Branches are shown in date order.