I will take a slightly more personal view. I have been crossing the Forth since the original bridge opened in 1964 and I continue to do so on the new one. I do not want to rain on anybody’s parade, but Colin Beattie’s unrelenting good news is maybe as seen from afar. From a bit closer up, I see unrelenting delays. The bridge opened and then immediately closed. I have crossed in the evening and found two lanes closed and had to bump across on the hard shoulder, and I have had correspondence from constituents who have had the same experience. You say that some work is being done, but it seems to be more than some work. Was the bridge actually finished when it opened? You say that you are going to look at its operation in future. Will you be a little more critical of Transport Scotland? We have an empty bridge with virtually no traffic on it, but we still have traffic queued up on the new bridge.
Official Report · Committee
“Forth Replacement Crossing”
Speakers
Showing Bill Bowman only · show everyone- Caroline Gardner 22
- Graeme Greenhill Audit Scotland 13
- Jillian Matthew Audit Scotland 12
- Bill Bowman Con 12
- Alex Neil SNP 9
- Liam Kerr Con 8
- Colin Beattie SNP 5
- Iain Gray Lab 2
Bill Bowman’s contributions
12 contributionsIt is having an effect for those who try to cross the bridge in the evening and who find that it is down to one lane, with a long queue waiting to cross. We all know about snagging from buying a house. It is about there being a crack up in the corner; it is not about the roof not being finished or something like that. The term “snagging” implies minor repairs. If, as you say, the work needs to continue until the end of 2019—I presume that lane closures will continue until then—I cannot agree that there is not something wrong in the way that the bridge has been managed. However, your report is your report, and I hope that you will come back to the issue of how the bridge is being operated.
I have a question on the costs. On page 29, you talk about inflation of 5.3 per cent being included in the estimates. Is that correct?
It is on page 29, in the bottom graphic. As I understand it, inflation probably came in at about zero, using the appropriate index. Does that mean that a lot of the cost saving comes from there being no inflation?
Can you give me a number for the inflation savings?
So £200 million was saved by inflation. You say that the project was well managed but, if inflation came in at £200 million less than expected, that takes away quite a lot of the trumpeted saving.
When you say that there was a cost saving of whatever, how much of that was actually due to inflation not being as high as estimated?
Is that not savings?
I am trying to understand whether Transport Scotland did something good in the management of the project or whether it just benefited from inflation being less than was originally estimated.
I do not want to labour the point, as we probably have other questions, but you have given an original number and said that the costs were less, so how much of that was due to inflation? That is all that I am trying to establish. It is about the estimated 5.3 per cent figure for inflation versus what it turned out to be.
10:15
If you do not have the information, I am happy to get it later or to get an explanation later.
I understand that, but I think that an element in how well the project was managed is that there was good fortune because inflation was less than estimated.
I have a final comment as an accountant—although I am not giving an accountant’s perspective. If the money aspect was good, that is good. However, if users matter, I should say that I have been through the whole construction phase as a user and I am a continuing user, and my experience has not been good. I do not expect you to comment on that; it is just my view.
In this meeting
Everything on 27 Sep 2018 →- 09:00 Decision on Taking Business in Private Procedure · 1
- 09:00 “Children and young people’s mental health” Committee business · 86
- 09:45 “Forth Replacement Crossing” Committee business · 83
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.