Dave Petrie Con Highlands and Islands
link

Thank you. I think that your answer probably covered my next question.

Karen Whitefield Lab The Convener · Airdrie and Shotts
link

We would all be misguided if we were to believe that some communities in Scotland were crying out to have waste management plant on their doorstep. I do not think for one minute that any of the witnesses are naive enough to think that. However, will the requirement on local authorities to ensure that there is pre-application consultation and consultation on development plans allow there to be a more open and transparent debate on how we manage our waste in Scotland? Will it give communities a say in the types of waste management facilities that are located within their boundaries?

Malcolm Macleod Scottish Society of Directors of Planning
link

There are different scales to consider, one of which is at the strategic level, whether through the area waste plans or the development plans. As is the case in community engagement in the rest of planning, waste management is probably one of the most difficult areas when it comes to allowing communities to set the agenda, because so much of its management is driven by strategy and the use of the best technology.As regards the proper community engagement that is built into the Planning etc (Scotland) Act 2006, getting community engagement as early as possible, as happens with affordable housing and other big industrial processes, is the way forward.It is critical that the mitigation and pre-application process is transparent and that it is done as early as possible. Communities must be able to see how their concerns have been taken on board. Although the process is never straightforward, whether it is done at the strategic level or the local level, it must be demonstrated that some mitigation has been put in place or, if it cannot be put in place, it must be explained why not. That is the way forward.

Graham U’ren Royal Town Planning Institute in Scotland
link

Although we welcome the SPP and the great improvements in the way in which the planning process is set out, I am inclined to think that some of the basics have not changed, so a lot will boil down to practice. For example, the Executive expresses concern in the draft SPP that"To date, a number of planning authorities have failed to take account of the need for waste management infrastructure in their local plans."If authorities are simply not putting enough into the plans, there is nothing much to consult on in the first place. Therefore, not only must we make the new ideas in the Planning etc (Scotland) Act 2006 and the procedures that arise from them work in the way that is intended, but we must ensure that we put into the system the things that are intended to go into it. That is particularly the case in relation to local plans, which need to do more to help the delivery of the infrastructure that is needed.We also need to move beyond the funnel of broad, criteria-based policies that do not give a clear indication of what people can expect. As I said, it does not help that we cannot anticipate much about what the commercial sector produces. However, if local authorities are to make a real attempt to tackle the issue in development plans, as the Executive expects them to do, the new procedures will be vital. For example, main issues reports will set out not just current proposals but possible alternatives, which will generate exactly the kind of debate that should take place, without prejudice to the outcome. That is an important new part of the process.A technical issue that is not yet resolved and which requires secondary legislation is the definition of developments for which pre-application consultation will be required. We all assume that the major criteria for inclusion in that category will be the scale and complexity of the proposed development, but perhaps the special nature of a development and bad-neighbour issues should be included in the definition of major developments and developments for which pre-application consultation will be required.There will be many planning applications for municipally run facilities. Under the new arrangements, there will be a notification procedure if a local authority has any interest in an application, even if the proposed facility is contracted out and the application is made by a third party. The new approach to local authority applications will be important and different from the current procedure, in which a notice of intent to develop is required. The criteria that we expect ministers to apply will be to do with not just national policy but how an application progressed through the system and whether everyone had a fair crack of the whip and appropriate issues were considered. The new system will be well exemplified by the approach to waste treatment facilities.

Katherine Donnachie Scottish Environment Protection Agency
link

The new procedures for increased consultation, pre-application consultation and development plans will be important in ensuring that the public are given information at the earliest possible opportunity. Perhaps this sounds naive, but if the public understand why waste management is so important—and that it is everyone's responsibility—they might have a more realistic understanding of why facilities must be provided, even if they do not like them. The fact that an issue is difficult is not an excuse for not addressing it. It is incumbent on us all in the Executive, SEPA, local authorities and the waste industry to be more proactive.

Gordon Pollock Convention of Scottish Local Authorities
link

The initial area waste plan process has been open, transparent and inclusive. As strategic outline cases for funding have been submitted throughout Scotland—and draft outline business cases in Lothian, the Borders and the Lanarkshires—if an approach has been at odds with the existing area waste plan, the same type of process has been followed. Options have been analysed and there has been public consultation, including a strategic environmental assessment. That happens at area level, but the difficulty is what happens when a development is proposed at someone's own back door, as I said. The public are obviously more interested in such proposals, which is why as much pre-application work as possible must be done. However, until we know what technology will be used and on what site, it is difficult to provide full details to communities.

John Home Robertson Lab East Lothian
link

I spent yesterday evening at a meeting of the local liaison group at Dunbar cement works. I underline the need not just for pre-application consultation but for continuing engagement with communities. It is not surprising that people were frightened and alarmed when they learned that large numbers of car tyres and countless tankerfuls of recycled liquid waste containing all manner of nasty stuff might be handled and burned at the cement kiln in Dunbar.There was a lot of discussion before consent was granted—it is still going on. The issue is an important one for COSLA to deal with. It is very valuable for local community councillors, SEPA officials and others to be actively and regularly engaged throughout the year in explaining what is going on, how the matter is being handled and why things are being done. That can avoid all sorts of misconceptions. I hope that that is a principle that can be carried forward elsewhere.

Kathy Cameron Convention of Scottish Local Authorities
link

We will take that on board.

Karen Whitefield Lab The Convener · Airdrie and Shotts
link

We have covered a number of areas of interest to the committee and the three panels. Are there other issues on SPP 10 that we have not covered thus far that you feel the committee needs to consider?

John Ferguson Scottish Environment Protection Agency
link

We welcome the strong connection between SPP 10 and the area waste plans. The on-going process of updating and reviewing area waste plans is imperative in terms of public engagement and detailing future requirements with industry. SPP 10 contains a reference to SEPA's guidelines on thermal treatment. SEPA saw the possibility of a massive shift from landfill to mass-burn incineration and realised the risk presented by that, in relation to not only public perception but environmental and resource efficiency. As I said, we welcome the connection between SPP 10 and the area waste plans. The guidelines give a clear indication that, where thermal treatment forms a necessary part of the future, it must be in the form of high-efficiency energy recovery. Embedded energy in waste should not be wasted simply as a convenience of disposal.

Gordon Pollock Convention of Scottish Local Authorities
link

On that point, there is a lot of discussion among the Scottish Executive, SEPA and COSLA on the efficiencies of potential energy from waste facilities. The draft SPP mentions that the existing national waste plan indicates that 14 per cent of the requirement for municipal waste could be met by thermal treatment. The likelihood is that significantly more waste will be treated in that way. Although it is clear that it is best to have as much thermal efficiency as possible in these new facilities, the big issue is getting that efficiency on the ground on day one. We are looking to contractors who are not under the same requirement in England to link in with a third party to provide combined heat and power. The process is almost one of taking a bottom-up approach. If this is a good thing to do—which it is—the process needs to be driven from the top and, potentially, from the planning side of things. I feel that the draft document does not deal with that in enough detail.

Karen Whitefield Lab The Convener · Airdrie and Shotts
link

Do you have any further issues, Mr Macleod?

Malcolm Macleod Scottish Society of Directors of Planning
link

No. We covered all our main points.

Katherine Donnachie Scottish Environment Protection Agency
link

The national waste plan mentioned that the Scottish Executive would look at whether applications in Scotland that run contrary to the national waste strategy and to which SEPA objects should be notified to Scottish ministers, as happens with applications in which flood risk is an issue, in relation to which SEPA advises against approval or recommends conditions. There is no mention in SPP 10 of whether that has been considered or whether there is a case to notify those applications to ministers.

Karen Whitefield Lab The Convener · Airdrie and Shotts
link

That concludes our questioning. I thank all panel members for their attendance at committee. The meeting will be suspended briefly to allow for the changeover of witnesses.

Meeting suspended.

On resuming—

  1. Scottish Parliament Communities Committee Wednesday 28 February 2007 Committee business · 1
  2. Planning for Waste Management (Draft Scottish Planning Policy) Evidence session · 217
  3. Subordinate Legislation Subordinate legislation · 13
  4. Subordinate Legislation Subordinate legislation · 14
  5. Subordinate Legislation Subordinate legislation · 12

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.