Good morning, gentlemen. I want to ask about air pollution and air quality monitoring, which are issues highlighted in BRIGS’s submission to the committee. During the Forth replacement crossing project objection stage, residents at Echline fought for proper air quality monitoring to be adopted. It was an integral part of the FRC project mitigation process. During the passage of the Forth Crossing Bill, the Scottish ministers undertook that that would happen. My understanding is that the air quality monitoring equipment has not been installed at Echline corner. Do you agree that that undertaking was given? If so, why has the equipment not been installed?
Official Report · Committee
Forth Replacement Crossing
Speakers
Showing Jim Eadie only · show everyone- Lawrence Shackman Transport Scotland 24
- David Climie Transport Scotland 22
- Gordon MacDonald SNP 20
- Maureen Watt SNP 14
- Alex Johnstone Con 5
- Jim Eadie SNP 4
- Adam Ingram SNP 3
- Elaine Murray Lab 2
Jim Eadie’s contributions
4 contributionsWhen was it installed?
Your statement that the air quality monitoring equipment had been installed was a helpful reassurance and, if the concerns that have been expressed by BRIGS and the local community have been listened to and acted on, that is very welcome. However, it would also help the committee if you could clarify when the equipment was installed.I have a question about the on-going commitment beyond the construction phase of the crossing. Given the reference in BRIGS’s written evidence to the daily prospect of 93,000 vehicles passing in close proximity to the Echline corner and in very close proximity to residents’ properties, do you see an on-going requirement for air quality monitoring and, if so, who would be responsible for that?
But you will consider the requirement for on-going monitoring.
In this meeting
Everything on 6 Mar 2013 →- 10:00 Decision on Taking Business in Private Procedure · 1
- 10:00 Forth Replacement Crossing Committee business · 94
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.