Willie Rennie LD The Convener · Fife North East
link

The next item of business is our second pre-budget scrutiny evidence session. The committee has agreed to focus on road and rail developments. We will hear from two very different panels of witnesses this morning.On the first panel, we have David Giles, who is chair of the Asphalt Industry Alliance; Scott Grant, who is vice chair of the Chartered Institution of Highways and Transportation Scotland; Russell Jackson, who is chair of the Railway Engineering Institution; David Macdonald, who is regional director of the Civil Engineering Contractors Association Scotland—I welcome him back again, as he is a regular feature at the committee—and Lee Pounder, who is chair of the Rail Industry Association Scotland.I declare an interest, as I had dinner with Lee Pounder last night, so we are going to give him the hardest questions.I ask members and witnesses to keep questions and answers as short as possible. I will start. Last week, the committee heard from road and railway campaigners about just how long the process for agreeing new road and rail developments takes. Do you have any observations about how the system works and how it could be improved? Who would like to go first?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

Good morning. Obviously, these infrastructure projects are generally complex in nature and require investigations to be carried out in order to understand the prevailing ground conditions and anything else that may affect the engineering of the scheme. Once the final scheme is arrived at, there is consultation with members of the public and interested parties, and that can sometimes lead to delays if there is opposition or if there are grounds for opposition that have to be assessed and engineered out. There is also a need for environmental compliance to ensure that schemes have as minimal an impact on the existing environment as possible. Those factors together lead to a process that takes time. Sometimes, at the start of a project, it is difficult to ascertain exactly how long it will take as a result of what may come out through either the investigation process or the consultation process.

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

I believe so, yes.

Willie Rennie LD The Convener · Fife North East
link

Which bit of the process do you think could be sped up?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

Schemes of national importance and significance, which obviously have a significant impact on the economy and make a positive contribution to how we move people and goods around Scotland, sometimes face opposition from a very small number of very local people who are affected by the schemes. While their concerns have to be heard, the process of resolving those issues can sometimes take a significant period of time. There are examples of projects—not necessarily in Scotland, but elsewhere—that have been wrapped up for a number of years in legal challenge from what is a very small group of objectors.

Willie Rennie LD The Convener · Fife North East
link

What about observations from the rail side?

Russell Jackson Railway Engineering Institution
link

I will build on what Scott Grant said in a couple of areas.First, from a global perspective, I completely agree that, with prioritisation of national infrastructure, the consenting approach is often challenging. Prioritisation has been difficult, and we see other countries around the world trying to change legislation to streamline the process. Scott Grant eloquently explained the engineering challenges and a lot of the other information that needs to be provided. That creates a very large volume of information for the public to assimilate and assess. The people who tend to have the time for that are often retired, and they are going to see much more of the detrimental aspects of a project. It is much harder to get input from working families with children who are going to benefit from these very long-term projects. Many countries are looking at streamlining and simplifying the consents process for national infrastructure, and at trying to change legislation and policy.My second point builds on the point about the prioritisation of national infrastructure. Two things that often delay new infrastructure are utilities and right-of-way acquisition. If the Government is better able to ensure that utility organisations and, in particular, public ownership of land are prioritised, that is another opportunity to accelerate delivery.

Lee Pounder Rail Industry Association Scotland
link

From a rail perspective, the recently published “Rail Recharged: Scotland’s Fleet Transition Strategy” is a great example of how we are actually moving things forward in rail. We are now starting to integrate things such as rolling-stock strategies with infrastructure and power strategies. Significant investment is required across all three workstreams. Aside from the issue of consents that my colleagues spoke about, we need to look at how we invest strategically in rolling stock, infrastructure and power and at how we integrate the three together to ensure that we can actually deliver, or continue to deliver, in a timely way for our paying passengers and the public.

David Macdonald Civil Engineering Contractors Association Scotland
link

I have noticed, with a number of clients, that early contractor involvement seems to be becoming more prevalent in the industry, and I think that makes a difference. It goes back to collaboration—it is better if we are working together to an end goal rather than working separately, and contractors getting early input would assist in and accelerate that process. I have noticed it with a number of clients, who are now looking at that model as a way forward.

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

To pick up on David Macdonald’s point, as well as accelerating delivery, early contractor involvement significantly derisks delivery, as it brings in the contractor’s view of how they ultimately want to construct the scheme and makes sure, at the initial design stages, that the construction solution is as efficient as possible. It allows contractors to bring their expertise and knowledge in construction to the table earlier in the process, and we see benefit in that.

David Macdonald Civil Engineering Contractors Association Scotland
link

Yes, it allows the party with the best solution to manage the risk—that is the way that it should be.

Willie Rennie LD The Convener · Fife North East
link

On the development of new railway opportunities, such as new stations or lines, Lee Pounder and I were talking last night about the difference between Balgray and Winchburgh. Lee, do you want to say a wee bit about that, and about how the timing of when you do something makes a difference to its cost and its delivery?

Lee Pounder Rail Industry Association Scotland
link

Balgray has been a great example of how to do it. The station has been delivered ahead of schedule and to budget, and decisions have been made in a timely way. The outcomes for the station were predominantly derived from the contractors rather than through output-based contracting, as a couple of the other gentlemen here have said.Winchburgh, on the other hand, has had significant delay in decision making. The housing and infrastructure there have moved ahead of the rail corridor, which means that going back to build Winchburgh station will probably cost more money and will take longer now, causing more disruption to passengers. The model of forward planning, strategic thinking and early decision making has definitely contributed towards a successful job at Balgray.

Willie Rennie LD The Convener · Fife North East
link

I want to talk about budgets and about the investment that you make in skills, new technology and different ways of doing things. What is your experience of fluctuations in budgets in recent years, and how has it impacted on your members’ confidence about investing?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

Single-year funding models make it very difficult for those in both the public sector and the private sector to plan any investment in infrastructure. Major roads or rail schemes involve programmes that can take many years to come to fruition. Having a fully funded pipeline over a number of years allows the industry to invest in skills, bringing in the right people and the right resources and allowing for innovation. CIHT has done some research that shows efficiencies of somewhere between 5 per cent and 10 per cent in moving to a multiyear model. For projects costing hundreds of millions or billions of pounds, that could bring a significant saving to the public purse.

Willie Rennie LD The Convener · Fife North East
link

Give me some examples of the consequences for your members, in terms of redundancies, for instance. Perhaps you have seen tech from other parts of the world that you could bring into the United Kingdom, but you do not really have confidence that the budgets will be there to justify that investment. Do you have any examples of things that you would like to do, or of negative consequences of not having multiyear funding?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

There are some very real examples happening at the moment. We have a booming energy sector in Scotland, with significant investment in energy—which is the right thing to do. However, the core skills that the energy sector is looking for and would like to grow can be found in the highways sector and in transportation more widely, so our sector is losing some very experienced people, particularly to the energy sector and the water sector, which seem more sure about future funding and are paying bigger salaries to get those individuals.

Willie Rennie LD The Convener · Fife North East
link

How much bigger are the salaries? Do you have examples?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

Anecdotally, the difference is in the order of 20 to 30 per cent. I have heard that from individuals who have moved to the energy sector.

Willie Rennie LD The Convener · Fife North East
link

Do others have experience of that?

Lee Pounder Rail Industry Association Scotland
link

Yes. There is now a huge disparity, certainly between rail industry wages and what is now being offered in energy and utilities. There is currently a civil service job for roads paying a civil engineer circa £60,000. That seems hugely disproportionate to what is now being paid in energy. I would estimate that an equivalent role in energy would go for about £80,000 to £90,000. That is the disparity that we can see.

Willie Rennie LD The Convener · Fife North East
link

Where is that position? What is that person getting offered £60,000 responsible for?

Lee Pounder Rail Industry Association Scotland
link

It is the same job as a senior civil engineer, either in roads or in energy. I would say that the disparity in wages goes from £60,000 in roads to £90,000 in energy.

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

That challenge exists at a senior level, among project management and project leadership staff—people with real experience—who are being tempted out of the industry and out of our sector into energy. That could present a challenge for the future planning and delivery of schemes if that trend continues.09:30

David Giles Asphalt Industry Alliance
link

My evidence is from England and Wales. The Asphalt Industry Alliance carries out the ALARM—annual local authority road maintenance—survey of all local authorities, where we ask questions around funding and the condition of the highways.We call for longer-term funding horizons, because the cost of short-term funding horizons is, to put it very simply, the potholes that we see in the roads, the number of which has grown to an astronomical level. I recently said, in relation to our last ALARM survey, that our roads in England and Wales have reached a state where they are an absolute national disgrace. It is not difficult for people to see the proof of that when they drive along the roads.I cannot speak to Scotland, because the Scottish authorities have not put any data into the ALARM survey for a number of years.We have called for the front-loading of investment. When investment happens, in years that the Government puts in extra money, we see an attempt to catch up. However, the scale of the backlog of maintenance has now become so huge that highway engineers simply cannot keep up with the maintenance that is required. To turn it on its head, the Department for Transport’s own data estimates that, for every pound that is spent on the roads, we get up to nine pounds return on that investment.If we take that evidence, and also the anecdotal evidence of road users, it is not difficult to see that we have got into a cycle of patch and repair in England and Wales, which is costing us more money than a properly funded maintenance regime would.

Lloyd Melville SNP Angus South
link

To pick up on the point that David Giles made about potholes, I am interested to hear that the Scottish authorities are not submitting any data to you. When did that stop?

David Giles Asphalt Industry Alliance
link

We stopped collating data from Scotland about 10 years ago, partly because of the number of people who were interested in submitting, but also because, at that time, the Scottish Government was going to do its own survey of the condition of the highway. I understand that you do sideway-force coefficient routine investigation machine—SCRIM—testing and so on.I will be honest with the committee and say that the condition of Scottish roads is, in some areas, better than in England but, in other areas, it is not. We do not have the data for Scotland, as we have for England and Wales, to enable us to give the committee reliable evidence. However, we sort of extrapolated the scale of the problem. The last time that we looked at the Scottish shortfall in funding, it was around £700 million to £800 million. If we were to extend that to today, the backlog in maintenance funding would run into many millions. However, we do not have the data between those points, unfortunately.It is safer for us to stick with the England and Wales evidence.

Lloyd Melville SNP Angus South
link

You might be aware that the Scottish Government made a commitment during the election campaign to put in place a £350 million better surfaces fund, specifically for potholes. Will that make a difference?

David Giles Asphalt Industry Alliance
link

Of course it will make some difference. However, without knowing the backlog that you have in Scotland, it is difficult to make a proper comment on that.In England and Wales, every time that a sum of £500 million is added to the road budget, it comes with conditions. Those conditions can mean providing data to the DFT on the condition of the local authorities’ roads, which we strongly support, because the only way that we will see improvement is through data. Normally, however, the additional money ends up being spent on filling potholes, rather than on properly maintaining the roads.

Lloyd Melville SNP Angus South
link

That is where I wanted to get to. Obviously, it is all well and good to do a patch-up job, but more potholes will appear if the quality of the road is not kept up. What is the best model for road maintenance, rather than patching potholes?

David Giles Asphalt Industry Alliance
link

The best model is to leave the experts—the highway engineers—to define the condition of the road and put in place a long-term maintenance programme, which includes repair. That maintenance programme will include many types of interventions, with everything from surface dressing to resurfacing of the road.In many locations in England, the surface of local authority roads is so poor that they are beyond patching and require resurfacing, but there is insufficient money to do that. Therefore, the patching continues, which is a waste of public money, because it has to be done again and again.

Lloyd Melville SNP Angus South
link

I think that I remember seeing in the figures that we have for Scotland that, in 2025, the condition of one in three roads in Angus, which I represent, was red or amber. Therefore, that is an issue that we are very alive to.Scott, do you have any reflections on road maintenance and, in particular, the £350 million fund that the Government announced?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

Yes. To pick up on David Giles’s point, in Scotland, we use the Scottish road maintenance condition survey to assess the condition of the roads. That process is undertaken by the Society of Chief Officers of Transportation in Scotland. As is mentioned in the briefing pack, it categorises roads as green, amber or red. The 2023 backlog and steady-state maintenance model estimated that, at that time, the total cost of repairing the red and amber sections would be about £2.2 billion and that around £333 million per year was required just to maintain the roads in a steady state. It found that significant investment was required in the road infrastructure. As I am sure that David Giles would attest, the cost of the core materials that go into a road surface—bitumen and other oil-based products—has increased significantly due to inflation, so that figure is likely to be low.That survey showed that the condition of roads had improved since the previous survey but, as the figures that I mentioned show, sustained investment is required simply to maintain the current position. At the moment, many local authorities face a challenge in finding the funding to maintain the roads in a steady state each year. Most local authorities know from the condition surveys of the network that they are not doing that, although some are finding the funds to invest in that, because they recognise the benefits of addressing the condition of the roads.

Lloyd Melville SNP Angus South
link

Indeed. It is positive that Angus Council has set up a specific infrastructure fund to invest in the roads.I want to press you on the £350 million fund, because you have just said that it costs about £333 million a year to keep the roads as they are. We are not clear, because we have not yet had the budget, whether that £350 million is for the whole parliamentary session or whether it will be front loaded. Do you have a view on what is required in that regard in the budget?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

You could ascertain what that figure should be by speaking to local authorities in Scotland to understand their maintenance backlog. Most authorities will have an indication of the current condition of their roads and what their steady-state funding is. Information could be collated on the gap between the money that is required to maintain the roads in their current condition and the funding that would be required to deal with the backlog, because they will have records on that.As has been mentioned, any investment in the road infrastructure is very welcome. I am concerned about the terminology of a “better surfaces fund”, because the road surface is one thing, but there is also the issue of the surface of footways. In dealing with public liability claims, it costs local authorities more to settle claims from people who were injured while walking or cycling on a footway than it does to settle claims relating to the carriageway, which might involve the cost of replacing suspension, tyres and so on. In general, the cost of settling footway claims is far higher for local authorities than the cost of settling carriageway-related claims. If we take a wider view, there is also the issue of the impact on the national health service.

Lloyd Melville SNP Angus South
link

I turn to David Macdonald. Do you have any views on the subject of road maintenance?

David Macdonald Civil Engineering Contractors Association Scotland
link

No, not particularly.

Lloyd Melville SNP Angus South
link

That is fine. In that case, I will move on to rail, as we have some witnesses from the rail industry, and I want to include everyone and keep all our witnesses happy.I will start with Lee Pounder. For control period 7, Network Rail has moved from regular cyclical maintenance to a more risk-based—and, therefore, more targeted—approach to maintenance. Do you agree with that approach? Have you noticed any impacts as a result of that change?

Lee Pounder Rail Industry Association Scotland
link

I do not represent Network Rail, so it is probably wrong for me to answer on its behalf.

Lloyd Melville SNP Angus South
link

Would your members have a view on how effective that is?

Lee Pounder Rail Industry Association Scotland
link

Network Rail is spending something like £1.95 billion over five years on renewals and maintenance. I think that our members’ view is that, similarly to the situation with roads, it is costing more to do less or the same. Therefore, the investment in rail for renewals is becoming harder.There is now a big focus on how we can change that to investment in new infrastructure. That is a good segue to what we are talking about with road. Something like 73 heavy goods vehicles can be taken off the road if we open up freight routes on rail. That would alleviate some of the pressures on the road related to maintenance and other things. There is a huge link there. To maintain the assets that we have, we need to do something differently, with technology and innovation. Otherwise, with the current infrastructure, we will either stagnate or actually deteriorate, because we will not achieve the same volumes for the same value.

Lloyd Melville SNP Angus South
link

Russell, I have the same question for you. Do you agree with Network Rail’s approach? What has its impact been?

Russell Jackson Railway Engineering Institution
link

I will just build on what Lee Pounder said. Network Rail’s approach is risk based, but it is also based on evidence and data. However, one of the key drivers of the efficiency of work is access. If access is very limited, that will push up the costs. In Scotland, there is a much closer relationship between track and train, which I think affords a better opportunity. The UK Government is moving towards that model south of the border. There are a lot of proven ways of working when it comes to maintenance and renewals that Network Rail has been doing in Scotland that are more efficient. That is a good basis for the approach. I will just say that the less access that there is, the more difficult it is to do a full renewal of any asset. That is a really important point when it comes to driving efficiency.

Willie Rennie LD The Convener · Fife North East
link

Before you move on from access, I want to ask a question. Russell, can you explain and give examples of how good and prolonged access changes the cost of doing a project?

Lee Pounder Rail Industry Association Scotland
link

I can give a recent example. We have just had various parts of the Fife circle line shut for a total of 18 days. We managed to achieve six months’ worth of work that traditionally we would have done during our evening access windows. We estimate that it is probably at least 50 per cent more efficient to do such work in blockade scenarios where we have uninterrupted 24/7 access. That is quite a large statistic.

Willie Rennie LD The Convener · Fife North East
link

So that is cutting the cost in half. Did you say 18 days for six months’ work?

Lee Pounder Rail Industry Association Scotland
link

Yes—half a year.

Willie Rennie LD The Convener · Fife North East
link

Do you have examples, Russell?

Russell Jackson Railway Engineering Institution
link

I want to add a bit on what happened in Fife. That project was not just one renewal; it was trying to do as much as possible across all the assets at once. That is where we need to be: driving efficiency by looking across all the asset types.I can give an opposite example. When four-hour windows are given to do work on the railway, an hour of that is used closing the railway safely and mobilising people, and an hour is for taking people off the work and reopening the railway. It is the most inefficient way possible of doing things.Also, from a staffing and talent point of view, an offer to young people of roles on the railway where they will work only for four hours at night, in the middle of the night, is not the most attractive thing. Doing a huge job such as that one in Fife drives the success of the industry and also attracts people and capabilities to the industry.

Willie Rennie LD The Convener · Fife North East
link

I notice that that is being done more on roads as well—roads are being closed completely for a period to get the work done. Is that a pattern?09:45

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

Yes, I have seen evidence of that. Rather than deal only with potholes, we can empty the gully pots, clean the sign faces and do other things of that sort in one closure. That applies especially in the trunk road network, where traffic moves at high speed and the workforce needs to be protected. It is much more efficient to take a holistic approach across asset classes and deal with maintenance in one intervention, or a series of planned ones, under a total closure.

David Macdonald Civil Engineering Contractors Association Scotland
link

I totally agree. A mindset change is going on at the moment, and we are accepting short-term pain for long-term gain. As the guys have said, that approach is definitely more efficient.The feedback that I get from Network Rail is that there is frustration from the supply chain. As Russell Jackson pointed out, if there is a four-hour closure, probably only an hour’s work is done during that. It is difficult for people to understand that, because they are not getting anywhere during that period of time. Based on what we have seen, some sense is starting to flow through in relation to closures. More work can be done, and it can be efficient. The downside is that there is frustration from road users and, potentially, the people using rail services—such as myself, a couple of weeks ago. However, it is 100 per cent the right way to go.

Willie Rennie LD The Convener · Fife North East
link

Fifty per cent is a huge saving.

David Macdonald Civil Engineering Contractors Association Scotland
link

Yes.

Lee Pounder Rail Industry Association Scotland
link

We have seen the short-term pain, but the passengers and the public come back. Across ScotRail, passenger numbers are up by, I think, 3.1 million over the past six months. Even with blockades on the Fife circle line or the jobs at East Kilbride and Glasgow Barrhead, all the evidence suggests that the passengers come back. They would prefer the short-term pain.

Russell Jackson Railway Engineering Institution
link

That is especially the case if the work is well planned. Much of the evidence points to planning well in advance. Lee Pounder and other colleagues have talked about that applying to inputs, contractor involvement and making it clear to the public exactly when the disruption will be so that they can plan their journeys accordingly. There are many reasons why long-term planning and a lack of change from when that planning starts to when the project is implemented provide a platform for successful outcomes.

Lloyd Melville SNP Angus South
link

I will keep this next question brief, in the interest of time. You will be aware of the increasing number of storms and severe weather events that we have been having, and those have a significant impact on our infrastructure. Russell, is enough being done to embed climate resilience into infrastructure planning and delivery?

Russell Jackson Railway Engineering Institution
link

Some events during the past few years have been highly disruptive. The evidence is there that increased monitoring is needed. A lot of technology is being brought in by Network Rail.

Russell Jackson Railway Engineering Institution
link

That is the challenge. There are two big pressures on the transport budget. The first is inflation, which colleagues have talked about, and the second is budgeting for climate resilience. Capital projects are getting more expensive because there is a need to increase resilience. It is the right thing to do, but doing so is more expensive.

Lloyd Melville SNP Angus South
link

On the flipside, the longer you delay embedding climate resilience, the more expensive it will be further down the line.

Russell Jackson Railway Engineering Institution
link

It increases the risk, as there will probably be a bigger impact further down the line.

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

I support what Russell Jackson said. It would be good to have Government investment in resilience funding and to ensure that that is ring fenced. That can be done not only after an event, but by looking at the Scottish transport network and understanding where there are particular vulnerabilities and where better investment can mitigate those. An example is the length of the diversion routes on the A83 and some of the problems that such things can cause.There are particular pinch points in the network, and additional investment to build more resilience would be welcome. We need to understand where the pinch points are, so we could do modelling on that. For example, we could ask “What would be the impact on the Scottish economy if X happened to Y road?”It is also important to recognise that roads carry more than people and goods, and that critical infrastructure is often buried underneath them, because utilities generally sit along the road corridor. Landslips can have an impact on more than the movement of goods, because they can take out critical services, too, so there is a wider perspective than just the transport one.

David Giles Asphalt Industry Alliance
link

I cannot speak about the amount of money put into Scottish roads, but there is clear evidence that taking a reactive approach to maintenance makes it difficult to build in any kind of resilience to deal with climate change. We are seeing the already very short funding that local authorities have being used to patch up roads, and that problem has become bigger because of the climate issue.One simple but important factor is the cleaning of gullies and drains. If an articulated lorry drives over a pothole when the edge of the road is flooded, the hydraulic pressure adds to the existing stress on that road, which will break up more quickly. More extreme temperatures, both high and low, will do the same thing, because you get freezing and thawing.Products that can resolve that have been on the market for a long time. In Scotland, you have been using modified binders in your asphalt for a good 10 years and have developed the use of stone mastic asphalt. Less of that, and less modified binder, is used in England and Wales. Those products are more expensive but, where a long-term approach is taken, we see a payback for that investment in high-quality materials.Another point about climate resilience is that asphalt is 100 per cent recyclable. The resilience of our roads must be based on adopting a whole-life cost model, rather than a short-term one. Some recycled products will not last for as long as new or virgin materials, but they come with an opportunity to significantly reduce the amount of carbon expended in the maintenance and construction of highways.

Lee Pounder Rail Industry Association Scotland
link

For unfortunate reasons, our tactical response is getting much better. Whether for proactive or reactive reasons, we are much better set up to deal with storms.It all comes back to the need to be serious about modal shift, about net zero and about investment. Last year, the ScotRail electric fleet took out more than 122,000 tonnes of carbon dioxide from our country and the planet. The statistics are there and we can see for ourselves that the frequency of storms is increasing, so we must act now.

David Macdonald Civil Engineering Contractors Association Scotland
link

We have noticed that sustainability, resilience, net zero and future proofing are now built into the design of all projects, but the timing could not be worse. There is not much money going around to invest in those projects and their real-life cost has gone up because of those measures.

Lloyd Melville SNP Angus South
link

To cap off my line of questioning, I am aware of flood defence schemes that were designed to last for a significant period of time but have become redundant much more quickly because of the pace of climate change. That is a danger for infrastructure projects on our roads and railways, too.That is everything from me, convener.

Willie Rennie LD The Convener · Fife North East
link

We move to questions from Donald MacKinnon.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

I thank the panel members for joining us today.Last week, we heard from John Gurr from the A83 Rest and Be Thankful campaign. That project is a perhaps quite extreme example of complexity, both as a road project and as an example of how to deal with road closures. I would like to touch on building relationships and communication, particularly with Transport Scotland. David Macdonald, you mentioned earlier how important early engagement in projects is in order to eventually reach good outcomes. How important is building relationships and communication in that process? Do you have reflections on the complex projects—not necessarily in relation to the Rest and Be Thankful campaign—in which that approach is important?

David Macdonald Civil Engineering Contractors Association Scotland
link

We had one of our quarterly meetings with Transport Scotland a couple of days ago, and one of the discussions that we had was about early contractor engagement. That is now at the forefront of Transport Scotland’s thought process when it begins projects, which can only be a good thing. We discussed its potential project portfolio and how it will engage contractors to get the best solutions. In the case of the Rest and Be Thankful, it will be going through a process with the contractors to come up with the best solution to the challenges there, which can only be a good thing. We have been crying out for that direction of travel for a long time, and it now seems to be coming to fruition, which we whole-heartedly welcome.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

So, has that relationship changed over time? Is that situation quite recent?

David Macdonald Civil Engineering Contractors Association Scotland
link

Yes, that is a recent development. Before that, who did what in a project was very siloed, but now we are back to collaborating. That is a recent development that we fully welcome.

David Macdonald Civil Engineering Contractors Association Scotland
link

In the long term, yes. We have to go through a process first, because how that relationship works is new to everybody, but it will, 100 per cent, have an impact on the whole-life cost of projects going forward.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

Scott, I will come to you next. There is a similar question around the ongoing relationship and communication between industry and Transport Scotland. Do you have anything to add on that?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

To pick up on what David Macdonald said, the industry has a very good relationship with Transport Scotland. Some of our members work for Transport Scotland, so there is engagement with the industry.Another important point is the need to engage with the public and consider what the industry can do to be more visible to the general public with regard to some of the major schemes that we are planning. Earlier, we discussed the disruption that projects can bring and some of the efficiencies that can be achieved through the trade-off of short-term pain for long-term gain. However, it is also important to work with the public and inform them about the outcomes of a scheme and what it will ultimately deliver once it is in place.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

What could the benefits be of such engagement with the public agencies or with the public themselves? What are the benefits of such engagement for the ultimate outcomes?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

As we mentioned earlier, a big part of the process is consultation, and consulting more effectively and perhaps earlier in the process would lead to time savings, because, rather than presenting the finished scheme and saying, “This is what we’re going to come and do. What are your thoughts?”, involving them earlier in the process might resolve some of the objections to the schemes and therefore shorten the time a scheme might face if it is subject to objections.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

David Giles, how important for the industry is that engagement when it comes to planning the pipeline for projects, the materials that will be needed and so on?

David Giles Asphalt Industry Alliance
link

My experience of engagement has been with the Transport Scotland-led Scottish road research board, through which there has been a tremendous amount of knowledge sharing in terms of standards, as well as new technologies and techniques. That feeds through into the issues that you have raised, because it means that, when a scheme is discussed, it is no great surprise if somebody proposes a new kind of material.My experience, from attending industry events, is that Transport Scotland is very active in engaging with industry bodies and standards associations and in holding a two-way dialogue on new materials.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

Does that help with industry planning? Does that help with understanding what will be coming down the line?

David Giles Asphalt Industry Alliance
link

In my day job, I work for a company that is involved in the construction and maintenance of roads, so my answer is yes, of course it helps. We do not operate in Scotland, but we have the same dialogue with the Department for Transport, National Highways and so on. That dialogue is essential, because there would otherwise be significant delays.10:00

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

I will pick up on what David Giles said and on your mention of a pipeline. That is aspirational without funding. Without funding, it is very difficult for industry to plan and bring on board the innovative techniques and plant that we need to construct our schemes—and, indeed, the people we need, from the inception of the process, to look at options, right the way through to construction on the ground. That requires a significant workforce and significant investment in skills. Without a fully funded pipeline, those things are aspirational. That goes back to the earlier point about funding.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

It also feels as though the two things are linked. Early engagement—making sure that contractors and the industry are engaged and have an understanding of what the costs will ultimately be—will give more budget certainty. However, ultimately, the fully funded pipeline has to be there.

Lee Pounder Rail Industry Association Scotland
link

All our graduate and apprenticeship schemes last for three years. If we have in-year funding or year-to-year funding, it is hard to commit every year to taking on apprentices and graduates, given that we need three years to train them, get them through their qualifications and mentor them again after that. A pipeline is therefore brilliant. A funded pipeline would be absolutely great, but we need to be really aspirational and look for it to be longer than even five years—to be for 10 years or more—and at what a pipeline would look like and how far in advance we could get a funded pipeline, because looking at things from year to year really constrains a lot of companies and businesses.

Russell Jackson Railway Engineering Institution
link

To build on that, and as a positive example, there are five-year alliances for track renewals, which are partnerships of Network Rail, a contractor and a designer. Those alliances enable much investment in people, which Lee Pounder has talked about—in junior people coming through—but also in things such as technology, innovation and efficiency. The repeatability of the work means that people learn. They work out what the challenges are, they are able to solve those and they are able to spot inefficiencies for the next project in that alliance. They can apply those learnings. Network Rail and the team can invest in and explore innovations because there is a long-term platform—a long-term contract with five years to run—in which relationships for the delivery and implementation of innovation can evidence those things alongside the efficiency challenges that such contracts try to solve.That is just one example. Another concerns the programme of electrification that has happened in Scotland. That programme has one of the best track kilometre efficiencies for electrification, which is a testament to that long-term pipeline. A funded pipeline for a rolling programme of electrification is enabling the public sector and the private sector to learn how to drive repeatable efficiencies.

Lee Pounder Rail Industry Association Scotland
link

We have integrated really well with Transport Scotland over recent years. The forward planning of Bill Reeve in particular, with the decarbonisation action plan and the rolling programme of decarbonisation, has led to Scotland having the most efficient delivery in the UK by about 33 per cent. We have gone from £2.7 million per kilometre down to less than £2 million. Again, the numbers and stats are there. That continuity drives efficiency and quality.What is really important is that we build on that and do not rest on our laurels.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

I will go back to a point that Lee Pounder made earlier about Winchburgh. From what you were saying, it sounded as though the slow decision-making process had added to the complexity of the project and the costs—and probably the delays. That strikes me as another example of where early engagement and communication with industry on how a project could be delivered are important but have possibly been lacking. Have you any thoughts on that?

Lee Pounder Rail Industry Association Scotland
link

Yes. I would say that it is an example of where things have gone wrong. Contractors have had early engagement with key stakeholders, Transport Scotland and local government, but what has been really lacking is one controlling mind or decision maker. That has led to indecision, which has led, in turn, to conflict over who pays for what and who owns what asset. That scenario has perhaps been unique. However, with regard to the fundamental outcome of the process, I think that the answer to the question whether there was a need for a station and whether that station needed to be at Winchburgh to service the community was always known. The answer was yes, it was needed. At that point, it became about driving that outcome and that conclusion.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

So, we are still waiting for a station, partly because of how things were set up in those early days, the relationship with the developer and so on.

Lee Pounder Rail Industry Association Scotland
link

That is correct.

Russell Jackson Railway Engineering Institution
link

I completely agree with Lee Pounder about that decision making. The only thing that I would add is that stations are part of the community that they are in. Therefore, the local government angle with regard to the future plans for the area needs to be built in, too.However, what Lee said is exactly the case. That cannot be allowed to change things as you work through the project; you have to get that buy-in from stakeholders really early and then move forward with delivery. If you try to change things later, those late changes are very much blows to efficiency and the ability to deliver.

David Macdonald Civil Engineering Contractors Association Scotland
link

Let us go back to the question that the convener asked at the very start, about how we can speed up these contracts. Consultation is everything. With a lot of these projects, not enough work gets done with regard to the hearts and minds of the local communities, and people find that, when they get to a certain point, the local communities start pushing back and do not accept the project. The planning gets pushed back, and jobs get pushed back, too.Our perspective is that, if there were more collaboration with the local communities and the stakeholders at the start of these projects, there might be less challenge, and that would shorten the time it takes to get them from cradle to grave. We feel that that would make a big difference.

Lee Pounder Rail Industry Association Scotland
link

There are other successes that we could mention, such as the Borders line. Since the reopening of that line, the economic growth that has happened along it has surpassed all of our outcome expectations. The story, really, is this: if we build it, it will be successful and people will come. I think that it is a huge testament to making the right decisions at the right time.

Russell Jackson Railway Engineering Institution
link

I know that it is just south of the border, but the Northumberland line is a similar kind of scheme that, again, exceeded all expectations very early on in its life. Such projects can be real success stories when they are done as well as they have been.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

Thank you for highlighting those examples. That is all from me, convener.

Iris Duane Green Glasgow
link

Actually, the issue that I wanted to raise has already been touched on, so I will cut some of my questions short. I thank the panel for their time, and it is nice to see David Macdonald again.Russell Jackson and Lee Pounder touched on the decarbonisation and electrification of our rail network, which we are aiming to achieve by 2045—a later date—and it was good to hear their positive comments on its efficiency. Can you expand on that? Are there improvements that the Scottish Government could make in its approach to make things even more efficient, or have we already hit the top tier?

Russell Jackson Railway Engineering Institution
link

It is a really good question. It is important that we continue to back that pipeline. In addition, what needs to be made clear, well in advance, is the future direction of electrification, where you want discontinuous electrification and, indeed, where you are not going to electrify things. Those are the two things that will enable the supply chain to understand the Scottish Government’s investment plans and how electrification fits into them.I think that increased efficiency comes from continuing to do what you have been doing, and my ask would be to not waver from the path that you are already, and very successfully, going down.

Lee Pounder Rail Industry Association Scotland
link

I would say in support of Russell’s remarks that major advances have been made in discontinuous electrification and battery electric trains—or BMUs, as we call them. Deploying partial electrification on suburban, non-congested or non-intercity routes to progress electrification and decarbonisation is absolutely the right strategy. That allows us to focus on where we need full electrification, to get the outcomes and schemes right, and to drive further efficiencies in those schemes.However, to take on board Russell Jackson’s comments on what I said earlier, we cannot rest on our laurels. We have done well to get to where we are. Do I think that we can do better? Yes, I think that we probably can, but that requires continued investment and an industry that is confident that we will back the pipeline, get the necessary skills and let innovation drive us forward.

Iris Duane Green Glasgow
link

That reflects what we have heard from previous panels—namely that confidence in the Government’s direction really helps the industry.I will pick up on something that you said about partial electrification, especially on suburban routes. You have probably seen that, in March, ScotRail announced that it will replace 22 diesel-powered trains through an £80 million refurbishment programme, supported by a further £67 million investment from the Scottish Government. Those are transitional trains. They are not electric trains; they are still diesel powered. Is that a good use of public money, or would it be better if that investment were put into speeding up electrification and rolling out greater battery use?

Lee Pounder Rail Industry Association Scotland
link

We currently have the oldest fleet in the UK, so we need to do something with our rolling stock. The partial strategy is a good approach. It allows us to get to a semi-state more quickly and efficiently, enabling us to consider where we have genuine constraints and where we will require interventions. An obvious example is Dock Street tunnel as you come out of Dundee station. Electrifying the line through the tunnel would require extensive spend and engineering considerations, so having a partial solution that does not require electrification through the tunnel is, certainly in the short term, the right strategy for the industry.

Russell Jackson Railway Engineering Institution
link

We are talking a lot about infrastructure, but, ultimately, this is about benefits for passengers. If we can improve the passenger experience to drive greater use of rail and encourage modal shift, that is a good thing.

Iris Duane Green Glasgow
link

That is positive.I will move away from the net zero issue and focus on the passenger experience. We know that some of the oldest rolling stock, as we have discussed, will be cascaded to rural routes, which was not, of course, the initial vision. Train journeys showcase our fantastic natural environment, but we had hoped to see newer trains introduced, which would ensure that passengers are comfortable, because some of the existing rolling stock is not the best and can be quite cold.Is the Government’s approach to recycle very old rolling stock for redeployment on more rural routes a good one, or would greater investment in newer stock, or in refurbishing less old stock, be better?

Russell Jackson Railway Engineering Institution
link

I am not well informed on that, so I will simply say that it is dependent on considering the whole-life cost and ensuring that any decision is data driven.

Lee Pounder Rail Industry Association Scotland
link

I take a similar view. I think that we all recognise that new electric or bi-mode trains are cleaner, greener, more comfortable and provide a greater passenger experience. The question is probably where investment has the greatest effect when you consider the whole-life costs and the wider strategy.In the short term, some tough decisions might need to be taken about where you deploy some rolling stock that still has life left in it, but the aspiration in the 2045 net zero mandate is really about bringing cleaner, greener trains into our country and infrastructure.

Iris Duane Green Glasgow
link

I have a slightly cheeky question. The initial vision was for decarbonisation to be achieved much sooner than 2045, and it was only relatively recently that the Government pushed that back. Could we achieve that faster?

Lee Pounder Rail Industry Association Scotland
link

I believe that the original mandate was 2045. I know that there was an aspiration to achieve it by 2035 when Nicola Sturgeon was First Minister. That might have been a little ambitious, if I am honest, but we need to be aggressive or assertive in our drive to deliver decarbonisation. We should not wait until the last minute; we should drive progress as quickly as we can.10:15

Russell Jackson Railway Engineering Institution
link

I agree with Lee Pounder on that. All I would say, though, is that, not just in Scotland or the United Kingdom but around the world, we have seen a lot of boom and bust and trying to accelerate things overambitiously. Supply chains have a natural tendency to say, “Yes, we can do that”, but we are then relying on a limited talent pool of people with relevant experience and capability, which is going to increase the risk and the pressures on successful, cost-effective, on-time delivery of those outcomes.It is right to be ambitious and to try and push, but there is a limit to that. A steady pipeline of work enables efficiency.

Iris Duane Green Glasgow
link

Yes, I agree. I am sure that we are all concerned—although it is perhaps not a matter for this committee—about the need to ensure that we have the workers and the skills in the country to deliver that.I will move on from rail—I thank you for your contributions. I have a couple of very short questions for Scott Grant and David Giles, which follow on from something that I asked about last week. When we are looking at upgrading our roads and making sure that they are kept in good condition, we need to get the money from somewhere. The UK Government recently introduced a bill that would allow private companies to upgrade our roads, but they could also charge a levy on them. Is that something that you are supporting in your respective roles? Alternatively, are you against it, or is there perhaps a path through the middle?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

We have seen previous examples of road user tolls. The important point to consider for the public purse is the value of that. Wales has used the investment model; I understand that Transport Scotland looked at that for funding sections of the A9 and so on and it would have been more expensive to the public purse. It depends on what the situation is with international money markets and how attractive it is at that point for seeking private investment in roads.We would welcome increased investment in transport and making our systems more resilient, as we have talked about throughout the discussion, but there is a public element to road user charging, and the Government would need to consider the impact of that on the road user.There is a focus on roads, but there is—as has been mentioned with regard to rail—a need for modal shift to get people out of their cars, especially for short journeys, and to walk or cycle and look at alternatives to jumping in their car outside their front door. There is probably better justification for investment in active travel for the first and last mile and looking at an integrated transport solution. For example, when we are talking about rail stations, we need to think about how people get from there to their homes. If we can look at that in terms of modal shift away from the car to active travel and more sustainable forms of transport, it would have significant benefits for addressing health, social exclusion and so on. There is a wider benefit to modal shift that is about more than purely carbon.

Iris Duane Green Glasgow
link

Absolutely. Do you have any reflections, David?

David Giles Asphalt Industry Alliance
link

My reflection is, first, that while—in the Asphalt Industry Alliance, clearly—we leave the funding to the politicians, changing the funding mechanism does not resolve the gap that has developed in England and Wales, where there is a £19 billion maintenance backlog. Simply shifting the financial model is not going to change the fact that the backlog is there. Costing that in, for a private company, is going to be a very big ask. I therefore respectfully decline to answer your question with an opinion.

Iris Duane Green Glasgow
link

That is okay—the matter is complex, of course, and we do not know what such a measure might look like when it is rolled out. We do not want to not help our constituents by putting it in place—the roads might get fixed, but then they might not have access to them.I will leave my questioning there, convener.

Willie Rennie LD The Convener · Fife North East
link

I am conscious of time—we still have two members who want to ask questions, so I ask everyone to keep things a bit tighter if we possibly can. We go to questions from Zen Ghani.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

I will focus on Great British railways, which comes up in the Railways Bill that is currently going through the House of Commons. A few concerns have been outlined in various places by various bodies and people. From your perspective, what impact do you expect that the establishment of GBR will have on Scotland’s rail supply chain, in particular in relation to things such as procurement and contracting arrangements? Is there a risk that decision making could become a lot more centralised, thereby making it harder for Scottish suppliers to access opportunities? Perhaps Lee Pounder can start.

Lee Pounder Rail Industry Association Scotland
link

There is a little bit of uncertainty around GBR at this moment in time. The discussions that we have been having with relevant stakeholders indicate that there will be no change to the devolved powers. That is hugely important—we have already touched on some of the successes in Scotland and how we are leading the market, or leading the UK, so it is crucial that the decision making stays in Scotland in order that we can protect our supply chain.RIAS has more than 480 members, and 60 per cent of them are small and medium-sized enterprises. We need to ensure that we can get all those SMEs into market positions as we go forward, and that is best served by keeping the decisions here in Scotland.

David Macdonald Civil Engineering Contractors Association Scotland
link

Building on what Lee Pounder said, CECA represents 115 companies in Scotland, and the majority of them are SMEs. They are really the engine room behind a lot of these projects, so ensuring that they are suitably looked after is key for us.

Russell Jackson Railway Engineering Institution
link

Track and train in Scotland are already intimately interconnected and have been so for a while, so it is good to hear positive reassurance that the changes that come through GBR should be relatively modest for Scotland. That is great for the programme of work that we have.As Lee Pounder said, that devolution looks like it should continue and should be relatively unaffected. I would just say, however, that there is some nervousness around uncertainty and how that is going to affect future pipelines of work. Provided that that aspect is maintained in Scotland, however, that would be a fantastic outcome.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

Could the creation of GBR have any implications for Scotland’s rail engineering sector?

Russell Jackson Railway Engineering Institution
link

It is a bit early to tell. We need to look at the scope of what is going to be devolved versus what is going to be more centrally led—and some stuff needs to be centrally led, because of consistency of standards and materials and equipment and so on. Until that comes out, it will be hard to say definitively.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

David, do you have any thoughts on that one?

David Macdonald Civil Engineering Contractors Association Scotland
link

No.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

That is fine.How prepared is Scotland’s rail industry for the transition to GBR? Are there any outstanding issues around how the new organisation will operate? I know that the detail is still quite vague, but do you think that Scotland’s rail industry is ready for that transition?

Lee Pounder Rail Industry Association Scotland
link

Yes, I believe that it is. Again, if we look at the Scotland’s Railway brand, we see that we have proven that we can successfully stand on our own two feet. The powers, and the processes and people, that have been put in place are robust. The one big uncertainty of which we need to be mindful will involve any of the cross-border services and how we react to or interact with them. How do we make decisions on cross-border requirements? That is probably the big unknown at the moment, certainly in my sphere.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

What have your members said about that?

Lee Pounder Rail Industry Association Scotland
link

Again, it is just the uncertainty. I do not think that a clear blueprint is yet in the public domain. I know that there are aspirations about GBR going live as of 1 January 2027, but what does that actually look like and what does it mean? There are still many more questions than answers at the moment.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

Do you expect GBR to have an impact on funding opportunities in Scotland?

Lee Pounder Rail Industry Association Scotland
link

That is the huge piece of devolution that we want to maintain, so that we do not have to go back to Westminster or the DFT to sign off every scheme. We have good momentum in Scotland, and we want to keep it going and, indeed, grow it. Adding another layer of decision making can be only detrimental. Again, as we touched on with regard to Winchburgh, we need to try to keep as much control as we can, certainly with regard to funding and decision making.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

Absolutely, and I think that adding another layer of bureaucracy will just make things a lot slower and make it less likely to deliver in the timescales.David and Russell, do you have any final thoughts?

David Macdonald Civil Engineering Contractors Association Scotland
link

Going back to Lee Pounder’s comments, I think that putting this down to Westminster would have an impact on our supply chain. We have the supply chain in Scotland to deliver the work that is needed, and if another layer were to go to Westminster, that would, as I have said, have an impact on that chain.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

Absolutely. Russell?

Russell Jackson Railway Engineering Institution
link

I very much agree with what Lee Pounder and David Macdonald have said.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

There are plenty of political points that I could make, but I will not do so.

Willie Rennie LD The Convener · Fife North East
link

Thanks very much. Saving the best to last, I call Amanda Lindsay.

Amanda Lindsay Reform Central Scot and Lothians West
link

Thank you very much. We are almost done, but I have a couple of final questions.The Scottish Government intends to bring Transport Scotland back into the core Scottish Government. What changes to administrative structures would you like to be made as part of that exercise, with a view to improving project delivery and road maintenance? I do not know who wants to take that first.

David Macdonald Civil Engineering Contractors Association Scotland
link

Do you want to take that, Scott, or shall I?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

You go first, and I will see if I want to take it. Laughter.

David Macdonald Civil Engineering Contractors Association Scotland
link

If that were to happen, we would not want to see more bureaucracy, and we would not want it to take longer to get projects on the ground. I do not know too much about where things are, whether this is going to happen and how far away it might be, but I think that we in industry have moved into a fairly solid place with Transport Scotland. We talk a lot and we collaborate. As I have said, we were talking the other day about early contractor involvement, or ECI; it is new on the radar, and we would not want it to be jeopardised in any way if responsibility for it moved under the Government.

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

It is important to recognise that Transport Scotland only looks after the trunk road network in Scotland, and I have to say that the condition of that network is pretty good compared with the local road network.I understand that the better surfaces fund would be directed more at local and side roads rather than trunk roads. If we are talking about improvements in the condition of the general road network, there is a question about the size of some local authorities and their ability to deliver road maintenance, given the funds that they have and the competing priorities that they face, especially in rural communities. Our membership has a view about the old regional council model, with the direct labour organisations; a lot of local authorities do not have that sort of thing and instead have to bring in the private sector to deliver these schemes on the ground. Therefore, there is possibly a question to be asked about the local government side of things rather than the Transport Scotland side, given its record in delivering outcomes and the fact that the trunk road network and associated assets are actually in a pretty good state of health compared with local roads.

Amanda Lindsay Reform Central Scot and Lothians West
link

That actually leads nicely to my next question, which is about the Scottish Government's proposed programme of significant local government reform, possibly reducing the number of councils from 32 to between six and 10, supported by a large number of community authorities. What impact might that reorganisation have on road development and maintenance?

Scott Grant Chartered Institution of Highways and Transportation Scotland
link

I have already mentioned the issues faced by some of the smaller local authorities. If we are thinking about the roles that a local authority has to fulfil, I would go back to the earlier point that was made about skills and the resources that we have. It is a very simple piece of maths: if you need only one role across 32 local authorities, you might have an opportunity to make reductions or potentially to improve the quality of some of the outcomes from those roles. Obviously efficiencies of scale can be achieved, too, through resource pooling with regard to the plant and equipment that local authorities carry, their buying power and their ability to deliver bigger programmes of work with an increased budget.I come back to the earlier point about the multiyear funding model. If the rationalisation of authorities into bigger regions were to happen alongside such a model, significant improvements could be made to the road assets that we have and the local authorities’ ability to eat into the backlog that David Giles mentioned earlier.

David Macdonald Civil Engineering Contractors Association Scotland
link

If such a move meant a smaller funded pipeline, we would certainly support it, because it would give us that pipeline. Again, though, there will be pros and cons with regard to buying power, procurement power et cetera, and we would need to see that detail.

Willie Rennie LD The Convener · Fife North East
link

I thank everyone for the very concise answers to our questions. I think that you have certainly educated us about the sector, the successes that you have already secured and the improvements that need to be made. We do appreciate that, and I hope that you will continue to follow our work in this area.That brings us to the end of the first of this morning's evidence-taking sessions. I thank the witnesses again, and I will briefly suspend to allow for a changeover of witnesses.10:31Meeting suspended.10:35On resuming—

Willie Rennie LD The Convener · Fife North East
link

I welcome our second panel of witnesses. Thank you for coming back to the committee.Joanne Maguire is managing director of ScotRail, and Liam Sumpter is managing director of Network Rail in Scotland. If we could keep our questions and answers as succinct as possible, that would really help.

Lloyd Melville SNP Angus South
link

Good morning. Joanne, you confirmed to the committee on 16 September, when you were last here, that ScotRail had received over 3,000 complaints regarding the launch of the app. Your letter to the convener yesterday said that the number of complaints had reduced. What does that look like in practice?

Joanne Maguire ScotRail
link

Good morning, and thank you for the question. As of Monday 2 November, we had had just over 5,500 app-related complaints in total, and we know that that is absolutely not good enough. Again, we apologise to anyone who has been impacted.There is some good news on the app: it is now in steady state. In fact, we now have more registered users of our new app than we did of the previous app. In June this year, 806,500 users had the app installed on their phone or mobile device, but we currently have 871,000 users, so about 65,000 more devices have our new app installed. About 128,000 people use the app on a day-to-day basis. The figure for the previous app was about 113,000, so we are seeing positive progress.

Lloyd Melville SNP Angus South
link

Thanks very much for that. You also told the committee on 16 September that some of SilverRail’s staff were based out of your office in Glasgow. Are they still there?

Joanne Maguire ScotRail
link

They are not physically there, but we are in regular contact with SilverRail. We have been pleased to get the app to steady state. The next evolution is to launch some improvements to the app.

Joanne Maguire ScotRail
link

Certainly. Some of the improvements involve push notifications. For example, there was a storm a couple of weeks ago, and we would enable a push notification for that. If you allow it, you will get a pop-up on the front of your screen. We are also considering capacity. People can see how many carriages will be on the train that they are going to travel on. A further evolution will be to see how busy the specific train that they are considering catching is.Another area that we have been asked about a lot by the public involves connecting flexipasses to kids for a quid. Kids for a quid is very popular, but people can only buy those tickets in person at the moment. When the app recognises that someone has a flexipass, they will be able to buy up to four tickets for children to travel with them for £1. That is just a flavour of some of the improvements.

Lloyd Melville SNP Angus South
link

Thanks. Your letter to the convener yesterday set out that there are still issues relating to some iPhone users. Has SilverRail given you an indication as to how long that might take to resolve?

Joanne Maguire ScotRail
link

SilverRail is working very hard on it, but it has not given us a timescale. Just to give you a flavour, as of this morning we have had four contacts to social media about our app, which is a very small proportion of our daily contacts. I preface this by saying that I am speaking as a non-technical person, but the challenge is to do with your iPhone locating where you are. When you move between 4G zones—literally as you are walking down the street—it is trying to reconnect you and is logging you out. However, that concerns a very small proportion of iPhone users, and we are working to get a fix for that.

Lloyd Melville SNP Angus South
link

I am glad to hear that the app is more stable.I will move on to infrastructure and climate resilience, which we touched on with the previous panel of witnesses. I will start with Liam Sumpter. In its most recent control period, Network Rail changed its approach to maintenance from cyclical to more risk based. Does that allow you to be more targeted and efficient in the way that you spend money?

Liam Sumpter Network Rail Scotland
link

Good morning. It is a good question, to which the answer is yes. When we initially go through the process of putting together our funding for a control period—as you know, we are halfway through control period 7—we assess what we believe needs to happen to the asset in order to maintain it at a sustainable and reliable level. We match that with the available funding and then decide on the treatment that we will give the asset in order to achieve the outcomes that the Scottish Government has specified for us.As we have gone into this control period, we have balanced the different types of work that we do. To give you a bit of a walk through, there are, loosely speaking, four different ways to treat the infrastructure. First, you can do a full renewal, which involves going in and replacing everything. That lasts for a long time but costs quite a lot of money. Secondly, you can do a refurbishment, which is in effect a partial renewal in that you target only the components that are worst affected. It costs a little bit less money but lasts a little bit less time. Thirdly, you can do heavier maintenance, which involves going in and not changing any of the components but maintaining them more heavily. Again, that costs less but lasts less time. Fourthly, you can apply operational restrictions and do something different, which we prefer not to do.In this control period, we have moved from doing more renewals to doing more refurbishment and heavy maintenance, which allows us to target the areas where the infrastructure needs specific focus. That allows us, in particular, to respond to the emerging challenge of climate change, the impacts of which we saw only 10 days ago.

Lloyd Melville SNP Angus South
link

I want to discuss climate change a little bit later. On the previous panel, Lee Pounder of the Rail Industry Association talked about access for maintenance. For example, the Fife circle line was closed for 18 days but managed to achieve, in Lee’s words, six months of work at a 50 per cent efficiency rate. Are you looking to set that model as standard in your future approach to maintenance?

Liam Sumpter Network Rail Scotland
link

First, I concur with Lee Pounder’s assessment. That is exactly the rate that we think that you could get from such a blockade. We always need to consider the balance. Lee was absolutely right in that there is certainly a saving that comes with closing the railway for a prolonged time, because you are not on-tracking and off-tracking machines in and out of the site. You can have staff work 24/7 rather than bringing them in for short access periods, which might be for as little as three or four hours overnight. There are clearly some benefits to doing that, but if you take that approach, you cannot run trains at all in that time, which impacts communities and people who need to get to places, and it also impacts revenue.We consider that model in all our infrastructure work. We engage with our train operators, notably ScotRail but also cross-border operators, as part of a process that we call the decision impact assessment model—the DIAM—which allows us to look at major infrastructure work and determine the cost implications of different choices.When it comes to Fife and future heavy activity, we will look at what the base-level costs would be for a 17-day or 18-day possession, what savings that approach would bring to the project, the cost that it would bring in lost revenue and the cost that it might bring to the local community, which is sometimes a bit more difficult to measure. We will go through that process with the train operators and with Transport Scotland in order to make, I hope, the best overall decision for the project, but also for the net impact that it has on Scotland.

Lloyd Melville SNP Angus South
link

Thanks very much for that. That was really useful.I will touch on finance, because I can see in your annual efficiency and finance assessment, which was published on 30 September, that Network Rail reported a £37 million financial underperformance against its year 2 CP7 delivery plan. Can you give us a bit of context around that?

Liam Sumpter Network Rail Scotland
link

When looking at our delivery plan, you have to look at the plan across the five-year period. We have a plan that amounts to £4.2 billion across that timescale. In each of the five years, we have an allocated amount of money that enables us to achieve the outcomes that are set for us by the Government. The key outcome is that we deliver our overall renewal portfolio, which is worth about £2 billion of the £4.2 billion. Inevitably, there will be some movements between those years, as we balance the overall plan across the five years.10:45

Lloyd Melville SNP Angus South
link

You do not think that it is particularly significant.

Liam Sumpter Network Rail Scotland
link

It is not significant.In order to, I hope, satisfy what you might be asking, I confirm that we will achieve our full renewal portfolio over the course of the five years. We will probably outperform it and deliver more than 100 per cent of our stated renewals in that timeframe. Scotland will get value for money from what we do in this five-year period, which is not always the case elsewhere in Great Britain. It was not always the case even in Scotland. However, in this five-year period, we will deliver everything that we said we would.

Lloyd Melville SNP Angus South
link

I will turn to climate change, which was brought up earlier. We have seen lots of severe storm events; it seems that the pace of them is increasing. What impact has that had on your infrastructure, Liam? Are the budgets to accommodate that there?

Liam Sumpter Network Rail Scotland
link

I go back to the funding process. In control period 7, we are spending £2 billion on renewals, roughly £400 million of which is targeted specifically at climate resilience activity.We understood from the way in which the climate was changing in Scotland before this control period that it would inevitably be a growing challenge for us. As we set out the plans for CP7 five years ago, working with Transport Scotland, we therefore ensured that we embedded in a large amount of funding to deal with climate change. That activity is focused on things such as improving drainage, improving embankment stability and removing trees. We are delivering all of that activity on schedule: we are halfway through the control period and we have delivered half of the work. That is having a largely positive impact on how we maintain and manage the infrastructure.Five to seven years ago, we would routinely have flooding events across the network during each such storm, as well as landslips. We would typically have between four and six landslips a year. So far, in the past 18 months to two years, I do not think that we have had a landslip, and the incidents of flooding are way down, despite the fact that the climate context is getting harder. That £400 million investment is making a difference. We are removing sites that have a propensity to flood during drainage, we are removing trees that can come down in high winds from the line side, and we are improving the stability of our embankments so that they do not slip on to the infrastructure.However, there is a lot more to do. Climate change is the challenge.

Lloyd Melville SNP Angus South
link

Is that £400 million sufficient, or would you like to see more from the Government?

Liam Sumpter Network Rail Scotland
link

That £400 million is sufficient for the current control period. We are doing a lot of infrastructure work, which is being successfully delivered. As I said, we are seeing the benefits of it.However, we are now embarking on the process of looking at our funding for the next five-year process, which, confusingly, will be called funding period 1, rather than control period 8. Funding period 1 is the five years from 2029 to 2034. Right now we are engaging in a series of workshops through which we are talking to Transport Scotland, and to colleagues in ScotRail and across the Scottish Rail Holdings group, around what the next five years need to look like. As part of those conversations, we will set out what we believe needs to happen in the context of climate change, how we can manage that and how that will progress over the next five years.

Lloyd Melville SNP Angus South
link

Joanne, what is the impact of severe weather events on ScotRail? I assume that you lose quite a bit of revenue.

Joanne Maguire ScotRail
link

I will start by saying that we take the approach that we will never apologise for putting safety first. We are very clear that all our decisions around severe weather events are made absolutely on a safety-first basis, which I know that Liam Sumpter supports. For example, during storm Boelo, we had a 50mph speed restriction across the entire network for part of the Sunday.We see an impact on revenue. However, we take the approach that we want to minimise customer disruption and keep everyone safe. We communicate early, and we aim not to take anyone to somewhere that we cannot get them back from, because we know that that is important to people. That is the approach that we take.Overall, if we set aside severe weather, working with Network Rail, we are collectively delivering nine out of 10 of our trains on time across the year. Recently, Liam and one of my team were asked to go and talk about that at the network performance board. Collectively, Scotland was held up as—I would go as far as to say—a star performer in terms of what we are delivering for our customers in the context of the UK rail landscape, which we should be proud of.

Lloyd Melville SNP Angus South
link

Positive though those numbers are, I would like to stick with the issue of weather disruption. Do you plan for the revenue implications of such disruption ahead of time?

Joanne Maguire ScotRail
link

Absolutely. When we carry out our budget process each year, we look at the impact of such disruptions. We are experiencing more named storms each year, and—dare I say it?— we experienced some very warm weather during the summer, which can be disruptive, so that is part of our revenue-planning process.

Russell Jackson Railway Engineering Institution
link

I would have to check, but, from memory, we allocated £10 million in the current year’s budget for that. There are different rules for when the railway is closed and for when we put different restrictions on.

Willie Rennie LD The Convener · Fife North East
link

I want to return to the issue of blockades. Who decides whether something requires a blockade or overnight works?

Liam Sumpter Network Rail Scotland
link

We make a joint decision. I mentioned the DIAM process. We will set that out in advance—sometimes the process starts two years or more before any planned work—working with train operators and Transport Scotland to determine what will deliver the best overall impact for the railway.Ultimately, under the current regime, Network Rail must seek permission from the train operators for anything out of the ordinary to close the railway. The train operators are then compensated for that closure through the schedule 4 regime part of the track access contract. We will work hand in glove—seamlessly—to come up with the best overall solution for the network.

Willie Rennie LD The Convener · Fife North East
link

You both agreed on the Fife blockade?

Liam Sumpter Network Rail Scotland
link

Yes.

Liam Sumpter Network Rail Scotland
link

I was not in the discussions, but yes, in order for us to get to a position in which we have a blockade, there must be agreement on the right approach.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

I will start by asking about the fire at Glasgow Central station earlier this year before moving on to questions about Great British railways.What have been the main operational impacts on Network Rail and ScotRail of the fire, and what lessons have been learned about managing that significant disruption, given that Glasgow Central is one of Scotland’s busiest stations? Can I put that question to Joanne first?

Joanne Maguire ScotRail
link

Of course. I will then pass on to Liam Sumpter, because Network Rail operates two stations in Scotland: Glasgow Central and Edinburgh Waverley.The fire was devastating for Glasgow as a whole. We could not believe the scenes unfolding from the Sunday afternoon into the early part of the following week. Lots of small businesses were significantly impacted.The railway came together with the emergency services in the first instance, and then with local authorities and other partners. We are still working our way through the process of full recovery for the area around the station.We were very proud of the fact that we got the station up and running so quickly, that we got part of the station accessible and that we could resume some services in the very first week after the fire. Actually, lots of people enjoyed the nostalgia of walking up the old carriage driveway. I remember from my childhood that you could drive up it.There was lots of innovation and teamwork between ScotRail and Network Rail, especially in those first days as we recovered and worked to get the full service up and running. The impact was massive. The circumstances were outside our control, but we probably recovered more quickly than we thought we would to begin with, and as quickly as we could for the customers whom we serve, especially those people who were trying to travel to and from work.

Liam Sumpter Network Rail Scotland
link

Everything that Jo Maguire said is spot on. Clearly, the fire had a devastating impact that was felt viscerally. As soon as it happened, the railway responded very well. We led the recovery part of the operation. We were engaged with partners not only across the industry but outside the industry, with the council and other bodies, to ensure that we got the station opened as soon as possible, knowing what a critical link it is to the rest of the country. Our response was very strong in that regard.On lessons learned, we are looking at what we could collectively do better. We have found out that we did a lot, that we have a playbook for such incidents and that we did everything that we thought that we would in an appropriate timeframe.Could we tighten things up? Could we do better? Of course we could—we always can after such an incident. We look at our relationships and how mature they are with other partners to help us move through these things even more swiftly. Predominantly, however, we did a strong job in getting Glasgow working again.I would also point out that the fire got very close to the Caledonian Chambers building, which is where ScotRail train crew are based. Certainly, we assumed at one point that the fire would spread into that building, which would have had even more devastating consequences not only for our ability to open the railway properly but for the rest of the building. Two or two and a half years ago, Network Rail refurbished the Caledonian Chambers building, and I remember looking at the costs and finding the fire defence activity that we were having to put in as part of legal requirements eye-watering. My goodness, though—what value for money that was in retrospect. We certainly learned a lesson about how modern buildings with modern fire resilience can protect our infrastructure—that is something that I have certainly learned in the process.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

That is encouraging to hear, and indeed the response from ScotRail and Network Rail was outstanding in the way that you got the station back up and running and in the support that you were able to provide to people across the Glasgow area.Were there any specific weaknesses in your contingency plans, or was there anything that you felt could have been a bit better?

Liam Sumpter Network Rail Scotland
link

Nothing jumps out, but there will be constraints in any system. I mentioned the Caledonian Chambers building, where ScotRail train crew are based. Because the fire was right up against that building, we obviously could not use it for train crew until we were allowed to by the Scottish Fire and Rescue Service, so train crew had to book on at a different location. That was an inherent challenge, because you need train crew to book on somewhere, get their marching orders for the day and so on. When that place is on fire and they have to go somewhere else, it inevitably adds something into the mix. I do not necessarily think that we would do that differently—it is just an inherent weakness in the system when you are facing an event of that magnitude.That is probably the only area that I would highlight, but it is more of an acknowledgement that, when you are facing something so devastating, it is going to have a sizeable impact.

Joanne Maguire ScotRail
link

Something that I would highlight is the great support that we got from SPT and First Bus in those very first days when services were not running. In fact, I used the bus, and I know that they were absolutely overloaded. They provided tremendous support.The lesson that I have tasked my team with learning relates to the proximity of Glasgow Central station to our head office on Waterloo Street, which some of you might be familiar with, and the fact that we were able to set up a temporary train crew base there. We did that not just for ScotRail; we extended the facilities to Avanti train crew who were booking on and to other cross-border train operators. Therefore, the task that I have given my team is to think about what plan B might be if the same thing were to happen in, say, Perth, Inverness or Aberdeen. Where would we be able to pull on those kinds of resources so quickly? After all, our ability to do that helped us massively.As you might imagine, when the timetable was restarted and things were partially running, we had to deal with a lot of movement of people who were not working their normal shifts to their normal diagrams, as we call them, which are all about the trains that they take every day and so on. We were helped significantly by being in such close proximity to space that we could use, and my learning from that experience is to do with how we can replicate that across the network.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

It is encouraging to hear all that. Hopefully, such a situation will never happen again, but if it does, you guys have learned a lot of lessons from the contingency measures that you put in place and your response to the incident.I want to move on to Great British railways. How do you envision Network Rail becoming part of GBR changing the way in which Scotland’s railways are, for example, managed or funded? In particular, how will decisions that are currently taken by Network Rail be made under GBR, and what safeguards will be put in place to ensure that Scotland retains sufficient influence over decisions that are being made?

Liam Sumpter Network Rail Scotland
link

I will start by setting out where we are in the process. The Railways Bill is going through Westminster at the moment. It has been through the House of Lords. Within that bill is provision for three different structural options for Scotland, which are that Scotland’s Railway could become a wholly owned subsidiary of GBR; Scotland’s Railway could become a joint venture between what is currently Network Rail Scotland and the operator, which could be the Scottish Rail Holdings group or ScotRail specifically; or we could deepen the existing alliance between Network Rail in Scotland and ScotRail. The decision on which option to go for is a matter for the Scottish ministers. Irrespective of that, the change to which you referred will happen, in that Network Rail Scotland will become part of GBR at some stage—in the next year, probably.11:00We are going through a process. We have established a transition leaders group, which has representation from ScotRail, Network Rail, Transport Scotland, Caledonian Sleeper, Scottish Rail Holdings and the Department for Transport. We meet regularly to look at how the arrangements between the organisations will work in the future. The reality in the context of the GBR change is, I think, that there will not be a lot of change for our working relationship in Scotland.You referenced funding. Scotland’s Railway will continue to be funded in the same way. The Scottish ministers will continue to own ScotRail. Fundamentally, things will not change.The relationship between ScotRail and GBR will need to adjust in the context of the overall change, but we are working through that closely. A number of accountabilities move around in the system, and we will make sure that, certainly, there is no adverse impact, and we hope that Scotland can benefit from the GBR change, irrespective of what structural change we end up with in Scotland.I see it as a real positive. I hope that we can build on the work of GBR and, as it goes through the process of deeper integration, learn from it things that we could replicate in Scotland when we have decided on the appropriate structure.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

A lot of the industry witnesses in the previous evidence session said that they felt that it would just add another layer of bureaucracy, with decisions then having to be made in Westminster in a much more centralised way. Do you have any views on that?

Liam Sumpter Network Rail Scotland
link

I do not recognise that at all. I do not think that more decisions will need to be taken at Westminster. As it stands, Network Rail Scotland is pointed entirely toward the Scottish ministers. They set a high-level output specification, which instructs me and my team what we must deliver across a five-year period. We are funded through that. We are generally scrutinised and held to account by Transport Scotland, with some support from the Office of Rail and Road. From that perspective, things will not change. No new decisions will need to be taken in Westminster that are not currently taken elsewhere in the system anyway.It is possible that those witnesses were referring to the area of access and use. GBR will in effect own access and use. However, how that works across the system is currently under a consultation that concludes in December, to which we will feed in the views of Scotland.However, I do not recognise that there will be any additional layer of complexity. In fact, part of the approach to GBR is to remove complexity. At the moment, multiple different train operators are working for the Department for Transport. Their being in one organisation with what is currently Network Rail will remove significant complexity from the system.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

Sure. Of course. The buzzword among people in the previous panel was, I think, “uncertainty” associated with GBR. It is interesting to hear where things are from your perspective.I will move on. Have there been any discussions between ScotRail and those establishing GBR about cross-border ticketing arrangements and how those would work?

Joanne Maguire ScotRail
link

Although ScotRail will not be a GBR operator, that does not mean that we are outside of any tent. For example, every four weeks I go to a meeting with all the other train operating company managing directors, so the same information is shared with all of us, whether that relates to talks on DFT ownership or outside of that, for example, in respect of Transport for Wales.There are ongoing discussions around ticket settlements—I am sure that all of you who travel with us will know that rail ticketing is not a straightforward matter—but no definitive decisions have been taken around, for example, ticket interoperability between ScotRail and other operators. However, we are very much part of those conversations.

Zen Ghani SNP Glasgow Cathcart and Pollok
link

What if GBR makes a decision on the wider network that ScotRail disagrees with? Is there any idea of what mechanism there might be for challenging that decision under the GBR arrangement?

  1. 09:15 Interests Procedure · 3
  2. 09:16 Pre-budget Scrutiny 2027-28 Evidence session · 348

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.