Absolutely.
Official Report · Committee
Section 23 Report
“Preparations for the implementation of the Scotland Act 2012”
Speakers
Choose an MSP to read only their contributions- Eleanor Emberson Revenue Scotland 70
- Hugh Henry Lab 56
- Caroline Gardner Auditor General for Scotland 53
- Mary Scanlon Con 28
- Tavish Scott LD 28
- Colin Beattie SNP 24
- Alyson Stafford Scottish Government 17
- Gil Paterson SNP 11
- Sandra White SNP 10
- Mark Taylor Audit Scotland 8
- Colin Keir SNP 8
- Nigel Don SNP 8
- Gordon Smail Audit Scotland 7
- John King Registers of Scotland 3
- Rebecca Seidel Audit Scotland 2
The record
333 contributions · showing 201–333
link
We will not get any surprises on 1 April.
I am not in control of whether there will be any surprises, but I am confident that we will have a full IT system and the operational staff required to run the organisation.
link
The summary of the Audit Scotland report contained three recommendations for Revenue Scotland and one for the Scottish Government. Have those been implemented?
Indeed. They are all things that we are doing anyway, but we recognise that they need to be done and we are doing them.
link
On contingency planning, Audit Scotland was of the opinion that, back in October, contingency plans were being developed. Are contingency plans now in place to cover key eventualities?
Yes. We now have a full contingency plan. We are finalising the details but we have a full plan.
link
So there is a back-up if there is an unforeseen problem with the IT system.
As you would expect, yes.
link
Paragraph 41 of the report refers to difficulties with recruiting operational staff. Have there been any difficulties, or is it just about timing?
On operational staff, you have to understand that we deliberately changed our plans around recruitment. As we considered the issue in more detail, we realised that we did not need people as early as we had originally thought. We have not had any difficulties so far. It appears that people want to come and work for us.
link
You modified the original schedule for taking staff on board in light of experience, to reflect the fact that you did not need the staff at that particular point.
Yes, and to reflect the need to secure value for money, as this committee would expect me to do.
link
On the decision to move to a central IT system, reference is made in paragraph 30 of the report to a four-month delay—between January and April—in making that decision. Is that an unusually long period for such a decision to take?
That was the period in which we were considering the in-house option. We had to work it through in a lot of detail with our colleagues in the Scottish Government IT division. It is not a decision that one takes on the basis of a casual conversation; there needs to be a full understanding of requirements on both sides. I do not think that it was an unreasonable amount of time to spend considering that option.
link
If Audit Scotland did its report again tomorrow, do you think that it would come up with the same result?
I would be surprised if it did. For example, it would now see a demonstration of the IT system and would be able to meet the operational staff, so things would look materially different from the position in October, when a lot of the field work was being done.
In paragraph 1 of the report, the Auditor General says that there is an increased risk that the IT system will fail. Is the contingency plan for Registers of Scotland, for example, to use pen and paper to deal manually with between 450 and 600 transactions every day?
It would involve solicitors sending in manually produced paper tax returns; we will offer that option anyway, even when the IT system is live.
So the contingency plan is pen and paper.
Yes, for solicitors to send in their plans. However, we will process those submissions behind the scenes.
There are between 400 and 650 transactions a day at Registers of Scotland and something like 40 at SEPA. Is the contingency plan to use pen and paper for all those transactions?
The contingency plan is for everyone who would be submitting a land and buildings transaction tax return to submit a paper return.
So it is pen and paper. Thank you.
We are constrained by time this morning, but I would like to ask Alyson Stafford a question about two papers that we have from her predecessor, Paul Gray. In October 2012, he gave this committee a categorical assurance that everything was totally on course for the land and buildings transaction tax. I have it all written down before me. What happened between October 2012 and October and November 2014, which is when the Auditor General and her staff collected the information about your progress and highlighted to this Parliament that there was an increased risk that Scotland would not be able to collect the taxes on 1 April?
On the issue of whether I have had a predecessor, I have been in the post of director general since 2010 and have been the principal financial adviser to the Government since—
Paul Gray responded to Audit Scotland’s report on managing ICT contracts. He was the person in charge at that time.
Yes. The ICT digital leadership sits with other parts of the Government. It is not something that comes under my direct responsibility as director general for finance.
You are asking about how this programme is going.
I am asking about what happened between the categorical assurance of success and the notification of increased risk.
As Eleanor Emberson has already said, there are risks in any project and programme. The elements and actions that are now in place are to manage those risks actively, between now and the end of April.
You have had over two years to manage the risk. Two years and two months later, the Auditor General says that there is an increased risk. Two years and two months ago, you were categorically confident that you were on course to collect the tax. In December 2014, you have an increased risk. I am asking what has happened in between.
10:30
To be fair, I would need to check the record of what Paul Gray said at the time.
I have it here. I am happy to pass it on, although I would need to photocopy it, because I like to refer to it.
That is fine—I understand about your pile of paper.
In this particular programme of activity, a series of actions has taken place. That has included putting legislation in place. A number of the actions in relation to legislation were running during the timeframe to which you refer. For example, the processes for the Land and Buildings Transaction Tax (Scotland) Bill, the Landfill Tax (Scotland) Bill and the Revenue Scotland and Tax Powers Bill all took place. In terms of the—
So legislation led to the delay.
No, it has not led to the delay. It has been an integral part of having the right conditions so that Revenue Scotland can specify an IT element within the programme of delivery. Work on the specification started more than a year ago. That involved working with business analysts to specify what was required and discussions about whether it was appropriate to have an in-house system or an externally supplied activity. Eleanor Emberson can say more about that.
The contract has been agreed with a supplier that is involved in a framework agreement, so there is knowledge and experience of working with the supplier and it has credibility and a track record with the Scottish Government. Since the contract was established, the supplier has been delivering on time and on budget. That is why Eleanor Emberson can say that, although there are risks that have to be managed, there is confidence in the actions that are being taken and in the collaboration that is happening across Revenue Scotland, Registers of Scotland and SEPA and with the suppliers and all the various experts that have been involved to enable the taxes to be collected from 1 April next year.
As a member of the committee, I do not like being given assurances that I accept and then being told of increased risks. However, we will move on.
According to the finance secretary, John Swinney, by setting up Revenue Scotland,
“we will serve the needs of the people of Scotland at a lower cost than the UK set-up”.—Official Report, 7 June 2013; c 9906.
Well done. The original cost of setting up Revenue Scotland was to be £22 million, and the finance secretary said that he was bringing it in at a price that was 25 per cent lower than if the UK had done it. The figure is now less than 5 per cent lower, so what has happened? Why have the costs increased so much for the setting up of Revenue Scotland? Why did the finance secretary give a commitment, which would have been discussed with you, that the cost would be £22 million and 25 per cent less than if the UK had done it? It is now less than 5 per cent lower. What happened there?
There are two elements to that, one of which was reported fully to Parliament with the financial memorandum to the Revenue Scotland and Tax Powers Bill. To use the language of project management, there are changes to scope and there are changes to estimates.
The changes to scope are the bits that were reported fully in the financial memorandum to the Revenue Scotland and Tax Powers Bill a year ago. Revenue Scotland is now investing in developing one central IT system. We are putting additional resources into compliance for Revenue Scotland and SEPA, to ensure that we can use the legislation that Parliament has given us, which for instance includes provision on taxing illegal dumping and wider compliance powers for Revenue Scotland. Those were deliberate changes to meet the requirements of the taxes that have now been put in place by the Parliament.
The remaining £1.7 million relates to changes in estimates. My original estimates of set-up costs have turned out to be not as accurate as I would have wished, and our costs have gone up.
I appreciate that this must be very embarrassing for you and for the finance secretary, who made a promise on the information that he had that the cost would be 25 per cent lower. Given what we have heard today—that there is an increased risk that we will not be ready to collect the taxes and that we may have to resort to quill and ink and all sorts of things—and given the huge problems that you have had over the years, have you considered going back to the Westminster Government to ask whether it would delay implementation of the taxes to help you get your house in order?
We are absolutely on track. There is no need for any delay.
Okay. We have heard that before. I have a final question. You mentioned the canons of taxation, and being an old economist I know about Adam Smith’s canons of taxation. I think that I am right in saying that Registers of Scotland is a self-financing agency. Is that correct?
That is correct.
I have lost count of the millions and millions of pounds that have been spent on IT. The last time that you were here, you said that the cost had increased from £67 million to £113 million, but that was a couple of years ago. One of Adam Smith’s canons of taxation is that if the cost to collect a tax is more than the revenue that is gained from the tax, that is a tax that you do not collect—an example is the dog licence. Given that it is costing you so much to collect the LBTT, and given the difficulties that you have faced and the assurances that we have had, will you now have to increase the cost of stamp duty to home owners across Scotland?
If I may, I say to Caroline Gardner that even her predecessor, Bob Black, brought concerns to us about the long history of IT problems in Registers of Scotland. Given the problems that you have had and the huge increase in costs, will home buyers and businesses have to pay more in stamp duty in order that you can continue to be self-financing?
I will pass your general point over to Eleanor Emberson or Alyson Stafford. However, we are not building the collection system; Revenue Scotland is doing that. We have a role to play in supporting that, but it is a very limited role.
We have to deliver an authentication server, and that is already there. We delivered that as part of the delivery of four new IT systems, which we introduced to support the Scottish Parliament’s Land Registration etc (Scotland) Act 2012. That is our main contribution towards the IT and it will help the IT provider because it is something that they do not have to build. It also offers value for money because there is no duplication of costs.
There are two things that I should say. First, Registers of Scotland will not be self-financing around the work that it does on tax; it will be paid by Revenue Scotland for the work that it does, and that will be transparent to the Parliament. Secondly, we are looking at annual operating costs for Revenue Scotland, ROS and SEPA for the taxes of the order of £3.5 million, against estimates of £550 million or more for the tax revenue that is likely to be collected, so I think that we are a long way from the point at which you might have to worry about whether it is efficient to collect the taxes.
We have heard that before. Have you revised your estimates of payments to ROS?
I have not.
You are quite content with the cost of the IT systems and the difficulties that ROS has had in getting to this place.
ROS is not developing the IT system; Revenue Scotland is developing it.
Right—with your rising costs.
Okay. Colin Keir is next.
Thank you, convener, and good morning. I think that there is sometimes some paranoia in our committee that results from periodic discussions about other IT systems that have gone pear-shaped. I suspect that the HMRC £3 billion mess-up dwarves most things. In fact, having looked at exhibit 3 in the Auditor General’s report, I believe that if you can get from the beginning to the end in the manner that you are talking about you will probably have the most successful IT set-up that we have seen in many years in public services. If that happens, I will be the first to commend you.
As I said earlier, one of the things that had impressed me—although perhaps not others—particularly given HMRC’s record of wastage, with £3 billion lost, was the fact that you identified relatively early that it was better to have the IT project as an external project, rather than an in-house development. That is where the delays as identified in this report at this time came through.
Why did you come to that decision? Will you give me a clearer idea of the questions that you were asking at that time to allow you to make that evaluation?
Are you asking about the evaluation that led us to decide to use an external contractor?
Yes.
We worked fully through our requirements with the Scottish Government IT team, so that they understood them. We had been doing the very detailed business analysis work to specify requirements from the summer of 2013, when we were working alongside colleagues on the finalisation of the Revenue Scotland and Tax Powers Bill. We had done a lot of work on that. We then worked with the Scottish Government IT team to make sure that they understood that fully and that we understood whether they were in the best position to take on the work. It was, in the end, a mutual decision that it was better for them to take a role supporting us through procurement and working with an external contractor than to take on this work directly, for reasons of capacity and the other demands on them. The capacity constraint is about making sure that if anything requires us to scale up effort at any point during the programme, there are enough people not just to do the work but to respond to anything that might come up in the course of the work.
So it was all done for the best of reasons of cost-effectiveness.
And reducing risk.
Of course. That takes us to the point that it is better to be risk aware than risk averse, or whatever.
On the timeline from when the Auditor General set the report and when it had to be published, so much information has come out recently, such as what the First Minister said last Thursday. We are looking at a different scenario now than we were previously. There is absolutely nothing wrong with the Auditor General’s report—it was of a time—but we have to be aware that a lot of the risks that are mentioned in the report are being dealt with. As you say, things have moved on quickly, even from what the First Minister said last week.
Indeed. The position on risk now is considerably different from the position when the Auditor General’s staff were doing the work. I would say that the risks are considerably lower at this point than they were when that work was being done.
Okay. I understand the time constraints. I have a few other things to ask, but I will leave it there.
My first question is for the director general. When the Government appointed the head of Revenue Scotland, was there an internal board or was it an external recruitment exercise?
It was a posting into the role. The head of Revenue Scotland was brought in on a proportionate basis across director of financial strategy and head of Revenue Scotland, recognising that there would be a start point and a ramping up of capacity. It is getting the balance between the people who were needed and the cost.
Was it an external exercise or an internal one?
It was internal.
There was no external recruitment to the post.
That is right.
Was there a reason for that? Is that normal at that level, for a very senior job in the Scottish civil service?
I think it is about recognising that there are different phases when you—
I want to know whether that is a normal process for a senior job like that in the civil service.
Individual posts are assessed, at the particular time, on a case-by-case basis.
Thank you—that is very helpful.
I return to the convener’s question about the evidence that Ms Emberson gave to the Finance Committee on 26 November. In that evidence—as you have already mentioned—you said to Gavin Brown:
“There has been a lot of progress but there is nothing negative that I need to report.”—Official Report, Finance Committee, 26 November 2014; c 29.
You said that despite knowing that there was an Audit Scotland report that showed that risk had increased.
10:45
I knew that an Audit Scotland report was due to come out and I had some expectations of what it might say.
You had factually signed it off.
I did not factually sign off the Auditor General’s assessment of risk. I agreed the facts—the dates and numbers—on which all of this is based. As the Auditor General has already said, she reached her own conclusions.
Which you do not agree with.
I do not share her perception of risk.
You do not agree with her.
Yes.
You felt that there was nothing negative that you needed to report to the Finance Committee on 26 November.
I said that there was nothing negative that I needed to report in terms of what had changed between when I submitted my written report to the committee in mid-October and the end of November.
You did not feel obliged to tell the Finance Committee—a committee of this Parliament—anything else that might have been of interest to it.
The committee asked me about progress and about the red-amber-green system. I declared that we had a number of areas at amber, which would indicate active risk and active management of risk. I thought that I gave the committee a fair picture of—
You think that you gave the committee a fair picture by saying that there was nothing negative that you needed to report. Was that a fair picture?
In terms of the question that I was asked, it was—yes.
My, my.
In that case, if you disagree with the conclusion that risk has increased, how are we meant to make an assessment of what you are saying today? We have people from Audit Scotland in front of us every couple of weeks and they do not say such things lightly. You are a senior civil servant and, basically, you are saying that they are wrong. Why should we believe you?
You can believe me on staffing because I have told you the number of staff we have in place, and you can believe me on IT because I have told you that we have a system in testing; I have seen a demo of it. External people will come in to test the system in January. You will be able to see whether all of that remains on track.
So there is nothing to worry about—it will all be perfect on 1 April.
You can be sure that we are on track to deliver for 1 April, and you can be sure that I am on top of working out whether there are any problems and any actions that I need to take to deal with them.
That is just assertion, because the Auditor General says something different. Who am I meant to believe?
Well, I am asking you to believe me.
I have no further questions to ask.
I will take a slightly different direction. The Auditor General’s report states that
“Scottish and UK ministers are still to agree the adjustment to the block grant for the devolved taxes”,
and goes on to say that
“the Scottish Government has assumed that the reduction to the block grant in 2015/16 will allow it to meet the funding requirements of its budget and potentially establish the first payment into the cash reserve.”
Do you have any information for the committee on what the implications will be if the Government’s assumption is not met?
As far as the block grant adjustment is concerned, some progress has been made. In his autumn statement at the beginning of December, the Chancellor of the Exchequer announced that the UK Government would be changing its approach to stamp duty land tax. That has delayed the process of agreeing the block grant adjustment, because the data that are used as the basis for agreeing the adjustment will be sensitive to the forecast of tax from a UK perspective in 2015-16.
I can report that active progress has been made since the autumn statement. Officials have followed matters up and there have been discussions between UK and Scottish ministers. I expect an agreement to be in place by the time further material on the budget comes to Parliament in January. It is at that point that Scottish ministers and the Parliament will be able to assess the extent to which the block grant adjustment and the assumptions that were being made when we had to set out the draft budget in October this year can actually be delivered or can be adjusted appropriately.
Will using the adjustment that you have described make the deal cash neutral, or is there the potential for the Scottish Government to lose revenue?
The principles that were set out at the time of the draft budget were looking for that cash-neutral position and inclusion of something to go into the cash reserve. It must be the final analysis of the block grant adjustment that determines what that actually means in practice, but the feedback that we are getting is that we expect the adjustment for 2015-16 to be agreed in time for us to be able to deal with the necessary and normal budgetary processes in Parliament at the turn of the year.
Can we establish one thing? Everyone has agreed that it is a large and complex issue and that it has been a moveable feast with the Smith commission and the extra powers, during which process the implementation of the report was taking place. That is established, so I want to go forward by asking about what the report says.
Ms Emberson said that the figures in the report are factually accurate and that she agrees with them, but when it came to the Auditor General’s conclusions she would not necessarily—I do not want to say “agree”; let me say that her perception was slightly different. I will take you through some points in the Auditor General’s report. The first is:
“There is a risk that Revenue Scotland will not fill all of its operational posts in line with its plans”,
although the report also states that in phase 2 there would be
“Staff in post by the end of February 2015 (as originally estimated).”
Will those posts be filled in time for 2015?
We will have for 1 April all the people we need to collect the taxes. As I mentioned, we have filled 21 of 40 operational posts. Eight more are in a recruitment process—for three of those interviews are scheduled, and five are at a slightly earlier stage. That will leave us with 11 posts to advertise in the new year. I have no reason to believe that we will not have all the people we need.
It might be important to mention that, although we have a plan to bring people in by February, there has already been discussion before the committee of the critical path. That second phase of 20 posts are not on the critical path—nor, indeed, are the last 11 that I mentioned we have still to recruit. We do not have to have all 40 posts filled in order to go live successfully on 1 April.
It may have been Eleanor Emberson who said it, or it may have been in the Auditor General’s report, but I recall somebody saying that recruiting 40 staff all at the same time would not be beneficial to the process and that it would need to be done in phases. Is that correct?
Yes, that is correct.
In the second part of the report, the Auditor General says that
“There is a risk that the IT system for collecting the devolved taxes will not be fully implemented by 1 April 2015”,
and paragraph 27 suggests that that “may have consequences” and not that it will have consequences. Can you tell the committee what the situation is with the IT system? Will it be up and running for 2015?
As I have already mentioned, the IT system is currently in internal testing. In January, it will move to testing with external people; people who will eventually be users of the system will come in to help us with the testing. Once that testing has been done and we have addressed any problems that arise, we can have a high degree of confidence that we will be ready to go live on 1 April.
There has been talk of rising costs, and one of the witnesses who was on the panel with the Auditor General said in response to a question from Mary Scanlon about costs going up to £4 million that that rise was over a three-year period, so that the annual figure is £1.7 million. However, paragraph 46 on page 17 of the Auditor General’s report shows that there is actually a saving on HMRC’s costs, with a downward revision of between £5 million and £10 million. Will the money that is to be saved, as mentioned by the Auditor General, be subsumed as a saving in the overall running costs of the project?
The savings that come from the reduction in costs from HMRC are considerably larger than the increased costs for Revenue Scotland. They will flow back to the Scottish Government to be allocated to other public services, as you would expect.
I just wanted to make the point that £10 million is a substantial saving, when compared with a £1.7 million increase. That is a positive aspect.
I am sorry, but was that bit about the Scottish rate of income tax?
Yes.
I apologise for not being here at the beginning of the evidence. I do not think that I missed much, but I am sorry if I repeat anything, although I am sure that people will point that out.
You mentioned the critical path, which I raised earlier and wish to return to. I am grateful for your comments about the staff posts that are not on the critical path. Am I right in thinking that—as is implied by exhibit 2 on page 9—on 1 April you will not suddenly find that everybody wants to send you a tax return, and that what will actually happen is that people who happen to have bought or sold properties—whoever is responsible for doing that—will send you something relating to the transactions that have happened on that day? Will there be a relatively steady stream of transactions for you to deal with, rather than a pile of them suddenly arriving like the Christmas post?
We know from our colleagues at Registers of Scotland, who have been in the business for many years, that there are seasonal fluctuations in the property market. We expect between 450 and 600 tax returns per working day during the year, but the figure will vary. We are planning for going live based on the possibility that the number might be significantly higher, so that we are ready if there is a spike on 1 April. We think that there could be up to 800 returns on the first day because of a combination of factors in the transition between the taxes, and the help to buy scheme.
If there is a relatively steady stream—albeit that there are bound to be fluctuations—and if it so happens that the system does not quite work on 1 April, you can process the returns manually and get the system running on 2 or 3 April, or whenever. My real question is this: is this a soft landing—I think it is—or is there some genuinely critical date at which the system must work, or else we will be in trouble?
We absolutely have to have a means of collecting the tax and processing the tax returns from 1 April. If it had to be a paper-based system for a period, we could certainly make that work and still deliver a good service and ensure that the money was in the door. However, that is not what we are planning to do.
I am glad to hear that.
I return to the idea of critical paths, which are always a bit of a problem when we are having to test stuff. That is part of the process. We never quite get it right, and the system needs to be tweaked, but we never know how long that will take. How meaningful is it to have some kind of critical path analysis? I am sure that you have one in this case. Where do you derive your confidence from?
We derive our confidence from a wide range of factors, including that we monitor progress and assess risks regularly. We have been doing that weekly. I draw confidence from the fact that if anything were to come up that I had not foreseen and that we are not planning for, we have a contingency plan. I draw confidence from the fact that I have actually seen the IT system, which is perhaps an advantage that I have over everyone else in this discussion. I draw confidence from the fact that I know where we stand on staff recruitment. I work with the staff, and I know where we are.
It is still an IT project.
It is an IT project—you are right about that—until we have completed full testing, but that would be the case no matter how much time we had and no matter where we were. You cannot know until the very end, when you have done all the testing and you are sure that the system is ready. I have no reason to believe anything other than that we will be ready for 1 April.
I am not doubting that, but I wanted you to put it on the record, because there is a tendency to believe that IT systems are just like cars: that when you put all the bits in the right place and put petrol in, they will work. We need to understand that they may not be like that.
11:00
We have no reason to believe that the tax will not be collected on 1 April, but we have read a report that says that there is “increased risk” relating to your ability to collect on 1 April.
In response to Tavish Scott’s questions you talked about testing in January. Three weeks ago at the Finance Committee, Ms Emberson said:
“It is our intention to do in February and March what I, as a layperson, would describe as snagging: making absolutely sure that there are no little glitches.”—Official Report, Finance Committee, 26 November 2014; c 31.
The truth is that you may have little glitches, and you may have big glitches: you do not know. In “snagging”, which you have told the Finance Committee you will be doing, how can you be absolutely sure and totally confident that staff will not have to write out 800 transactions?
What I informally described as “snagging” is formally described as a “restricted testing environment”. After the system has been fully tested through user acceptance testing in January, it will be made available to a group of people who will eventually be users of the system. They will be able to play with it—I am told that I can use language like that—and make sure that we have missed nothing in testing. We do not anticipate that that will be the case. Such testing is simply good practice. It is what you would expect me to do at that stage in an IT project: we stop doing system development and make absolutely sure that the system works.
So, you can sit here and say that in February and March people will “play” with the system, and you can guarantee with confidence that snagging for glitches, be they small or large, will be overcome and all will be well on 1 April. Is that what you are saying?
That is what I believe will happen.
So, you know what is coming, you know exactly what the glitches may be, you know what snagging may be, and you know what will come forward in the testing. As a “layperson”, as you said to the Finance Committee, you can say that you will overcome all that, and say with confidence that you will be up and running on 1 April.
That is what we are working to achieve. We have very thorough testing plans and a good contractor: we are on track.
We heard that two years ago.
Forgive me, but I do not think that two years ago you heard that we had a contractor or were doing system development.
We heard that ROS had problems that had been highlighted over many years. ROS is essential to the success of the project, as well.
ROS was before the committee about two years ago. Since then we have learned a lot from the “Managing ICT contracts” report that Audit Scotland produced.
I can give you more than assurances that we have taken on board Audit Scotland’s comments about governance, financial budgeting and intelligent client functions. Over the past two years we have delivered on two major pieces of Scottish Parliament legislation. We delivered the crofting register at the end of November 2012 and a week past on Monday we delivered a range of new systems to support the Land Registration etc (Scotland) Act 2012.
Much of the discussion has been on progressing and planning the delivery of such systems. Every complex IT system is subject to change. What is important is having a plan, having actions for if the plan has to be deviated from, having a way of managing risks and having a way of managing dependencies.
As a member of the tax administration programme board I have dual role. I have one role as supplier: ROS must supply certain functions in order for the tax to go live. The main piece of IT equipment that we have to supply is ready and has been tested by the firm that is producing the eventual IT system. I can give you a reassurance that that is in place.
Our other main role is in policing the new tax. We currently do that for stamp duty land tax, so we are already very well prepared.
ROS has learnt from its experiences before this committee and we have certainly put that learning into active practice for the benefit of our customers—and, we hope, for the benefit of the wider Scottish public.
I do not know whether Alyson Stafford or Eleanor Emberson is responsible for this, but what plans do the agencies have to report annually on their performance in the various areas of tax compliance?
We are currently developing our performance reporting framework. We want to make sure that we are as transparent as possible. We will produce reports that will explain the volumes of cases that we have dealt with and the amount of money that has been collected. We are keen to ensure that people can understand what return we are getting from compliance work, and to work with the committee on what kind of reports it would find helpful.
Will there be annual returns from each of the agencies on tax collection, debt management, debt losses, value of tax, secure compliance yield, levels of error, fraud and so on? Will all that be reported annually?
It will certainly be reported annually, but we have been working on the assumptions that the committee will want information more frequently than that and that we would need to work with you on what sort of schedule of reporting would be helpful.
Right. That is helpful. What is the latest date by which you would have to decide to use the contingency plan?
According to how we have developed the plan, the date would be around the end of February.
Will you notify the committee if it is intended that the contingency plan will be used?
If that is what the committee would like us to do, then yes, we will.
That would be helpful, thank you. I know that you have a hectic morning—you are now going to the Finance Committee—but the meeting has been very useful. Thank you for your time.
In this meeting
Everything on 17 Dec 2014 →- 10:00 Interests Procedure · 3
- 10:00 Decision on Taking Business in Private Procedure · 1
- 10:00 Section 23 Report Committee business · 333
- 11:00 Section 22 Reports Evidence session · 15
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.