Written Question · S4W-21585 · Session 4
Further to the answer to question S4W-20838 by Keith Brown on 9 May 2014, whether it will provide a breakdown of the costs associated with …
The question
To ask the Scottish Government, further to the answer to question S4W-20838 by Keith Brown on 9 May 2014, whether it will provide a breakdown of the costs associated with making the MV Argyll Flyer the lead vessel.
The answer
The MV Argyll Flyer was switched to 'lead' vessel on the Gourock-Dunoon route to improve reliability, following a formal request to Transport Scotland from local ferry users.
This switch required changes to the established rosters and shift patterns. These, along with associated increased maintenance and repair costs, increased berthing dues and increased overheads and operators return, have generated additional operating costs.
The breakdown of these costs is commercially confidential.
This switch required changes to the established rosters and shift patterns. These, along with associated increased maintenance and repair costs, increased berthing dues and increased overheads and operators return, have generated additional operating costs.
The breakdown of these costs is commercially confidential.
In the Official Report
No contribution in the Official Report cites S4W-21585 by reference.