Willie Rennie LD The Convener · Fife North East
link

Good morning, and welcome to the 12th meeting in 2026 of the Transport Committee. We have received apologies from Iris Duane, Zen Ghani and Collette Stevenson. I am pleased that Martyn Day has joined us again, and he is attending as the Scottish National Party substitute.The first item on our agenda is an evidence session on ferries, ports and harbours. We will hear from two witness panels this morning. I am pleased to welcome the first panel: Richard Ballantyne, chief executive of the British Ports Association and secretary of the Scottish ports group; Kevin Hobbs, chief executive of Caledonian Maritime Assets Limited—CMAL—and Calum Mackenzie, chief officer, assets and infrastructure, at Comhairle nan Eilean Siar, who is representing the Scottish Collaboration of Transport Specialists and is joining us remotely. Also on the panel are Duncan Mackison, chief executive of CalMac Ferries, and Jacqueline McDonell, chief executive of the Mallaig Harbour Authority.As always, if we can keep our questions and answers as short and concise as possible, that would be helpful. The first member to ask a question is Lloyd Melville.

Lloyd Melville SNP Angus South
link

Good morning. I would like to start by asking Calum Mackenzie about the general condition of a lot of the ports and harbours that we have in Scotland, and then I will come to the rest of the panel on that. First, what is your view of the general state of our lifeline ports and harbours? Is their state sufficient to provide the ferry service that Scotland needs?I cannot hear you, Calum, so I will start by putting the same questions to Jacqueline McDonell. What is your view of the general state of our ports and harbours? Is it sufficient for the ferry service that we need just now?

Jacqueline McDonell Mallaig Harbour Authority
link

I can only speak about our harbour in Mallaig. Although our harbour is sufficient for the service that we have at the moment, it is not necessarily future proof for the service that we might want to have going forward. We have services to seven different islands from Mallaig, and one of them is not served by CalMac, so it is a different route altogether.Our infrastructure is sufficient for what we need at the moment, but it is ageing and creaking at the seams a little. That is a positive thing—it is because all of the economies of the communities that we service are growing and that is what is causing the pressure for us rather than the infrastructure. It is about economic growth in the communities that we serve.

Lloyd Melville SNP Angus South
link

I read in your submission that your ideal piece of work would cost in the region of £100 million. Is that right?

Jacqueline McDonell Mallaig Harbour Authority
link

Yes.

Lloyd Melville SNP Angus South
link

Obviously, being a trust port, you have particular challenges with accessing capital. Do you want to talk us through a bit of that?

Jacqueline McDonell Mallaig Harbour Authority
link

Because we are a trust port, we do not have any shareholders. We have to operate on a commercial basis, so we generate dues and reinvest every penny of the dues that we receive. However, our turnover at the moment is around £2 million, so it is very difficult for us to fund a £100 million project. The other way that we would do it, if we were not able to access grant and loan funding—and it needs to be a combination of all sorts of funds to put together towards the £100 million—would be to increase our dues, but that would be an ongoing commitment to the public purse for ever, whereas a capital grant is a one-off spend.

Lloyd Melville SNP Angus South
link

Okay, thank you. I will maybe come back to that later on. Duncan Mackison, the same question goes to you.

Duncan Mackison CalMac Ferries
link

We operate from 55 different locations, and there is a huge variety in the conditions. Some of the ports and harbours are in excellent condition and have been modernised, and some of them are historic, so there is a huge variety. The ones that concern me most are the ones that are fragile and are still operating. The ones that are fragile are often in quite exposed locations, because being exposed often goes hand in hand with becoming fragile.

Lloyd Melville SNP Angus South
link

Roughly how many of them would you consider to be in that fragile state at the moment?

Duncan Mackison CalMac Ferries
link

I would say probably about 20 to 25 per cent. However, there are some in relatively remote locations where we have to be really careful because, if one of our vessels damaged a piece of infrastructure, just rebuilding that would leave the community in a really difficult position for a long period.

Kevin Hobbs Caledonian Maritime Assets Limited
link

We own 27 of the ports and we have an ongoing commitment to improve the port infrastructure. We have done a huge amount of work on replacing infrastructure over the past 20 years, and that has accelerated in the past eight or nine years, but it is undeniable that some of them still require to be upgraded.I am sure that you are aware that we recently bought Ardrossan harbour. It was not in our portfolio until 17 March this year, and we had ongoing concerns about it. We now own it, but it needs a huge investment to make it fit for purpose; at the time of purchase, we considered that it really was not fit for purpose.We have been afforded quite a lot of money, but whenever you do marine projects, the amount of money that you need is absolutely astonishing. One example is Port Ellen harbour, which we closed in early June this year and will be closed for about two and a half to three years; that project will cost £108.8 million. That gives you the quantum of what is required, and that is just one port out of 27, so you can see that a huge investment is needed.Having said that, we have been afforded an awful lot of money to improve quite a lot of harbours, some of which are CMAL’s and some of which are not, and the Government has also contributed to those harbours, along the lines of what Jacqueline McDonell said about funding.

Richard Ballantyne British Ports Association
link

In answer to Mr Melville’s question, the ports are broadly fit for purpose, but a lot more could be done. If we look across the network of ports across Scotland, we see a broad differential between the trading ports and the ports that provide services to the energy sector, the fishing industry and, of course, ferries and essential lifeline connections. We have seen some excellent investment in those from Transport Scotland, through CMAL, and that has helped. As ever, I am sure that the sector could do with more money, and there are bigger projects that it would like to get involved in.I know that the remit of this evidence session is ferries in particular, but we must not miss out on the other parts of the sector, particularly fishing, where there is a lot of ageing infrastructure and those traditional industries are moving to or consolidating in different areas. How those ports balance what they do with declining incomes is quite a challenge. As Kevin Hobbs mentioned, ageing infrastructure is very expensive to replace.On the energy side, servicing the offshore renewable sector is an aspiration that we have, but some of those developers are not yet willing to pay, so the ports are waiting and they are potentially looking for some public sector support.Broadly, as a collective, the sector is fit for purpose, but more can be done.

Lloyd Melville SNP Angus South
link

Jacqueline McDonell mentioned the need to future proof, and we would all agree with that. Looking ahead, what scale of investment is required to future proof the ports and harbours in Scotland?

Richard Ballantyne British Ports Association
link

Across the United Kingdom port sector, about £1 billion goes into infrastructure each year. A lot of that is predominantly privately sourced, although the CMAL figures will be included in that each year. We do not have a finite figure on what the numbers will need to be—or could be—in Scotland, but any self-respecting commercial port operator will be looking to develop, grow and increase its resilience, because investments are not just for short-term gains—they are for generations ahead.

Calum Mackenzie Scottish Collaboration of Transport Specialists
link

Can you hear me?

Calum Mackenzie Scottish Collaboration of Transport Specialists
link

Good morning. I apologise for the audio issues.It is quite difficult to answer your question. On whether our ports and harbours are fit for purpose for just now, I would say that they are managing. However, as other speakers have highlighted, a number of fragile ports could be rendered inoperable if there were the wrong weather conditions or if there was the wrong ferry berthing or a collision.Purely in relation to ferries, as opposed to all the other industries that use our smaller ports, SCOTS recommends that we carry out a review that would give information on what we need just now and what we will need in the future. New vessels are sometimes bigger, with more windage. Given that climate change forecasts suggest that there will be more severe weather, there could be more disruption, so we need more stable berths.For now, we are managing the infrastructure between us. For the future, we need to work collaboratively to consider all the areas in which investment is required and match all that work with new vessels. CalMac’s written submission includes some very good points, particularly on what might be coming in the future. We should be able to better answer your question next time, following a review of our ports and harbours, especially the critical ones. We should consider what we need for the future and then come up with an investment plan for that.

Lloyd Melville SNP Angus South
link

Such a review would go some way in answering the question about the consequences of not finding capital funding for the work. If we have a number of fragile harbours, I imagine that there is a pressing need for capital investment.Jacqueline McDonell, what has your engagement been like with the Scottish Government on potential funding for work at Mallaig?

Jacqueline McDonell Mallaig Harbour Authority
link

We are in a fortunate position in that we have good relationships with Transport Scotland, CMAL and CalMac. We have all been working together to try to make progress. Transport Scotland has just funded a project to build an overnight ferry berth, because, when all the ferries that should be operating from Mallaig are there, we have five ferries, three of which need to berth overnight in Mallaig. We have just done that work with Transport Scotland, and that funding is much appreciated.We have been through several loops with CalMac and CMAL to try to find a cheaper alternative for our infrastructure. The changes are needed for positive reasons—the communities that we serve are growing—but there is no point in trying to save money in that regard. Instead, we need to invest a reasonable amount of money in building something once. With the MV Lord of the Isles replacement, we considered a do-minimum option, but that option would have cost £40 million and would not have made things fit for the future, because it would not have enhanced the terminal building, the freight facilities, the marshalling lanes and so on. It would just have dealt with the infrastructure for the boat berthing.The issue is not that we do not have good relationships with the Scottish Government, CalMac and CMAL. It is that a lot of money is required, and there are always demands on the budget from various sources.

Lloyd Melville SNP Angus South
link

I am very much of the view that, sometimes, good things are worth paying for. I know Mallaig quite well, because I have family on Knoydart—perhaps I should have declared that as an interest.CMAL’s view, as set out in its written submission, is that progress on such work would be accelerated if it owned more of the ports and harbours. Do you all share that view? Is the scattered ownership between various bodies, including local authorities and trust ports, a barrier to the investment that is needed?

Duncan Mackison CalMac Ferries
link

As you will have seen, I hope, from our written submission, we very much take the view that we need to look at these things, including vessels and infrastructure, as a system. That is a helpful way to consider the issue. If ownership of the vessels, and most of the infrastructure, are in the same place, that helps with that programme, because it is good to tie in the facilities for the vessels. Also, importantly, facilities for customers, accessibility, passenger access systems and so on need to be thought through in the same way, so that everything works together seamlessly on a route by route basis. That is the logical way to do it.We frequently meet our council counterparts and manage projects together, so it is not for want of trying, but different organisations sometimes run at different bases or have different budgetary pressures.09:30

Lloyd Melville SNP Angus South
link

As you said, there are significant budgetary pressures on local authorities, particularly on the capital side. Is it your view that local authorities are not equipped to do the scale of work that is required?

Duncan Mackison CalMac Ferries
link

In general terms, our observation is that local authorities are under pressure. We specialise collectively in this area, and we have the scale, systems and processes to understand these things. It is not for want of trying, but that work is not commonplace for councils and they are not doing it all the time.

Kevin Hobbs Caledonian Maritime Assets Limited
link

I would back up what Duncan Mackison said. If you started with a clean sheet, you would not have so many ports owned by different entities. The ports are owned by three councils and four trust ports, and, on Canna, the National Trust for Scotland.I will give you one of the best examples, which is that we decided to build two new vessels for the Little Minch route, which connects Uig, Lochmaddy, and Tarbert on Harris. That requires preparing the ports and building the ships. We own Tarbert port on Harris, the Western Isles Council owns Lochmaddy port and Highland Council owns Uig port. As you can imagine, it is really tricky to triangulate everybody to act in unison. CMAL is not a bunch of kleptomaniacs, but, at the end of the day, my firm view is that if we could have more control over more ports, an awful lot of these projects would be a lot easier to deliver. The cost of doing it is the cost of doing it, but it is really tricky to reach out to all those different organisations. It also takes time, and, in some instances, we do not have that much time.

Lloyd Melville SNP Angus South
link

Do you think that that is the Government’s direction of travel?

Kevin Hobbs Caledonian Maritime Assets Limited
link

That is what I am trying to promote with the Government.

Lloyd Melville SNP Angus South
link

We will perhaps find out when Government representatives are here later.

Kevin Hobbs Caledonian Maritime Assets Limited
link

You had better ask the cabinet secretary in the next evidence session.

Kevin Hobbs Caledonian Maritime Assets Limited
link

We have ongoing relationships with all the ports, including the council ports. One private port was involved, which was Ardrossan, but that is out of the equation now. Generally, though, I believe that if CMAL had more ports, the investments would be a lot smoother.

Lloyd Melville SNP Angus South
link

Does anyone else have any pressing views on that? Calum Mackenzie, do you have a view on the ownership issue?

Calum Mackenzie Scottish Collaboration of Transport Specialists
link

Collectively, we are all looking for the same thing, which is a more resilient and reliable transport network. From a local authority perspective, I would suggest that we look a bit wider than just the ferry or freight routes, because there is industry connected to some harbours.Going back to the paper from CalMac, it is important that we look at the transport network holistically. We need to look at how roads connect to ports. Are the ports in the right place? What is the economic benefit to each community? Is it fishing or industry? How do we link up with rail and buses?Local authorities have a huge part to play from the economic and the local, place-based perspectives, and for the wider strategic view of transportation in Scotland. For me, port ownership is not a big issue as long as there is collaboration and input by all those involved, and as long as the economic benefit of ports is considered. From a local authority perspective, we see the benefits of having a partner that is experienced in the delivery of vessels and port infrastructure, but I do not see those benefits as excluding the benefits of having local authority input into that process.

Richard Ballantyne British Ports Association
link

It will not surprise you to know that, given that we represent the full spectrum of ports across Scotland, we are aware that there is quite a mixed view on the issue. It is a case of horses for courses, really. For example, some of the smaller ports rely on or even need the support of CMAL to lead a lot of the projects that they are involved in. Some of the larger trust ports and independent ports have enjoyed working collaboratively with CMAL and the Scottish Government, but would probably want to project manage things and lead things themselves, based on their sense of what works for their community.I would just add that the issue involves more than just the infrastructure development cost, and we are thinking in wider terms about issues such as planning. CMAL has great experience of navigating some quite complex systems involving various stakeholders and so on. I will put on the record the fact that Transport Scotland is very good on harbour orders—indeed, I would say that, because of its understanding of those, it is market leading across the UK in terms of the time that it takes to get harbour orders through. In England, we have real problems at the moment with backlogs of harbour orders, Wales is struggling with its new system and there is a different arrangement in Northern Ireland—so, hats off to Transport Scotland.There are issues around marine licences, which involves the marine directorate, and other things relating to the habitats regulations. The systems that are in place in those areas are good, but they can sometimes act as blockers that delay projects. Any help that CMAL can give operators, particularly smaller ones, in navigating those challenges would be welcome.There would be a particularly big plus if CMAL could help with accessing funding, because it is funded by the Scottish Government and there has got to be a lot of merit in its getting involved in that regard. An excellent recent example of that concerns the approach to the port of Ullapool, which combined Transport Scotland funding, Highlands and Islands Enterprise funding and money from the port operators. If any of you have been to Ullapool in the last couple of years, you will know that the result of the project is wonderful. The approach is much safer and more fluid, and there is even a promenade. That is an excellent development, and, if the committee wants to go and visit that port collectively, I am sure—

Jacqueline McDonell Mallaig Harbour Authority
link

It is important to recognise that what Kevin Hobbs is talking about is the ferry infrastructure. CMAL would not want to be involved in all the fishing industry stuff and so on that we, as a trust port, might be doing. It is not that CMAL is making a grab for everything, but I think that there is definitely a role for CMAL to play in terms of the ferry infrastructure.

Graham Simpson Reform Central Scot and Lothians West
link

My wife and I were in Ullapool in the summer, and we got the ferry from there. It is wonderful. It has always been wonderful and it always will be.Calum Mackenzie, you mentioned that you think that there should be a nationwide review of ports. Who do you think should carry that out?

Calum Mackenzie Scottish Collaboration of Transport Specialists
link

A number of agencies could contribute to it. The regional transport partnerships can input with regard to the regional transport needs, and SCOTS, which I am representing today, and the Convention of Scottish Local Authorities would be happy to have an input, too.The review could be led by Transport Scotland, but I think that what is important would be drawing in all the collaborative knowledge and experience that is out there just now—the knowledge of what is working and what is not working.I would go back to CalMac’s submission and ask whether the ports are in the right places. Right now, the vessel movements predominantly involve freight, passenger transport and tourism. Looking to the future, will those figures be changing? Is there a more efficient way that these services could be delivered? Over the next five years, there will be a huge amount of investment in major renewable developments affecting the Highlands and the islands. We need to understand the impact of that, although it will take place over a short period, and we must also ask what will happen after that period.There is a lot happening. We need a review of what is there now and what will happen in the future over the short and longer term. Indeed, we also need to consider where the fixed links fit into future investment. Transport Scotland is a central agency on that but pulling in information collaboratively from all the other sources that I mentioned could be a way forward.

Lloyd Melville SNP Angus South
link

You will be aware that the Scottish Government’s budget is coming up on 3 December. Given the scale of investment that is required, particularly in some of the fragile ports, how best should the Government address that? What scale of investment might be required in the upcoming budget to make a good start?

Jacqueline McDonell Mallaig Harbour Authority
link

As Calum Mackenzie indicated, these things take time. The first stage is putting marine licences and harbour revision orders in place; you do not have to spend any capital money immediately because a lot of work needs to be done before that. If we started in Mallaig tomorrow, we would be talking three or four years because we would have to do marine monitoring to see what species are around and produce a detailed design. You are not talking about immediate capital spend as soon as you start, so it would be good to start moving.

Lloyd Melville SNP Angus South
link

There are preliminary steps that you would like to be done.

Jacqueline McDonell Mallaig Harbour Authority
link

Yes, there are preliminary steps that need to be done.

Duncan Mackison CalMac Ferries
link

As Kevin Hobbs said, none of those pieces of infrastructure are short-term projects. One of our projects lasts as long as a parliamentary session. Some of them take significantly longer. Therefore, it would be terrific if the Parliament and Scottish Government could find their way to an assumption about a rolling investment programme—we leaned towards that in our submission—because affordability is about not just what is under your nose but the commitment to keep investing. In some circumstances, we have got into the problems that we have had in recent years because investment has been delayed or attention has been taken elsewhere.On your point about how much investment is needed, we either have or do not have our lifeline ferry routes. They have to be safe and must exist because they serve communities that have to be sustained. Therefore, the question “Could you not do it?” is not appropriate. That is not a criticism. It is just that there needs to be a prioritised list in the long term, even if the money is not available to fund all of it.

Lloyd Melville SNP Angus South
link

The point is that the later you spend, the more you spend.

Duncan Mackison CalMac Ferries
link

One hundred per cent.

Lloyd Melville SNP Angus South
link

I would support a rolling plan. A national plan for ports and harbours would make a lot of sense. However, if the need for investment is critical, the Government should pay attention to it.

Kevin Hobbs Caledonian Maritime Assets Limited
link

Any port project of scale is about a five-year process so, as Duncan Mackison says, it is about the length of a parliamentary session. I have said for the close to 11 years that I have been at CMAL that it would be really good if ferries were not treated as a political football, which they genuinely are.We would like there to be a minimum investment. If you look across our portfolio of ferries, you will see that, in effect, every three years we need to build two big ones and two small ones. At today’s prices, that is £200 million at least. It can be more, because the northern isles vessels are approaching £100 million each, and it will be even more again when it comes to replacing the overnight ones. That gives you the sort of scale that you need. On ferries alone, you are looking at a minimum of £70 million or £80 million a year. That will increase every year as well, because the inflation rate in the market for vessels at the moment is far in excess of the consumer prices index or the retail prices index.09:45As far as the ports are concerned, speaking generally, if I were asked for a number, I would say that we would need about £100 million per year, and that would be purely for the CMAL-owned ones. We have the most complicated ones. A lot of ours have linkspans, whereas the council ports tend to have a lot more slipways, for instance. Highland Council has got Eigg, which is complicated, but it also has five ports that have slipways, and the Western Isles Council has Lochmaddy, which is also complicated.

Lloyd Melville SNP Angus South
link

So, the actual figure required could be many hundreds of millions.

Kevin Hobbs Caledonian Maritime Assets Limited
link

I do not think so. It is difficult to say, but initially the funding would have to be doubled if the councils owned all of the ports. We own 51 per cent of them, effectively, so the funding would have to be doubled. However, ferries should last 30 years, but in the current environment, when a new port is built there is no reason that it cannot last for 60 years. Therefore, I think that somewhere between £150 and £200 million per year would be needed for ports.

Willie Rennie LD The Convener · Fife North East
link

You mean council ports and CMAL ones.

Kevin Hobbs Caledonian Maritime Assets Limited
link

Yes. The funding required for CMAL ports alone would be about £100 million.

Richard Ballantyne British Ports Association
link

I do not have a definite figure. The caveat to all of this is that while there are different drivers and motivators and timescales at each port, all types of port—whether they are owned privately, by a local authority, CMAL or a trust—will be able to sufficiently fund certain developments, and we are expected to fund them using harbour income and dues et cetera. That keeps the market competitive and keeps a level playing field. However, where there is an overriding public interest, which could relate to energy, infrastructure, lifeline ferry services or fishing, we accept that there is a place for public subsidy. That is my heavily caveated point.Kevin Hobbs mentioned the northern routes where new services and ports have come in, some of which are part of the CMAL portfolio. We are going to have to respond to that and consider what Kevin Hobbs’s team and Scottish policy makers want for ferries in the future. For example, they will need to consider what fuels ferries will use or whether they will need to be plugged in. It is expensive for ports to respond to the need for infrastructure of that sort. Where they might not be able to accommodate that or cover it through their commercial operations, we would expect funding from the Scottish Government.This is a general thing to say ahead of the budget, but there is an important point to be made about politicising operations nationally and locally. Different councillors from different local authorities come in with different aspirations. Giving ports long-term assurance about what they need to spend money on, how much they need to spend, when they need to spend it and what the picture will look like is important.

Lloyd Melville SNP Angus South
link

It comes back to the longer-term national plan approach. Do you support that?

Richard Ballantyne British Ports Association
link

In principle, we would definitely welcome Calum Mackenzie's suggestion to have such a plan. However, I would need to see the remit, and I warn against carrying out an overly bloated exercise. We would not like Transport Scotland to be pulling too many resources away. We do not want to take officials away from the good work that they do on harbour audits, for example. However, a plan might be useful to highlight what we need and what we are doing. That applies not only to funding, but also to licensing, permits, consent and taking into account what communities want. It is also always good to have a master plan.

Lloyd Melville SNP Angus South
link

It would also give us more clarity about the quantum of investment that is needed, if we knew the condition of all of the ports.I will let Calum Mackenzie come in, as I am conscious of time.

Calum Mackenzie Scottish Collaboration of Transport Specialists
link

It is difficult to come up with a figure, but I think that we should consider a priority. We tend to know which ports we would like to look at first. If we can work with Transport Scotland and the other agencies to, ideally, get a full picture, we can then do the work in steps and consider what the major concerns will be during the next five years, then prioritise work on the key ferry ports and infrastructure. After that, we can keep that planning going to create 10, 15 or 20-year plans.Again, we do not have all of those answers just now. It is the critical bit of work that we need to do, so that we can come back to you and say, “Okay, this is our priority just now. These are the key weaknesses in the infrastructure, and these are the areas we want to prioritise.”

Kevin Hobbs Caledonian Maritime Assets Limited
link

I just want to jump in and say that we pretty much know what will be needed in the next 20 years across all of the ports, because of our interactions with every port owner, whether it be a trust or a council. It would take me several hours, but I could run through each of the 53 and tell you exactly what needs to be done.

Kevin Hobbs Caledonian Maritime Assets Limited
link

I know, I know.

Willie Rennie LD The Convener · Fife North East
link

I think that Richard wants to come in, too.

Richard Ballantyne British Ports Association
link

I would like some clarity as to whether this would be a plan just for Scotland's ferry network and the ports that serve it, or whether it would be a wider ports plan covering everything from offshore energy to fishing et cetera.Moreover—and I hope that this does not make Kevin Hobbs shudder or put him in a stressful position—we also should think about the new services that could be introduced in the future. After all, there are ports that would like to explore new routes, and some of them will not be part of the CMAL network. Such plans might be made maybe not today, but in the future, and it would be interesting to know what would be feasible.

Martyn Day SNP Falkirk East and Linlithgow
link

I will start with Duncan Mackison. I have to say that I am fairly new to the issue of ferries, but I am aware that CalMac is calling for ferry and port upgrades to be planned as a single package. Why has that not happened so far? What are the barriers in that respect?

Duncan Mackison CalMac Ferries
link

In recent years, most of the collective attention of all those who are interested in ferries in Scotland has probably been focused on legacy issues, old vessels and things not working. As a result, there has been a collective lack of looking at things in the round or looking forward in a positive way. I would like to think that, now that we are starting to get some new vessels—indeed, we were delighted to get one last night—that will create a space for those discussions to happen.Going back to the theme that we have just touched on, that sense of looking across the network as a whole is probably more pertinent now from a connected transport perspective. For example, I am interested in the interconnector project that is going through Stornoway, and the fact that Scottish and Southern Electricity Networks will be using a freight ship of its own, and that that freight will be coming from different places such as Aberdeen or other ports.That raises a question not just about point-to-point solutions, but about what those points should be, and whether there are more strategic ways of looking at freight flow around the west coast of Scotland—and possibly the north-east of Scotland, too—and linking choices being made on ferries infrastructure and locations with other parts of the same system, such as roads. We offload a lot of freight that then finds its way over the Rest and Be Thankful, for example, and other such places. There was a time when freight and sea routes on the west coast of Scotland were different from those that we have now, and I think that we have been locked into a process of looking at point-to-point routes and the conditions of the existing system, instead of trying to find a bit of space to look at the system as a whole before we make choices. For a long time, we have just been fixing things instead of taking that wider view, and that has caused the issue.

Martyn Day SNP Falkirk East and Linlithgow
link

Kevin, what are your thoughts on that?

Kevin Hobbs Caledonian Maritime Assets Limited
link

The passenger experience would be enhanced if there was more joined-up thinking. Obviously, because we and CalMac are 100 per cent owned by the Government, we work extremely closely together, and I do not think that there is any disconnect in that respect. However, I would say that, from a passenger perspective, there needs to be a really good look at the road network going to ports, the bus and train services that take people to and from ports and all that sort of stuff, because it does not always work very well. It is not really seamless, and it would be very good if it became seamless.New routes have been mentioned. To be brutally honest, I am not sure that any new routes will be affordable in the coming budget or future budgets, but maintaining the existing routes and doing the best that we possibly can with them is an absolute priority. The delivery of ports and ferry services is not fragmented or disconnected, but we need a holistic approach to all the modes of transport to make it a lot better than it is today.

Richard Ballantyne British Ports Association
link

In relation to wider transport connectivity, any port that is engaged in any activity is only as good as its last mile and its hinterland connections. In Scotland, that is particularly pertinent for roads. We like road spending, so if the budget includes capital or maintenance funding for roads, that will be helpful, because we want to create a smooth and efficient flow of goods and passengers to our ports. That will also help with transport connections and attract inward investment, because offshore energy installations and ferry infrastructure are all parts of a package.I fully support the joining up of that process, but I understand the pressures on national and local authority budgets. We particularly want local councils to be given more money to spend on all the good services, including on protecting and maintaining local authority-owned ports. It is a question of money, which is difficult in this age but, if we have that spending, it will bring economic benefits, both nationally and regionally. It is worth bearing in mind the value that that can create.

Martyn Day SNP Falkirk East and Linlithgow
link

There are roads to all our ports, but how many ports have rail connections? How well are they integrated?

Richard Ballantyne British Ports Association
link

I am not sure about passenger services, but there are intermodal freight services to places such as Grangemouth and Greenock. Those are busy—sometimes busier than the ports—with regard to container activity. The sector has an aspiration to see more rail freight nationally, but our geography and economy mean that it is often cheaper and more efficient to use lorries. Road transport is king across our diverse network of regions.

Martyn Day SNP Falkirk East and Linlithgow
link

I will come back to the issue of rail freight in a wee while, because it is one of my pet subjects.My next question is about climate change and the increasing incidence of severe weather events. What impact is that having on ports and harbours and what does that mean for maintenance and upgrades? I put that question to Jacqueline McDonell first.

Jacqueline McDonell Mallaig Harbour Authority
link

I can give one example. In 2019, we built a passenger access pontoon for the ferry to Knoydart. It was built to a standard designed to deal with a once in 100 years storm but, since I came into post in 2019, we have seen that passenger pontoon sitting above the height of the pier at least six times. That means that what we expected to happen once in 100 years has happened six times in the past six years.Our existing ferry infrastructure is still being maintained and it is fine, but there are issues when we are building new infrastructure. When we got a marine licence for a smaller project, we were asked to build the new quay a metre higher than the existing quays, because of the potential impact of flooding. That causes issues, because we end up with stepped infrastructure—we are steadily going up the way, and it is difficult to join into the existing infrastructure. However, we all recognise the issue. As the infrastructure ages, we must take steps to future proof—everything is about future proofing.

Martyn Day SNP Falkirk East and Linlithgow
link

What is that likely to cost?

Jacqueline McDonell Mallaig Harbour Authority
link

That is incorporated in the cost if we are building new infrastructure, but it would add to the cost of renovating existing infrastructure. In Mallaig, we hope to build new infrastructure, so there would not be an additional cost.

Martyn Day SNP Falkirk East and Linlithgow
link

Do you have any thoughts, Calum?10:00

Calum Mackenzie Scottish Collaboration of Transport Specialists
link

As has been said, it is important to take a holistic approach to transport and the routes taken. You mentioned climate change, and, although one of the predictions is a sea level rise and we can design and build to that, one of my main concerns, being on an island in the Western Isles, is that the frequency of storm events is likely to triple. Potentially, that means three times more disruption to services, so it is important that the infrastructure is resilient enough for vessels to berth and push themselves off the berth in high winds. That is a concern, and we need to work with CMAL and CalMac to ensure that the new vessels that are being procured and put on to the infrastructure are capable of operating in more severe weather conditions. That is more a technical question for CalMac to answer.The road networks that lead to the piers and harbours are fundamental to the whole transport route. We might find that there are increasing restrictions on some of those routes due to flooding. The road from Ullapool to Inverness is reasonably good. The one restriction in Ullapool is the amount of storage or laydown space, which might impact major developments. Part of the road through Skye is a trunk road that can become very busy during the tourist season, which can impact on freight.A holistic approach to the whole transport route and network is fundamental. SCOTS can help in that regard because, through that group, we have a very good handle on roads asset management costs. That could be overlaid on infrastructure requirements for the ferry network, and for piers and harbours. There is a good bit of background work on roads and roads investment, and it might be useful to overlay that on the work on ports and harbours.

Kevin Hobbs Caledonian Maritime Assets Limited
link

There are two elements to consider. On ports, when we build new ports, we take climate change into account. We can look at Lochaline and the ongoing redevelopment at Cumbrae as examples, because we have built those between 1m and 1.5m higher as a climate change adaptation. When we do a new project, first and foremost, using the information that we have, we ensure that it is future proof because, as I said, such investments should last for about 60 years. As Jacqueline McDonell said, storm frequency is getting higher and higher, which is problematic.The ferries that we are building are a lot more agile and powerful than the ones that we have built before. However, I must say—Duncan Mackison might want to come in on this—that there comes a time when no master mariner will go to sea, no matter how good the ship is. If you take passengers out in force 9 or 10 winds, you will have casualties all over the place. You can build in some form of investment to protect things at the margins but, ultimately, undeniably, there is no way that you can design out severe storm events. In those cases, you simply would not go to sea, because it would just be too dangerous—it is as simple as that.

Willie Rennie LD The Convener · Fife North East
link

Martyn, I am conscious of the time and you still have a few questions.

Martyn Day SNP Falkirk East and Linlithgow
link

Thank you. Duncan, do you want to add anything?

Duncan Mackison CalMac Ferries
link

There are lots of experts in weather out there. As Kevin Hobbs alluded to, with weather changes, the decisions that masters make under certain circumstances are a lot more visible, which puts a sometimes quite public and pointed pressure on them as individuals. We have to take care with that and ensure that masters are in a position to make those decisions.On infrastructure, clearly a lot of ports and harbours are located where they are because they have traditionally been in the lee of the wind. The wind has changed direction in some places, wind strength has increased and weather conditions have become more severe, so it has become harder over time to get in and out of some of those harbours, even though some vessels are getting much more powerful and manoeuvrable.We are starting to notice, too, the need for ports of refuge and the frequency with which we are having to use them. Some vessels might not be able to stay on their route and might have to go somewhere else. Therefore, the questions of how soon the vessel can depart from where it is to go to its port of refuge, as well as which port of refuge it is able to go to, come under scrutiny. Resilience in relation to network design and ports is not only about the routes but about where vessels might need to go under certain circumstances, which we are seeing more frequently.

Martyn Day SNP Falkirk East and Linlithgow
link

I am mindful of time, so I will move to the next question. I will stay with you, Duncan. What are your organisations doing to improve the physical accessibility of port and harbour facilities? What can be done to improve that, particularly for disabled passengers?

Duncan Mackison CalMac Ferries
link

As an organisation, we work with several accessibility forums and we are keen to expose ourselves to ideas and input on that matter. We find that simply moving around in ports and on vessels is getting more complicated in certain places—cars are getting bigger but lanes are getting narrower, and it is therefore harder for people to get in and out of cars. As the population gets older, we rely on lifts more and fewer people can use stairs. From a health and safety perspective, there has been a rise in slips, trips and falls, and various other accessibility issues.However, we are open to improving the infrastructure that we have. We need to know about, and design, accessibility from the start when choices are made about future vessels, infrastructure and services, and we try to do that with new facilities.

Martyn Day SNP Falkirk East and Linlithgow
link

When you look at those factors, are disabled passengers involved in testing whole-journey routes?

Duncan Mackison CalMac Ferries
link

Yes. We work with representative organisations to look at the matter. However, it is a known challenge where we have older infrastructure.

Kevin Hobbs Caledonian Maritime Assets Limited
link

Four or five years ago, we started putting in changing places toilets in the new terminal buildings that we are building for all the larger routes, and we have rolled them out to the ships as well, so we now not only have male, female and accessible toilets but changing places toilets.As Duncan Mackison said, we are joined up with several local and national accessibility panels and we are building in what we can. That is happening for all our infrastructure. It probably does not make it absolutely perfect, but there have been a lot of investment and enhancements in the ships and ashore to accommodate that sort of thing.

Willie Rennie LD The Convener · Fife North East
link

Martyn, I will allow you to come back later with questions on freight. Do you have any more accessibility questions?

Willie Rennie LD The Convener · Fife North East
link

Thank you very much for your understanding, Martyn.Why is the MV Glen Sannox not in an area that has access to liquefied natural gas?

Duncan Mackison CalMac Ferries
link

The Glen Sannox has been used as a resilience vessel over the summer and that was purely as a result of our deploying vessels where we had need. No LNG is available in most of the places, so we have operated the vessel on marine gas oil—which is diesel—to enable her to fulfil the need and the use that we have to put her towards on the network. Although that was not the initial intention when she was commissioned all those years ago, it worked successfully over the summer.

Willie Rennie LD The Convener · Fife North East
link

It is the most expensive ferry in the fleet and it has a modern design with dual fuel, but it is being used as a back-up vessel without LNG. Did the ministers have any view about your decision to move it to an area where it is not using LNG?

Duncan Mackison CalMac Ferries
link

I do not know the answer to that. We made the decision based on operations at the time and where we needed to send a vessel to maintain services. That was the basis on which the choice was made to redeploy her.

Willie Rennie LD The Convener · Fife North East
link

The fleet has been ageing for some time. You must have known that there was a potential need for back-up vessels in the northern area. Did you feed in to ministers at the time that running it dual fuelled might be a waste of money?

Duncan Mackison CalMac Ferries
link

That predates my time in this role. When the vessel was commissioned, there was not a set of circumstances with the scale of disruption that we had at the start of this year and in the spring. The organisation did not face breakdowns on the same scale.

Willie Rennie LD The Convener · Fife North East
link

We knew that the fleet was getting really old—I mean, Maggie Thatcher got most of the ships.

Duncan Mackison CalMac Ferries
link

There was an intention back then that more of the fleet would have been replaced by the time the Glen Sannox came into the system. There was an assumption that the Glen Sannox would operate in Arran and that that would be where she would stay. It transpired that, operationally, that was not the best thing for us to use her for.

Willie Rennie LD The Convener · Fife North East
link

There are the issues around Ardrossan. However, until the vessel was moved, the use of Glen Sannox involved tankering up the LNG from 500 miles away down south each time, because we do not have the capability up here. Why did that happen? I know that there were issues about the ownership of Ardrossan and the investment that was required there. Surely, that is an example of where construction of the ferries and investment in the harbours were not aligned. Is that likely to happen again? Do you foresee it happening? Talk me through the issues. Kevin Hobbs is probably more able to do so.

Duncan Mackison CalMac Ferries
link

I am sure that Kevin Hobbs will come in in a minute. As I understand it, way back when the Glen Sannox and the Glen Rosa were commissioned, the intention was that there would be an LNG facility, possibly at Grangemouth, which would act as a hub, and the vessels’ use of LNG would build the LNG network in Scotland. That did not transpire, so by the time the vessels came along, the only way for them to be refuelled with LNG was by tankering it up.

Kevin Hobbs Caledonian Maritime Assets Limited
link

Duncan Mackison has explained it relatively well. The decisions go back to 2012 and 2013—they predate me, and I have been at CMAL for nearly 11 years, so it was a long time ago. To be frank, nobody really thought that building the vessels would take nine and 11 years and counting.At the time that that decision was made, LNG was seen as a fuel of the future. There has been talk about whether it is—it is not as popular now as it was at the time. As Duncan said, when the decision was made, the only place that could load out a tanker was in Kent, and that was known at the time. However, there were three potential consenting processes in Scotland—one on the west coast and two on the east coast—that would have given us a tankering hub in Scotland. That never transpired. LNG facilities cost billions—they are a huge investment. We spend enough money already, and LNG facilities cost many billions of pounds. Unfortunately, that never happened and, if you want LNG, there is only one place in the UK where you can load out a tanker, which is in the Isle of Grain. That is a fact.

Willie Rennie LD The Convener · Fife North East
link

On top of all the problems that we have rehearsed many times with the Glen Sannox and the Glen Rosa, that is just the ultimate farce, is it not? We are now not using the newly designed LNG dual-fuel systems on the two vessels because one is going up north and there is no local facility for the other one. Was making that decision not a gamble at the time?10:15

Kevin Hobbs Caledonian Maritime Assets Limited
link

I cannot speak for people who were involved at the time, to be honest with you, but I really do not think that it is a farce. It is important to understand that dual-fuel systems have merit but that, as things stand, given all the toxic shocks that have happened over recent years—Ukraine and Iran recently, and going back to the tsunami that affected Fukushima back in the day—the price of LNG has escalated beyond anything that anybody could have ever imagined. It is hugely expensive at the moment. Having owned part of a ferry company back in the 1990s, my opinion is that there is no way that, even if you had a dual-fuel vessel, you would use fuel that is two or three times the price of MGO.

Duncan Mackison CalMac Ferries
link

Another point that is perhaps worth making is that, although the new Islay-class vessels from Turkey use MGO, they are much more fuel efficient than the MGO vessels that they are replacing, which means that, on certain runs, we will see a significant reduction in fuel consumption—it will be perhaps 30 to 40 per cent less. The technology in those sorts of engines improved significantly after the decisions on LNG were made.

Willie Rennie LD The Convener · Fife North East
link

Will the Glen Rosa definitely use LNG?

Kevin Hobbs Caledonian Maritime Assets Limited
link

It is being trialled for LNG, yes.

Willie Rennie LD The Convener · Fife North East
link

Given what Kevin Hobbs said about the price, will it definitely be used? Is there any doubt about that?

Duncan Mackison CalMac Ferries
link

There is a question mark, in that that decision will basically hinge on the investment case for installing LNG facilities in the place where the vessel will run from.

Willie Rennie LD The Convener · Fife North East
link

So, it will depend to a degree on whether the facilities are installed, and also on the price. Is it the case that, if the price is too high, you might not use it?

Kevin Hobbs Caledonian Maritime Assets Limited
link

Yes.

Willie Rennie LD The Convener · Fife North East
link

Okay. That is relatively new information. I do not think that many people know that we might not actually use LNG from now on. That is significant.

Richard Ballantyne British Ports Association
link

I can add something on the national context. Kevin Hobbs said that he was not around back then, but I was, although I stress that I was not involved in any decisions on procurement and so on.The ports industry has really struggled to get clear sight from the wider shipping industry about what it wants from ports in terms of fuel provision. The future fuels initiative has been around for about 30 years, and back then there were lots of plans at national level around exploring what the shipping industry wanted and what provision would be available at ports.That is a very fast-moving target. The wider shipping industry is not one collective, and it does not make uniform choices. Therefore, it is quite difficult for ports and others to predict what will happen with fuels in the medium and long term. As Duncan Mackison suggested, global trends on fuel prices completely skew certain considerations. We have seen shore power facilities built in good faith that are not being used because the shipping industry still finds it cheaper to burn diesel fuel. We cannot tell the customer what to do, so it is a very difficult thing for ports to respond to.

Willie Rennie LD The Convener · Fife North East
link

I want to quickly ask Duncan Mackison about Cumbrae, because we have heard quite significant complaints from the community there about the change to the timetable, which has led to two-and-a-half-hour delays, and quite significant complaints from the business community. What are you doing to change that?

Duncan Mackison CalMac Ferries
link

We made the changes to the Cumbrae timetable primarily due to safety issues. Across the network—

Willie Rennie LD The Convener · Fife North East
link

I know why it happened. I want to know what you will do to fix it.

Duncan Mackison CalMac Ferries
link

We are discussing with the local community what the future timetable will look like. We have made some adjustments to it, which would reduce the turnaround times from 10 minutes to seven minutes at either end of the day, and we have already increased the length of the summer timetable, which affects the length of time that there are two vessels on the route. We think that, in combination, those measures represent a good adjustment, and the results of the survey that came out showed that that was recognised and appreciated. That is what we have done, but what we cannot do is roll back on the issue of simultaneous operations—that is, having people and vehicles on a ramp at the same time, which, as you know, was the reason for the changes.

Willie Rennie LD The Convener · Fife North East
link

Another issue is the lack of co-ordination when the MV Loch Shira underwent planned maintenance. That resulted in considerable delays of up to three and a half hours. I understand, however, that although the maintenance finished at 5 o’clock, the crew went home and there were no welfare facilities for passengers, who were left waiting for an excessive amount of time. Why did that lack of co-ordination happen?

Duncan Mackison CalMac Ferries
link

That was a mistake on our part, to which I have publicly admitted.

Willie Rennie LD The Convener · Fife North East
link

So, that will not happen again.

Duncan Mackison CalMac Ferries
link

No. We should have allocated a second crew, which is what we had told the local community, but, because of an internal issue, that did not happen. That was why the situation arose—for which we are apologising.

Willie Rennie LD The Convener · Fife North East
link

Thank you.The final issue is about communication. The local ferry committee and the community council feel that you make decisions and simply tell people about them, rather than consulting and engaging with them. Do you recognise that? If so, what will you do to fix the situation?

Duncan Mackison CalMac Ferries
link

I do not recognise that. In the run-up to the current discussions, we have had six meetings with the local community council, so we feel as though we are having that engagement. The issue is one of disagreement on the solution and the timetable, rather than the communication, in my view.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

I apologise to everybody for being late: I had other parliamentary business. I am sorry if anything that I ask about has already been covered.I would like to start with CalMac’s written submission, and with you, Duncan. It makes very good reading. I think that your aspirations and where you would like to be are what islanders want to see happen. As I assume you would acknowledge, however, that is not happening. What is going wrong just now? What needs to be done to make things better and to realise the ambition that you have set out in your written submission?

Duncan Mackison CalMac Ferries
link

Most of the issues that we have at the moment are a direct function of disruption or breakdowns and the vessel deployment that we have. In spring, we had 10 vessels out of commission at one point, which was a very testing set of circumstances. By contrast, over the summer, we had a resilience vessel, and things were very much more settled. The contentment in the communities was excellent over the summer; not so much in the past month or so. The statistics bear it out: satisfaction was good over the summer.Looking ahead to winter and into next year, as we get four new vessels into service, we should see some stability returning to the communities and to our service. For me, most of that is about the vessels and the disruption that we have suffered as a result of having an older fleet.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

I think that everybody recognises the situation with vessels’ unreliability and breakdowns. I will come to that later in my questioning. What I was hoping to get at is more about the circumstances that have led us to where we are just now. I am thinking more about structures and relationships. We are talking about the interaction between ferries and ports, and with CMAL as well. Indeed, I will perhaps

come to Kevin Hobbs next.First, however, what is it in those relationships, in the planning that goes on and in interactions with Government that have led us to where we are? What do we need to do differently to get out of the present situation and to realise your ambition?

Duncan Mackison CalMac Ferries
link

It is not perfect. We have put a lot of effort and resource into community engagement and linkages. We are doing more of that than we have ever done. We have introduced area managers and deputy area managers, and we are focused on communications—which is sometimes difficult, because of the nature of the issues that we deal with. Ultimately, once there is a stable service and the right resources are reliably in the right place, much of that will just settle. That is what we are seeing.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

Kevin Hobbs, do you have anything to add, particularly on the relationship between the players—such as you, CalMac and the Government—and the perception of what islanders want from ferry services and what they expect to receive?

Kevin Hobbs Caledonian Maritime Assets Limited
link

What islanders want is certainty, reliability and resilience. The core issue here is that there has been underinvestment for many years. That is not a political issue. Since the turn of the century, there simply has not been enough investment. We have accelerated investment in the past few years. However, you were not here earlier when I said that a port project, from inception to delivery, takes five years. It is more or less the same for a major vessel and a bit less for a smaller vessel—maybe four years. These are long-term plays. There has been a lot of investment, but, for various reasons, it has not really come to fruition so far.We took delivery of the MV Loch Indaal—the second of the four new ferries from Turkey—last night at quarter to 6 UK time and quarter to 9 in Turkey. Despite what people might think, the interaction between CalMac, CMAL and Transport Scotland is good. We sat down as a tripartite for seven hours yesterday. That relationship works pretty well, but you will not see a tangible change, realistically, until we get all six major vessels in and, next year, start receiving the first of the seven vessels that are being built in Poland. We will leave the northern isles to one side for a minute, because we are talking about the Western Isles. Those new ferries will be a game changer. Six brand-new major ferries and seven smaller ones, and more in the pipeline, will mean that the average age of the fleet is reducing. Further, the performance and resilience should be much better than it has been.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

The CalMac written response picks up on the interaction between vessels and ports, and—as you touched on, Kevin—the five-year timeline for the project to be realised. I turn to three interconnected projects: the replacement of the MV Lord of the Isles, the infrastructure upgrade at Gasay and the vessel that will serve Mallaig in future. The last of those is relevant to you, Jacqueline McDonell.How are those projects progressing? How confident are you that they are progressing in tandem, and that the vessel procurement process and the port infrastructure projects at Gasay and Lochboisdale are moving at the right pace? Will the new ferry and the new pier be delivered at the same time, providing the islanders of South Uist with the service that they need?

Kevin Hobbs Caledonian Maritime Assets Limited
link

There are three component parts, the first of which is the vessel. On 30 November, we will receive bids from the shipyards that we invited to tender, and it is our hope that we will have wet ink on a contract for a vessel before the end of this financial year—in other words, prior to 31 March 2027. I cannot prejudge where the vessel will be built, and some places build quicker than others, but let us just say that it is a three to three and a half-year process to build the ship.The Gasay facility will be built in tandem with that. We have done all the ground investigation for the facility—obviously, it will need to get consent—and we are on to the detailed design. Currently, the disconnect is Mallaig. Again, you missed me saying this, but we have set off on a project that we need to formalise to get the right facilities into Mallaig. Although the current facilities at Mallaig are not completely optimal, they can take the new vessel. There needs to be investment in Mallaig and a new part of the port needs to be built. Considering the popularity of the route and the number of vessels that are using it and so on, there is a suboptimal solution there. That is not to say that the current vessel for the small isles—the Mallaig-Armadale and Mallaig-Lochboisdale routes—will be impacted.10:30

Donald MacKinnon Lab Na h-Eileanan an Iar
link

Jacqueline McDonell, what has your experience been of the process so far, and what needs to happen to ensure that the project becomes a reality?

Jacqueline McDonell Mallaig Harbour Authority
link

We have been talking with Transport Scotland, CMAL and CalMac throughout. When the project was taken forward to Transport Scotland, one of the options was to do the minimum, which we all considered. We have talked today about future proofing and taking a holistic approach to everything. The minimum option would have addressed the ferry’s immediate infrastructure requirements, but it would not have sorted any of the other issues. It would not have provided a linkspan and a slipway, both of which are necessary.Some of the vessels that operate from Mallaig use a slipway, while others use a linkspan. At the moment, they are all operating from a single linkspan, which constrains the timetable. At the height of the summer season, we can have up to 25 ferry movements a day from Mallaig, so things are a wee bit congested.As I said earlier, all of our issues in Mallaig are positive ones. They come from growth in the communities that we serve, which is an aspiration of this Government. We need to take the leap and spend a lot of money to build the new infrastructure, because that would provide the future proofing that we need, including a new terminal building. The current terminal building is not really fit for purpose.I think that only two routes on the network carry loose freight, and the small isles route is one of them. That freight is growing exponentially year on year, but at the moment it is being managed from two portacabins at the back of the CalMac office, which is absolutely suboptimal. Disruptions really cause issues, because the freight builds up. We do not have enough marshalling space, either.There is a range of issues; it is not simply about the infrastructure for one ferry coming in. As Kevin Hobbs alluded to, we are installing sensors so that we can measure the force that the Lord of the Isles exerts on the fenders. We can then set parameters for the new vessel and know that it can operate safely from the existing infrastructure in the short term while we develop the longer-term project.

Willie Rennie LD The Convener · Fife North East
link

Donald, we are a wee bit short on time.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

I will pick up the pace. How much longer do I have?

Willie Rennie LD The Convener · Fife North East
link

I can give you another three minutes.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

I will rattle through my next question.Duncan Mackison, I picked up on something in your written submission on the impact that vessel breakdown can have on the wider network, which is something that you want to move away from. The thing that probably keeps you up at night is something happening to the MV Loch Seaforth, which is stuck in dry dock for an extended period. That has led to disruption in Lewis, Barra, South Uist, Islay and Mull—the disruption across the whole network has been massive.That must be at the forefront of your mind. How can the development of new vessels and port infrastructure be at the forefront of trying to avoid that in future?

Duncan Mackison CalMac Ferries
link

The point that we were trying to make was that, if you have interchangeable vessels and port infrastructure, you will not get stuck in the position in which one vessel developing an issue with its rudder stock and having to send it away to Denmark means that you then have to move three or four other vessels around, impacting two or three communities as a result, exactly as you describe.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

There was extensive disruption over summer. Disruption on the Sound of Harris started earlier in the year and continued over summer, and the MV Loch Portain is still out of action for a prolonged period. I must say, as I have put on record in Parliament before, the crew on the MV Loch Bhrusda are doing a tremendous job getting passengers across the sound, but it is a totally impractical situation for those communities. That needs to be resolved as soon as possible.That is obviously very closely connected to the small vessel replacement programme phase 2 and the need for new vessels on that route, which I think the committee will take evidence on.

Duncan Mackison CalMac Ferries
link

I was in the engine room of the Loch Portain on Thursday afternoon looking at the issues relating to the coupling device that is being manufactured in Germany. Its delivery has been delayed and it will not be available until January. I recognise that the Bhrusda will be there only for another day or so, after which an alternative route will be put in place. The story of the Loch Portain illustrates the vulnerability of having only one or two vessels that are able to operate on a particular route. That needs to change.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

You have already alluded to the fact that there were more cancellations across the network in April than there were in the whole of 2015. It was a period of intense disruption. I have touched on some of the other disruption that there has been across the network, which continues as we speak.It has been reported in the press that you received a £58,000 pay rise, which took your remuneration to £278,000. Are those figures correct? Do you think that you deserve that level of remuneration, given CalMac’s performance?

Duncan Mackison CalMac Ferries
link

Those figures are not correct in the way that they were produced. There were three numbers involved. One was my basic salary, which increased year on year by the pay increase rate that was the same across the rest of the business. The second figure comes from my pension payment, which was incorrectly lumped into that. My pension payment is paid to me gross because I am in a different system—I am not in the CalMac system—so that number should not have been included. There was another number, which was a retention payment, which the board wanted to give me when I started, for the work to enable the transition to the Clyde and Hebrides ferry services 3 programme and everything that was involved in that. When I came in, the board wanted to ensure that that piece of work was seen through. Those were the three elements.The direct comparator is not correct, but the total figure—including pension—is the right number. It was just quoted in the wrong way.Do I think that I deserve it? That is for our shareholder and the board to form a view on. I think that we are making progress in very difficult circumstances, but it is not my place to comment on that. That is for others to do. We have a shareholder and a board. They are the ones who must take a view on my performance.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

I want to pick up on your point about pension. I did not use the term “salary”; I used the term “remuneration”. I think that your pension contributions are part of the remuneration for your job, as is the other payment. Do you dispute the total figure?

Duncan Mackison CalMac Ferries
link

But they were not included in the figure for the previous year. It changed, because—

Duncan Mackison CalMac Ferries
link

Including pension, that figure is correct. However, when I came back, I did so at very short notice and was there for only six months, so there was a much lower pension.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

So you are disputing the figure for the increase, but not the total remuneration.

Duncan Mackison CalMac Ferries
link

That is correct.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

Thank you for clarifying that.Do you understand why members of island communities might be a bit alarmed to read that and might question your level of remuneration?

Duncan Mackison CalMac Ferries
link

Yes. I have to earn my corn. As I said, ultimately, it is for the board and the shareholder to take a view on that.

Willie Rennie LD The Convener · Fife North East
link

I apologise for cutting you short, Donald.

Graham Simpson Reform Central Scot and Lothians West
link

Jacqueline, I came to see you in August. It was a fantastic trip. I am really glad that I visited, because I did not want to not speak to you. I am pleased that other members have a great interest in Mallaig. It is a fantastic success story, as you have said already. Is the new £100 million breakwater likely to happen? I suppose that Kevin Hobbs could answer that as well.

Jacqueline McDonell Mallaig Harbour Authority
link

I think the answer is that it has to happen. If we are to commit to our rural communities and the people who live in them, it has to happen. As a trust port, we will work with whoever it takes to make it happen. That will probably be CMAL and the other people around this table.

Graham Simpson Reform Central Scot and Lothians West
link

If the breakwater project is to go ahead, it will involve CMAL. Kevin, what is your view on the likelihood of its going ahead?

Kevin Hobbs Caledonian Maritime Assets Limited
link

As Jacqueline said, it has to go ahead, one way or another. As I said to Donald MacKinnon, there is a bit of a disconnect at the moment, but that will not stop the existing ferry services. That investment in Mallaig has to happen. We should bear in mind that four small isles are relying on it happening. Armadale, which is one of our ports, is relying on it happening, as well as Lochboisdale and, in the future, Gasay. Therefore, it absolutely needs to happen.It is also worth mentioning that, although the facility is not life expired, it is not young. We will be working closely with Jacqueline McDonell—I sometimes spend more time with her than I do with my wife—because, ultimately, we need to take a joined-up approach. It will be a five-year project, although the Lord of the Isles replacement will appear before that, and we need a formal plan. In my view, it is not acceptable not to do the project, because, notwithstanding anything else, if we fast forward 10 to 15 years, that single point of failure—Interruption.God, I am sorry—I should have turned my phone off.

Duncan Mackison CalMac Ferries
link

It is your wife calling. Laughter.

Kevin Hobbs Caledonian Maritime Assets Limited
link

I am sorry.If we fast forward 10 to 15 years, the facility will be 60 years old and will need to be replaced anyway. Some of the replacements that we provide are a function of a new ship, but, sometimes, it is purely a case of the facilities basically running out of steam. The facility at Lochboisdale is a typical example of that—it is just too old.

Graham Simpson Reform Central Scot and Lothians West
link

I will move on, because we are short of time.When Alison Irvine was in front of the committee in September, I asked her about the way in which ferries and ports are funded. Kevin Hobbs, when you procure a ferry and get the go-ahead, the Government gives you a loan, which you must pay back, plus the rate of interest. Is that the best way to do things?

Kevin Hobbs Caledonian Maritime Assets Limited
link

Absolutely not.

Graham Simpson Reform Central Scot and Lothians West
link

No, I did not think so. What would be a better system?

Kevin Hobbs Caledonian Maritime Assets Limited
link

It would be better if we got a grant from the capital fund, which is where the money comes from anyway, rather than a loan. With the current situation, we are almost mirroring the situation with a normal ship’s mortgage through a bank. We borrow money, with milestone payments, and everything is wrapped up at the end and we pay back the money, with interest, over 25 years.I will give some numbers. Of course, the numbers change because interest rates change at the point at which we take delivery of a ship. However, at the moment, if we have, say, a £50 million ship—the cost of the ship might become £60 million once everything is wrapped up—and we pay for it over 25 years, with current interest rates, we probably pay back somewhere in the region of another £90 million.

Kevin Hobbs Caledonian Maritime Assets Limited
link

Yes.

Kevin Hobbs Caledonian Maritime Assets Limited
link

We can think about compound interest with a mortgage for a house. If you take out a mortgage for 30 years, you almost always pay more than double the original cost.We are discussing two pieces of work with Transport Scotland. One is about the way in which we receive grants for our port infrastructure, and the other is about voted loans. My view is that, if it is possible, all the money should be provided as capital funding, with no voted loan, so there is no interest. That would substantially reduce the overall cost over time.There is a bit of a funny system with ports at the moment. Basically, if we need anything up to £20 million, we can receive 100 per cent grant funding; if we need anything from £20 million to £45 million, CMAL provides 20 per cent, with match funding; and if we need more than £45 million, CMAL provides 40 per cent. That means that we must save up a lot of money in our piggy bank, if I can put it that way, for our port projects. If there was 100 per cent grant funding, we would not have to do that, which would mean that the charges for the use of harbours would come down dramatically, because we would not need to provide any capital funding.

Graham Simpson Reform Central Scot and Lothians West
link

I agree that it is a completely ludicrous system.

Kevin Hobbs Caledonian Maritime Assets Limited
link

I did not use that word.

Graham Simpson Reform Central Scot and Lothians West
link

Well, I did. I think that it is ludicrous, and it needs to change.I want to ask about the small vessel replacement programme, if that is okay.10:45

Kevin Hobbs Caledonian Maritime Assets Limited
link

Yes.

Graham Simpson Reform Central Scot and Lothians West
link

We have a second phase of that programme to come, with two vessels.

Kevin Hobbs Caledonian Maritime Assets Limited
link

Two, or possibly three.

Graham Simpson Reform Central Scot and Lothians West
link

Two, or possibly three, but if there are two, am I correct in thinking that they are for Harris and Barra?

Kevin Hobbs Caledonian Maritime Assets Limited
link

Correct—the Sound of Harris and the Sound of Barra.

Graham Simpson Reform Central Scot and Lothians West
link

Okay. I was having a look at your website, and I saw that you were meant to have funding in place and to be procuring those vessels in quarter 3 this year, with delivery in 2029. As we know, the Government wants to make a direct award, and we will come on to that, but that seems to me to have delayed everything. Are we running the risk of delivery not being in 2029, given that you have not even got to the point of funding being in place and the procurement happening?

Kevin Hobbs Caledonian Maritime Assets Limited
link

We were ready to go. The outline business case had not been signed off, but all of this has now effectively been wrapped up in the direct award. Therefore, my answer is this: while the Government is contemplating this, we cannot move forward, because we will not have the letter that will allow us to get a voted loan. We cannot go out to procurement until that particular piece of work is concluded. However, we have done all the work on the concept, the design and the technical stuff for the future ferry, and we are ready to go.

Graham Simpson Reform Central Scot and Lothians West
link

In fact, you have pictures of the designs on your website, if anyone wants to have a look.In other words, the whole thing is going to be delayed, so we probably will not be seeing those vessels in 2029.

Kevin Hobbs Caledonian Maritime Assets Limited
link

It depends how long the delay is. We were hoping to get them in early 2029; if the procurement is delayed by 9 months, it might be late 2029. What is undeniable is that, if a ship takes X amount of time to build, not tendering for it, not making that decision and not awarding the contract will have a knock-on effect, for sure.

Graham Simpson Reform Central Scot and Lothians West
link

So, behind all of this lies the Government’s wish to make a direct award to the Ferguson Marine yard for the—let us say—two vessels. What is your view on that?

Kevin Hobbs Caledonian Maritime Assets Limited
link

I could be here for an hour explaining it, but I will try to do it very quickly.It is fair to say—indeed, it was out in the public domain prior to and after the election—that the Government is standing behind Ferguson’s as the last commercial shipyard on the Clyde. To be frank, we as an organisation have no quarrel with that. If that is what the Government wants to do, that is absolutely fine.As it stands, it is not lawful for CMAL to make a direct award. There are a number of measures that you can take, and one of them, which we are taking, is to change from a public corporation into a non-departmental public body. That has nothing to do with this direct award—it is to do with the direct award of the CHFS contract. We would have to be something called Teckal compliant, which is very complicated. However, we might find ourselves sometime next year in a position where our shareholder could instruct us to make a direct award. As it stands at the moment, it is not lawful for us to do so, but it could be lawful in the future if we make these changes to CMAL.Moving on, our reason for being is owning assets and ensuring that, to the best of our ability and with the funds that we are given, new vessels, and new ports, get built. That is CMAL’s core aim and value—that is what we want to do. Are we always successful? No, because we do not always get all the money that we want, to do what we want to do. Obviously, our board has talked about this quite extensively, and if it were to come to pass that the Government wanted to give what was effectively a direction—and if it were legal for us to receive it—we would have to do it.If you are asking me for the opinion of CMAL and the board, I would say that, although we want to see the shipyard survive, we do not believe that building ferries there is the right thing to do for the island communities. What we have witnessed is that, as you will be very well aware, the vessels that the yard is currently building have not been value for money and have been heavily delayed. We would not want that to happen to the small vessel replacement programme, because, as Donald MacKinnon has said, with the Loch Portain being out of service, those ships need to arrive in a very timely manner.That is the reason. It is not that we do not want a near neighbour of ours, which the shipyard is, to survive. However, from a commercial perspective, I, and the board, do not believe that we ought to be building ferries there at this point in time. We need them at pace, and we need them to be value for money, and we do not think that, as it stands today, either of those things will be the case.

Graham Simpson Reform Central Scot and Lothians West
link

Okay. So, in your view, in the interests of islanders, you would rather not make a direct award to the Ferguson Marine yard.

Kevin Hobbs Caledonian Maritime Assets Limited
link

A hundred per cent, and we have written to the Government to tell it so.

Graham Simpson Reform Central Scot and Lothians West
link

You have told the Government that.

Kevin Hobbs Caledonian Maritime Assets Limited
link

Yes.

Graham Simpson Reform Central Scot and Lothians West
link

And what has been its response?

Kevin Hobbs Caledonian Maritime Assets Limited
link

Nothing yet. It was only relatively recently that we had our board meeting and wrote the letter.

Kevin Hobbs Caledonian Maritime Assets Limited
link

Ultimately, with regard to the direct award, you will really need to speak to the cabinet secretary to find out his and the Government’s current thoughts on the matter.

Graham Simpson Reform Central Scot and Lothians West
link

As you know, he is on next, so we will be able to ask him.

Kevin Hobbs Caledonian Maritime Assets Limited
link

He will probably kick me as I walk out of here.

Graham Simpson Reform Central Scot and Lothians West
link

You are bigger than him, so you should be okay.

Willie Rennie LD The Convener · Fife North East
link

Thank you very much for your very enlightening evidence this morning. I want to apologise to Calum Mackenzie for not bringing him in much for the last few questions, but we really appreciate his joining us remotely. To those who are here in person, I want to say that we have had a very valuable evidence session, and it has set us up with some important questions that we will continue to ask.I now suspend the meeting to allow for a short break and a changeover of witnesses.10:51Meeting suspended.10:56On resuming—

Willie Rennie LD The Convener · Fife North East
link

I welcome Stephen Flynn, the Cabinet Secretary for Economy, Tourism and Transport, who is supported by three officials. Colin Cook is the director of economic development at the Scottish Government, and Chris Wilcock is the director of ferries and ports at Transport Scotland. I am beginning to get worried, because this is Alison Irvine’s third session with the committee—I wonder whether she just lives at the Parliament. She is the chief executive of Transport Scotland, and I welcome her here again.I ask members to be concise with their questions and witnesses to be equally concise with their answers. I invite the cabinet secretary to make some opening remarks.

Stephen Flynn SNP The Cabinet Secretary for Economy, Tourism and Transport · Aberdeen Deeside and North Kincardine
link

Good morning. It is a pleasure to be back at the Transport Committee, and I look forward to providing updates and taking questions on ferries, ports and harbours. I welcome the fact that this is a key area of the committee’s work. It is our vision that Scotland’s ferry services, supported by other transport modes, are safe, reliable, affordable and inclusive for residents, businesses and visitors. It is essential that they enable transport connectivity, sustainability and the growth of island and peninsular communities and populations.Since we last spoke, there have been a number of positive developments. We have marked one year since the direct award of the Clyde and Hebrides ferry services arrangements to CalMac, and we are making good progress with the procurement of the new northern isles ferry services contract. The MV Loch Indaal received relevant approvals for handover to CalMac just yesterday and is preparing to commence her journey to Scotland. I wrote to the committee on 29 October regarding the revised approach to the delivery of the MV Glen Rosa, and I look forward to her delivery and arrival in service in early 2027. I accepted the recommendations to change the handover date, allowing new propeller blades to be fitted and allowing CalMac to retain the MV Isle of Lewis in service for longer over the next few weeks. The decision gives the best opportunity for reliable, resilient ferry services and greater flexibility in managing crew and existing vessels. Earlier this month, I attended the transport winter resilience launch and was particularly pleased that we were able to host the event at the NorthLink Ferries facilities in Aberdeen, emphasising the importance of our ferry services during the winter period.Although I am glad to be able to report that positive progress in a number of areas, I am conscious that the delivery of ferry services remains challenging and that there is more to be done to deliver our vision. I am determined to keep up that effort. Thank you for the opportunity to make these opening remarks. I am happy to take questions.

Willie Rennie LD The Convener · Fife North East
link

Thank you. What is your reaction to the information that we received in the earlier evidence session that the Glen Rosa, which you have just referred to, and the Glen Sannox might never use LNG again?

Stephen Flynn SNP Aberdeen Deeside and North Kincardine
link

I was listening closely to the comments in the previous session, which were very informative. The determination that we will need to make is whether the economics in relation to LNG deliver for the public in terms of both expenditure and the reliability of services to the islands. That work is ongoing, rightly, because we must ensure that we are spending the public pound in the wisest possible fashion. I am sure that you would be supportive of that approach.11:00

Willie Rennie LD The Convener · Fife North East
link

The two most expensive ferries in the whole fleet were designed with this dual-fuel capacity and facility. They were subject to controversy last year over the leaking of gas, but, nevertheless, they are the two most expensive. Two factors were mentioned in the earlier session. One was the price of LNG, which you cannot control, but the second was the cost of building the infrastructure at Ardrossan. We know that there have been difficulties with ownership, but that would have been foreseen, so why is it a factor in the use of LNG? This is surely just down to price. You surely considered the cost of building the infrastructure instead of tankering it up from down south.

Stephen Flynn SNP Aberdeen Deeside and North Kincardine
link

As Mr Hobbs correctly outlined, and as you have alluded to, it was a number of years ago when the decision was made to ensure that the vessels were LNG. The world was then in a very different place both in terms of dual fuel and in relation to global economic factors, which we are now all burdened by every day, whether in the Government or in households across these isles. Taking those two things into consideration, which we must, the economics of the situation have changed, as Mr Hobbs outlined.We are looking to undertake significant redevelopment work at Ardrossan, so, over the course of the coming period, we need to ensure that the determination of the extent of those works aligns with best value for the public. We know, because we have seen it up until now, that the vessels can operate without LNG; the Glen Sannox has been incredibly successful in that regard. Indeed, just the other day, in the chamber, I recited to you the figures showing its reliability. It has been crucial in providing resilience across the network over the course of its time in service.

Graham Simpson Reform Central Scot and Lothians West
link

Cabinet secretary, how do you respond to Kevin Hobbs’s comments that he does not wish to give a direct award for two ferries to the Ferguson yard?

Stephen Flynn SNP Aberdeen Deeside and North Kincardine
link

Mr Hobbs was very thoughtful in his remarks, and it was an argument that has been posited not just by him but by members of the Parliament in the chamber and by members of the communities in the islands. As a Government, we have to make a rounded determination in relation to the awarding of a contract and the delivery of a vessel to meet the expectations of the public. There is also the fundamental necessity to retain commercial shipbuilding on the Clyde. It was with that in mind that the announcement was made by my predecessor earlier this year in relation to SVRP2 and the two further vessels through Marine Scotland. As I have outlined to the Parliament, we remain committed to that to secure the future of Ferguson’s and to ensure that we can deliver the vessels that islanders deserve.

  1. 09:15 Ports, Harbour Infrastructure and Ferries Evidence session · 408
  2. 09:15 Subordinate Legislation Subordinate legislation · 26

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.