The question

To ask the Scottish Executive on what basis the cost of the Forth Replacement Crossing was previously estimated by the Minister for Transport, Infrastructure and Climate Change to be £4 billion and on what basis this was later reduced to £2 billion.

The answer

Answered by Stewart Stevenson on 14 Jan 2009 · 34 days after it was lodged, on time

The new estimate of £1.7 billion to £2.3 billion is based on the same elements as the previous estimate of £3.2 billion to £4.2 billion.
The significant reduction in costs can be attributed to the reduced width of the bridge, made possible by utilising the existing Forth Road Bridge for public transport, cyclists and pedestrians, and the use of ITS which has enabled the extent of road construction on the bridge approaches to be reduced. More refined estimating in light of further detailed surveys, investigations and design development has also been possible at this stage.