Parliament Workbench
Data: Official Report to 26 Nov 2026

Official Report · Committee

Forth Replacement Crossing

Tuesday 2 February 2010 Transport, Infrastructure and Climate Change Committee Committee business 134 contributions · 12 speakers

Speakers

Showing Shirley-Anne Somerville only · show everyone

Shirley-Anne Somerville’s contributions

15 contributions
link

I will ask about the site compound, which you mentioned. What is your position on the site that you proposed initially? Is it still in the bill or has it been categorically ruled out?

link

People are concerned that the ability to use that land still appears to be on the table and in the bill.

link

The use of Society Road has raised great concerns. The communities have not yet been told how long the road will be used for access to any site compound and the estimates vary quite dramatically. Can further work be done to give people clarification on the use of that narrow road in the village?

link

I have one last question on that. It might still be useful to allow the communities to sit down with Transport Scotland to discuss the transport modelling that has been done so that they can get an idea of how the figures have been developed for the different roads that you will use, which will be used differently after the bridge has been built. I know that the figures are available, but it is sometimes useful to drill down behind them so that people get an understanding of where they came from. Would that be a good sign of openness, in the spirit of the consultation with the community that you are now taking on?

link

Perhaps I can save Mr Duff some of the bother. I suggest that, considering that it will have a large impact on the community, it would be useful if some way was found of explaining the information to lay persons, whether they are MSPs who are involved in the committees or members of the affected community. There must surely be a way of explaining it to people such as me and to the community—perhaps not today—in a way that allows them to ask questions about it.

link

The policy memorandum says that"The embodied carbon assessment is not yet complete",but an initial calculation suggests that it will"be in the order of 121,000"tonnes of CO2. Will you describe how that figure was calculated and advise us when the final figure will be available?

link

Is a process being completed to ensure that that figure is kept as low as possible? I accept that, until you have the tenders from the contractors, you will not know their best estimates, but will you then try to ensure that the embodied carbon level is kept as low as possible rather than just pick a figure?

link

The policy memorandum also says that, in 2032, the additional carbon emissions that will be due to the Forth crossing might be 20,317 tonnes. Why did you pick 2032? That does not relate to the Climate Change (Scotland) Act 2009 or anything else on the general climate change agenda.

link

So, we just extrapolate from the figures for those years.Is it the case that the figures for carbon emissions from the Forth crossing do not include any increase in emissions that would result from a cable replacement on the current Forth crossing?

link

As has been mentioned, the crossing is a very long-term project. What is being done to minimise the disruption to the existing—and very busy—commuter routes at various stages of the project?

  1. Scottish Parliament Transport, Infrastructure and Climate Change Committee Tuesday 2 February 2010 Committee business · 1
  2. Forth Replacement Crossing Committee business · 134
  3. Forth Crossing Bill Bill debate · 113

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.