Forth Replacement Crossing
Speakers
Showing Charlie Gordon only · show everyone- John Howison Transport Scotland 37
- Patrick Harvie Green 24
- Mike Glover Transport Scotland 20
- Shirley-Anne Somerville SNP 15
- Alison McInnes LD 7
- Charlie Gordon Lab 7
- Alan Duff Arup-Jacobs 7
- Margaret Smith LD 6
- Frazer Henderson Transport Scotland 4
- Marlyn Glen Lab 3
- Cathy Peattie Lab 1
- Alex Johnstone Con 1
Charlie Gordon’s contributions
7 contributionsThe design for the main structure of the new crossing has three towers, rather than the more usual two. Why is that? What impact will that have on the budget?
Yes. That is a comprehensive answer, the second part of which anticipated my next question to a substantial degree.Transport Scotland has advised that the design of the arrangement of the cables that will support the bridge deck of the Forth crossing is unique. You have explained why that novel design was chosen, but you will understand that there may be concerns or perceptions that it might, because of its unique aspects, be more expensive and subject to greater risks than a standard design might be.
You mentioned a bridge in Hong Kong, which seems to be a kind of comparator. How much did it cost?
Indeed. How true.
It remains to be seen whether saying "Trust me: I'm a structural engineer" goes down better with the public than saying "Trust me: I'm a politician."I gather that when we talk about the cost of the bridge element of the Forth crossing project compared with the cost of the bridge element of the Stonecutters bridge project in Hong Kong, we might be talking about a ratio of 2:1 in comparative costs.
Do you have figures for how much building a two-tower cable-stayed bridge would cost, even if that required the use of thicker cables and was less aesthetically pleasing?
In this meeting
Everything on 2 Feb 2010 →- Scottish Parliament Transport, Infrastructure and Climate Change Committee Tuesday 2 February 2010 Committee business · 1
- Forth Replacement Crossing Committee business · 134
- Forth Crossing Bill Bill debate · 113
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.