Written Question · S2W-21853 · Session 2
Further to the answer to question S2W-21288 by Tavish Scott on 15 December 2005, what the projections are for the volume of traffic per day…
The question
To ask the Scottish Executive, further to the answer to question S2W-21288 by Tavish Scott on 15 December 2005, what the projections are for the volume of traffic per day on the A80 in (a) 2010 and (b) 2025 if the M80 was constructed through the identified Kelvin Valley Route rather than the on-line upgrade.
The answer
In 2010 the predicted residual traffic flow on the A80 between Mollinsburn and Low Wood resulting from the construction of a Kelvin Valley Route would lie in the range 40,000 to 60,000 vehicles per day. The equivalent range for the Auchenkilns to Old Inns section would be 25,000 to 45,000 vehicles per day. The range of flows reflects the eventual status of the detrunked A80 which would, in the circumstances, fall to North Lanarkshire Council.
The flows for 2025 are not available.
The flows for 2025 are not available.
In the Official Report
No contribution in the Official Report cites S2W-21853 by reference.