Graham Simpson Reform Central Scot and Lothians West
link

Well, Mr Day has done a sterling job; he has covered freight admirably. I have a slightly different question that is not on freight. This question may be for Mr Cook. Last week, we were keen to explore what happens when Transport Scotland is moved into the Government—

Willie Rennie LD The Convener · Fife North East
link

We will come to that later, if that is okay.

Graham Simpson Reform Central Scot and Lothians West
link

Right. Well, I have no further questions at the moment.

Willie Rennie LD The Convener · Fife North East
link

That is fine. We will go to Donald MacKinnon.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

I thank the panel. I will turn to rail in the Highlands.First, I will briefly pick up on Graham Simpson’s point about replacement of rolling stock. My understanding is that as the intercity rolling stock on the central belt routes that were discussed earlier is replaced, some of that rolling stock will be cascaded down to the Highland lines. At the moment, the trains servicing the west Highland line are as old as from 1987 to 1989. Those are already old trains that could be being replaced with stock that although not older is still hand-me-down trains from other parts of the network. Is that correct?

Joanne Maguire ScotRail
link

With regard to the replacement of our trains, intercity is up first. Our HSTs are some of our oldest rolling stock. That will be followed by suburban, and then we will be looking at a replacement of some of our rural fleets. Donald MacKinnon is absolutely right that, in the intervening years, we will be looking to move our rolling stock around so that the age profile overall will decrease. It is a bit like having an interim intercity fleet—it will be on an interim basis while we are replacing intercity and as rolling stock is moved.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

What does the timescale for moving beyond the interim period for the Highland lines look like?

Joanne Maguire ScotRail
link

As it stands, our new suburban fleets will be introduced in the 2030s, so we are looking at after that.

Joanne Maguire ScotRail
link

It is quite a while. For the new suburban fleets, it will take around five years from commencing a procurement exercise until we see trains in service. However, we are committed to looking at other improvements, and we have already delivered other improvements in the far north and the west Highland lines.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

In the interests of time, I will move on from that point.I was looking at reliability across the Highlands, and the far north line caught my eye. In 2025-2026, there were nearly 5 per cent cancellations on that route. In the past three years, that figure was more than 5 per cent, approaching 6 per cent in 2023-24. There are clearly some issues on that line, which push cancellations above the average.I am also aware of commitments, or at least discussions, in the past, about improvements to the line in the far north, particularly in relation to looking at a loop in Muir of Ord, which would improve reliability, the service and journey times, which is another issue on that line in particular.Could witnesses pick up on that point around cancellations on the far north line, as well as the wider point about improvements to rail infrastructure in the north and in the Highlands? In the interests of time, I will add the west Highland line to that question as well, as I am aware of some works taking place there.Perhaps Joanne Maguire could start, and then we could pick up with Network Rail.

Joanne Maguire ScotRail
link

Since coming into public ownership, we have been committed to improving performance across our network, and a significant amount of work has been done. The two biggest challenges for us on performance have been around the availability of our train crew—that is, our drivers and our on-train staff—and our ageing fleet, which the committee has touched on.With regard to train crew, we have focused on delivering driver training. With the backing of the Scottish Government, we are currently delivering the biggest driver training programme in the UK. We are training 160 drivers per year and, through that, we are reducing cancellations. Overall across the network, we are sitting at 2 per cent cancellations. That is a figure that many operators—especially those with as challenging a geography as ours—would bite your hand off for.Our fleet remains our biggest challenge. We have been addressing the driver challenge, and there are two ways in which we are addressing fleet. One is the fleet replacement programme. However, as you said, it will be years before some routes have new trains—they will have newer trains, but it will then be some years before they have new trains.With the backing of the Government, we are investing in a capital improvement programme, and we are doing improvement works on our existing fleet to improve reliability, which will lead to reductions in cancellations. We are also providing capacity in the number of seats that we have committed to.Across Scotland, 92 per cent of our customers tell us that they are satisfied. That is verified by Transport Focus, our watchdog—and, again, relative to other train operators, we have one of the highest percentages for a large operator. There is more to be done, but we have driven down cancellations while in public ownership, and we are committed to maintaining our commitment to driver and train crew training and to improving our fleets while we wait for our new fleets.I am sure that Liam Sumpter will want to talk about infrastructure.

Liam Sumpter Network Rail Scotland
link

Everything that Jo Maguire said is spot on when it comes to overall levels of reliability. We have very low levels of cancellation in Scotland compared with the rest of the network. We are really proud of that. We know that it is really important to our customers.So far, during this control period, we have committed and started to spend roughly £40 million on renewing parts of the infrastructure on the far north line—which is a significant investment for that line. That is for renewing what is currently there. You mentioned a potential enhancement of a passing loop, and Graeme Cook might want to comment on that.

Graeme Cook Transport Scotland
link

Liam has mentioned the enhancements so far. In phase 2 of enhancements to the far north line, Network Rail has worked on an outline design for the new passing loop that you mentioned. There is no funding for that this year, and any decision as to whether or not it is one of the next investments in the railway would be subject to affordability considerations and constraints. However, the work has been done to start to understand what it would take to build that additional loop.Lots of significant investments have been made in the Highlands. I will not list them now, convener, given the time.

Donald MacKinnon Lab Na h-Eileanan an Iar
link

Thanks for that. I have one final question before we move on, which is about accessibility at stations. The picture across the Highlands is not great; actually, it could be better across the whole country. I understand that 26 per cent of stations in the Highlands are fully accessible. The picture across Scotland is 37 per cent, as far as I can make out. What steps are you taking to improve full accessibility at stations in the Highlands, as well as across Scotland and the wider network?

Graeme Cook Transport Scotland
link

Accessibility on the railway is a reserved matter. That does not mean that the Scottish ministers or Transport Scotland are not interested. Funding comes from two sources and, ultimately, Network Rail and the GB side of the railway will decide which priorities come first. I will hand over to Liam Sumpter to talk further on that.

Liam Sumpter Network Rail Scotland
link

As Graeme Cook said, access for all is a Department for Transport programme rather than one that is funded by Transport Scotland. In effect, it provides a pot of funding, which is distributed across Scotland, England and Wales, to improve accessibility at a variety of stations. We generally deliver those improvements, which usually include step-free access at stations.At the moment, we are halfway through the five-year period known as control period 7. In control period 6, we delivered improvements at six stations to give step-free access. In the current control period, there will be less funding for that programme. At the moment, the only station that we have committed to that will get the full access-for-all treatment during this control period is Bellgrove station, although we have some funding to do a detailed design at Falkirk Grahamston as well.We know that there is less funding for that programme during this control period, so in order to supplement it, we have developed a railway for everyone programme across Scotland’s railway, which considers things that we could do in order to improve accessibility at our stations that are easier than the full access for all scheme. We look at all the stations across the entire network and the extent to which they are accessible from perspectives of getting to the station, moving around the station and getting on and getting off the train. We break that down to see which elements we can deliver in order to improve the overall quality of accessibility within existing funding arrangements in Scotland. That supplements the access for all programme.11:00There is a good example of that work at Dunbar. Recently, I was there with the cabinet secretary to look at a new footpath that has been put in place on one side of the station, which dramatically improves the station’s accessibility. That was supported through funding that came from the local council and other sources in order to improve the station’s accessibility, outwith the generally more expensive arrangements of the access for all programme.We did a lot of work in the previous control period. We are doing less work in this period because there is less funding. However, when we build new stations and do electrification projects, we also take the opportunity to improve accessibility, which I think that Jo Maguire also mentioned. When we did the East Kilbride project, we also improved accessibility and created step-free access at Hairmyres and the new East Kilbride station. We will do more of that when we are doing Fife and the Borders. We will also look to include more activity when we go beyond that, with the next stage of the rolling programme of electrification.

Willie Rennie LD The Convener · Fife North East
link

We are already out of time, but we have lots yet to cover. I hope that our witnesses will be able to stay a little bit longer.Before we move on, there was a report in The Times in November of last year entitled “Old, cold and dirty West Highland Line is going off the rails”. It described concerns from a lot of users about not just the age of the trains but the fact that they are cold and dirty. The first train in the morning, which I think goes from Glasgow, was called the “Polar Express”. Will that change this year? Will those trains be better maintained, clean and warm? Do you think that that will happen, Joanne?

Joanne Maguire ScotRail
link

I vividly remember reading the report at the time. We know that it is not good enough for customers. We have experienced heating issues with some of the fleets that serve that area. Our engineering team have been looking at new ways to ensure that we can provide a better passenger experience on those lines. We are making improvements for this winter for passengers on those lines.

Iris Duane Green Glasgow
link

I will move on to the issue of climate change, which relates tangentially to what Graeme Cook said about electrification. We have seen a significant amount of heatwaves recently in England and, to an extent, Wales. Although we will wait for the investigation to conclude, heatwaves may have led to the buckling of some train lines and disruption on services. I understand that ScotRail has a climate action plan. Could you dive a little bit deeper into what preparations we are making in case that starts to happen up here? Are we concerned that there will be continued levels of disruption due to changing climate in Scotland?

Liam Sumpter Network Rail Scotland
link

I am happy to answer that.Everything that you said is absolutely spot on. We are of course very sad to hear of the derailments that took place in England during one of the most recent heatwaves. We also had our own heatwaves here. Although they were not as hot, they are still a relevant factor for us, as Scotland also gets warmer.However, I think that we are ahead of the curve on climate change in Scotland compared to the rest of the network. We have started to see the impact of climate change on our railway for a longer period of time, most obviously, and most tragically, at Carmont in back in 2020.We have started to invest heavily in preparing our network in anticipation of the impact that climate change will have on the railway. I have already mentioned on a couple of occasions that we are roughly halfway through control period 7, which is a five-year funding period. The total expenditure of operating, maintaining and renewing the railway throughout that period is roughly £4.2 billion. Half of that expenditure—about £2 billion—will be spent on renewing the network and replacing what is currently there. Of that £2 billion, around £400 million is dedicated to climate change resilience activity. There is a lot of investment going into stabilising our earthworks, improving drainage and improving the resilience of our structures. That investment is generally a result of—and in preparation for—inclement weather in Scotland, particularly high levels of precipitation and rainfall.We are also investing £100 million—a significant increase on the previous funding period—in the removal of vegetation from the line side, because vegetation can have an impact during storms, for example by creating hazards for trains when trees come down. We are making good progress on all those activities.We are also reducing the number of railway sites that are susceptible to flooding, and we are stabilising our embankments. If you travel about on trains, you will see some of the innovative things that we are doing, such as the little vertical poles that pop up along the line side, which are earthworks monitors that will tell our control centre whenever anything starts to shift, particularly during inclement weather.Scotland is also the only part of Britain to have a dedicated weather operations delivery centre for the railway. There are meteorologists and weather and rail experts working together 24/7 to monitor in real time when weather patterns start to shift and to decide how we respond to that and what operational things we need to put in place to mitigate the impact.Although a huge amount of work is already ongoing, climate change marches on very quickly, and we will face more challenges. We are now commencing discussions on the next funding period, which will, confusingly, be known as funding period 1 rather than control period 8—do not get me started on that. When we go into those discussions, we will make the case for continued, ongoing and greater investment in climate change resilience. We will need to reflect on the heat that was experienced this summer, particularly south of the border, and whether that will require us to invest more in managing heat, which is not something that we have traditionally needed to manage in the same way as do our colleagues south of the border.

Iris Duane Green Glasgow
link

That is very helpful. You touched on something that I was going to pick up on, which is that climate change is anything but predictable, and we sometimes do not know exactly what will happen. Recent reports have indicated that we will now miss our targets for keeping the heat down. How far in the future do you look when you are trying to future proof the tech, and how adaptable will that work be? Things can change at the drop of a hat when new reports come out and we see the differing effects of climate change.

Liam Sumpter Network Rail Scotland
link

That is a good question, and the answer is that we look a long way into the future. For example, with coastal erosion—which is a feature in parts of Scotland, particularly on the east coast, where the railway is close to the coast—we make projections across a 100-year timeframe. When we made our first projections on coastal erosion, we set a range of possible scenarios that started with not much erosion and went up to lots of erosion. It has been about eight years since we first did that analysis and we are now right at the upper end of that range; we see more erosion than we had even anticipated in the worst-case scenario. There has also been an increased amount of precipitation throughout the autumn and winter seasons, and we expect that to be the case more often. We need to adapt quickly to those things.Therefore, we look far out across a long period of time when making our changing climate scenarios, and we try to plan accordingly. When we renew our earth structures, we plan to protect them for 30, 50 or 100 years into the future, rather than to just get through a few seasons.At the same time, we have to look at the short term. I am sure that members will have read about the super El Niño phenomenon that is likely to hit us. That is all about temperatures in the Pacific ocean, which will probably have an impact on our climate and specifically on our railway sometime in the spring of 2027. We are looking at what that means and what extra we need to do to prepare for the short term as well as the long term.It is a really dynamic environment. We have brilliant climate change experts in Network Rail who look at all the scenarios and what we can do to prepare the railway and help to prepare Scotland for that future. We work not only within rail. We learn from railways abroad that experience different types of weather, and we engage with other transport networks in Scotland, such as canals, and utilities such as water. We talk to all of them about the impact of climate change, because it does not affect only the railway.

Iris Duane Green Glasgow
link

If you will indulge me, convener, I have one more supplementary.You have anticipated my next question, Liam. In the short to medium term, for many people, climate change often feels tangential. In relation to things such as El Niño, do you expect significant disruptions to services? If so, are you considering communicating to consumers as to why that is happening or why we are unable to adapt?

Liam Sumpter Network Rail Scotland
link

Obviously, these things are difficult to predict. We do not know the scale of the challenge that we will face next year. We model scenarios, and we sort of expect windier and wetter weather in the late winter and early spring, and hotter air temperatures in the summer, which can lead to hotter rail temperatures. The extent to which that will affect Scotland’s railway is unknown at the moment, but we make our preparations in advance.It is far too early to say that we anticipate disruption but, when we get closer to the timeframe, if we think that there will be severe storms or extreme heat that we cannot cope with, we will look to communicate that. We will work with ScotRail to communicate that and to plan accordingly as best as we can. We have a good way of working on such weather events. We have a strategic meeting to consider how we will face into some of the events. For example, we will determine the range of outcomes that could happen from a storm and what we would do with the service. If we lose lots of the network because trees are down or because of something else, we consider how to reopen it and prioritise. We work hand in glove with ScotRail on that.Obviously, we communicate that to passengers as early as we can. Jo Maguire is always on my case during such events to say, “Let’s tell passengers early,” but I say, “We don’t quite know how things are going to work out yet.” We work together closely to try to model what the outcomes might be, to minimise service disruption and to give passengers as much confidence as possible about what is actually going to happen.

Iris Duane Green Glasgow
link

That is helpful—thank you. It is a deeply impressive system.

Willie Rennie LD The Convener · Fife North East
link

We witnessed your partnership working when we visited, so we recognise that. That includes the sticks by the side of the railway lines, as I call them, although they probably have a more sophisticated name than that.We will try to pick up the speed a little, as we have a few subjects left.

Lloyd Melville SNP Angus South
link

There has been an uptick in weekend rail travel as people are looking to get out and about for leisure purposes. Joanne, do you consider that weekend services are meeting that demand currently?

Joanne Maguire ScotRail
link

We absolutely recognise that, in a post-pandemic world, leisure travel is more important to us than it ever has been. We have had some really busy weekends. Just this year, we had the combination of the Edinburgh festivals and the Commonwealth games in Glasgow, which made for a busy summer for us, with some of our busiest weeks—and some of our busiest Sundays—since entering public ownership.We review our timetables twice a year, and we consult broadly on them across Scotland. I hold meetings in different parts of Scotland every six weeks or so. Two weeks ago, we were in Ayrshire and we offered to meet local MSPs, local councillors and other elected representatives. We consult broadly.On building the timetable, we have ambition to do more at the weekends, and specifically on Sundays.

Joanne Maguire ScotRail
link

However, we know that we need a whole-system approach, so we cannot look just at the ScotRail timetable, whether it be for Sunday or any other day, in isolation. When we consider running more services, we need to consider the impact on engineering and improvement works, which might be carried out at the weekend or overnight. We have spoken about freight. If we have ambitions to do more, we need to consider the possible impact on freight paths. We also need to consider staffing from a ScotRail and a Network Rail perspective.11:15Members might be aware that, when ScotRail came into public ownership, we made a public commitment to bring Sunday into the working week. Like most train operators in the UK, we run services over seven days of the week but staff are contracted to work largely from Monday to Saturday—so, six days of the week. We have developed a proposal, which is going through the necessary approval process. We would need to negotiate with staff on their terms and conditions if we were to ask them to work contractually on a Sunday. We would also need to increase the number of train crew that we have, to be able to deliver our train services reliably, as we would be stretching our resources across a seven-day commitment rather than a six-day one.We have an ambition to deliver that and are committed to doing so, because there is a revenue potential as well as the decarbonisation impact of getting more people on to the train and out of their cars on a Sunday.

Lloyd Melville SNP Angus South
link

I appreciate that. At Monifieth on a Sunday, the trains run past and do not stop. Monifieth is a small but growing community that has seen a big uptick in passenger numbers since services have expanded across the other six days. That is welcome, but, on a Sunday, trains stop at Broughty Ferry, go past Monteith, stop at Carnoustie and then keep going. Why can they not stop at Monifieth?

Joanne Maguire ScotRail
link

Stopping patterns are not dependent only on a train passing a station. There are many variables, including journey time and staff availability. We are certainly happy to take that issue offline. We have met Graham Simpson on more than one occasion to discuss that matter, and we are happy to meet you to look at the possibilities there. Unlocking Sunday and bringing it into the working week will be key to improving our Sunday timetable.

Lloyd Melville SNP Angus South
link

That would be useful, because the issue is a long-standing one in the community. You and I have had discussions about it previously, too.I will turn away from my constituency and towards late-night services, which are limited. I am aware that, when big events are on, ScotRail tries to run more services, which is much appreciated. However, people are looking for safe services so that, if they go out in Edinburgh on a Friday night, they can have a nice time and get back reliably. How are you considering building in later services as you evaluate the timetable?

Joanne Maguire ScotRail
link

That is a good challenge, and it is one that we have heard before. Again, I refer to the need for a whole-system approach. As most members are probably aware, a lot of our maintenance is done overnight, whether that is cleaning trains—I have seen the very hard work that our train presentation staff do to clean trains overnight—or other maintenance. Liam Sumpter’s teams also carry out work largely overnight, when the railway is not operating, and we should not forget that freight trains run through the night, as do services such as the Caledonian Sleeper.As we continue to deliver the biggest driver training programme in the UK, with 160 drivers a year, and unlock Sundays and include them in the working week, we can look at other possibilities. As I said, it is about whole-system change and what we can operate and when. Obviously, new fleets will give us opportunities to do things differently.

Lloyd Melville SNP Angus South
link

Convener, I do not know whether I have time to go on to performance.

Willie Rennie LD The Convener · Fife North East
link

We still have a few other things to cover, so we will move on, if that is all right.

Collette Stevenson SNP East Kilbride
link

I am delighted that East Kilbride’s rail enhancement has been showcased very well today. You answered quite a few questions on the rolling stock and electric trains. We have also touched on the project value of those infrastructure programmes, such as accessible clean toilets and clean carriages. When Graham Simpson and I met Network Rail in East Kilbride, we discussed the social value and the community benefits. Eleven young people were taken on during that time, as part of the rail skills academy. I am curious to know how they got on with regard to their employment. In addition, do you keep a register of the community benefits that you provide? I put that question to Liam Sumpter.

Liam Sumpter Network Rail Scotland
link

The rail skills academy to which you referred is one of the initiatives of which I am most proud within what we do in infrastructure. The East Kilbride project, much like the Levenmouth project, is delivered by a series of contractors—somewhere between six and eight of them, depending on the particular skills that we require. The rail skills academy enables us to bring on young people who perhaps would not otherwise have an opportunity to get into the industry and might not have much employment opportunity at all by giving them experience in one—or many—of those companies during the project. At the end of the project, or at a certain time during it, they are interviewed for permanent roles.To use your example of East Kilbride, all 11 of those young people managed to get a permanent role in the industry. That is transformative for their life experience, and we should all be very proud of that. We hope to continue that model with future projects, because we see so much social value in it. It is a brilliant thing, and we keep a record of all the community value that we bring through those projects. Somebody in my communications team is responsible for that. We would be happy to share with the committee after the meeting more details of exactly what it involves.

Collette Stevenson SNP East Kilbride
link

That would be helpful. Thank you.I have a quick question on future projects, specifically the Clyde metro. It has appeared in many transport strategies since way back in 2009, but there is still nothing. As Graham Simpson and I have alluded, it is just a squiggle, really. Are you aware of, or can you comment on, when it is going to be completed? When will we know the details of it? I am thinking particularly of the public, because it has been mooted for quite a while. Who is ultimately responsible and accountable for it? Will East Kilbride feature in that project as well?

Graeme Cook Transport Scotland
link

In November 2023, the then Cabinet Secretary for Transport, Zero and Just Transition endorsed the outcome of governance discussions around that project. At that time, it was decided that Strathclyde Partnership for Transport, supported by Glasgow City Council, would be the primary partner to look at delivering the Clyde metro. Transport Scotland performs an assurance role in that, which is about ensuring that any business case that comes forward is in a form that could be supported by the Scottish ministers and the necessary checks and balances that come with significant investment. It is up to SPT and Glasgow City Council to come up with that case for investment, and it is currently anticipated that it will be complete in mid-2027.

Willie Rennie LD The Convener · Fife North East
link

We go back to Graham Simpson.

Graham Simpson Reform Central Scot and Lothians West
link

I am going to ask about Winchburgh, but, before I do, I will go back to the Sunday service. Is getting drivers on a Sunday roster dependent on hiring new drivers on new contracts?

Joanne Maguire ScotRail
link

No, that is not part of our plan. Our plan is to work with the Associated Society of Locomotive Engineers and Firemen, which is a trade union that represents drivers. As you would expect, we have had ongoing informal conversations with ASLEF about implementing Sunday in the working week, because a very public commitment to that was made through our 2022 pay deal. As I said, we would need additional drivers as well as additional train crew to run Sundays in the working week contractually, but that would involve negotiating a change to existing contracts.

Graham Simpson Reform Central Scot and Lothians West
link

Is ASLEF being co-operative, or is it resistant to the idea?

Joanne Maguire ScotRail
link

We are very proud of the relationship that we have with all four of our recognised trade unions, which we have been able to work very hard on since coming into public ownership. We have very much been having conversations with ASLEF and meeting with it, which we do regularly, to develop a proposal to include Sunday in the working week.

Graham Simpson Reform Central Scot and Lothians West
link

That did not quite answer the question. Is ASLEF opposed to the idea or not?

Joanne Maguire ScotRail
link

ASLEF is absolutely not opposed to the idea. It will always be a negotiation—as it would be with any trade union. Through the pay deal, it has signed up—made a commitment—to including Sundays in the working week.

Graham Simpson Reform Central Scot and Lothians West
link

Good for ASLEF.I do not know who wants to answer this next question—perhaps Graeme Cook. There is a long-standing proposal to build a new station at Winchburgh. We have the business case but we do not yet have the money. Nobody has agreed to pay for it. Mr Cook, who is going to stump up for the bill, and when will there be a new station?

Graeme Cook Transport Scotland
link

As co-promoters of the new station, West Lothian Council and Winchburgh Developments Ltd retain the responsibility for its business case. The outline business case is broadly concluded, and the mitigations to address any risks within that will be covered by a final business case. Officials in Transport Scotland are investigating the financial options that are available for delivery, in advance of putting to the Scottish ministers an evaluation of those options.

Graham Simpson Reform Central Scot and Lothians West
link

What is the timescale for that?

Graeme Cook Transport Scotland
link

The advice will be going imminently. It is not quite ready yet. I cannot put a specific timescale on it.

Graeme Cook Transport Scotland
link

Yes.

Graham Simpson Reform Central Scot and Lothians West
link

So, that will be given soon. If ministers say, “Go for it,” when can we expect to see a new station?

Graeme Cook Transport Scotland
link

I am afraid that I do not know how long it would take to run tenders, establish the supply chain and so on. Perhaps Liam Sumpter could give an idea.

Liam Sumpter Network Rail Scotland
link

We would need to go through a detailed design phase, which would probably take about a year, before we would be able to enter into tenders and go to the delivery stage.

Graham Simpson Reform Central Scot and Lothians West
link

So, we first need the advice to ministers and then a decision from them before it goes out to tender. Somebody then needs to design it, which could take a year, and then we have to build it. All of that could take several years. Meanwhile, Winchburgh continues to grow and does not have a train service. That is not very good, is it?

Graeme Cook Transport Scotland
link

Since 2020, we have funded the railway industry to construct 24 new stations across the Scottish network. It takes a long time to perform the right due diligence and to make and carry out the right designs. Each has to be safe and robust, and we need to be able to demonstrate to taxpayers that it was the right investment. Achieving that takes time, but we have a significant track record of delivering new stations in Scotland.

Graham Simpson Reform Central Scot and Lothians West
link

I am not doubting that you have delivered new stations, but that one is desperately needed. I will leave it there.

Willie Rennie LD The Convener · Fife North East
link

We will excuse the pun of your “track record”, and we will conclude with some quick questions from Iris Duane.

Iris Duane Green Glasgow
link

I will be very brief, as I am aware of the time. Great British railways is a new and large factor in how we provide our railway service. Some of how that looks in Scotland will come down to political decisions at Westminster and here, at Holyrood. Very briefly, could whoever wants to take the question reflect on what would be the most effective way to integrate Great British railways with our existing services?11:30

Joanne Maguire ScotRail
link

In Scotland, we are proud that we have been trailblazers in how the railway works together. The convener mentioned that he had seen that in action when he visited our integrated control centre. The work that Liam Sumpter’s team and I do, day-in and day-out, to deliver the best outcomes for passengers is seen as trailblazing in terms of our alliance work.

Liam Sumpter Network Rail Scotland
link

I have worked in the industry for 23 years, and I am absolutely convinced that a more integrated railway is better. We make quicker and better decisions that are aligned if our incentives and reasons for doing business are exactly the same. It is not that those things are different at the moment, but the more clarity that there is on that, the better. I am interested in how we integrate.Earlier, we had a conversation about night-time services. In a more integrated environment, there would be an opportunity to consider whether we could run later trains to service the night-time economy in Edinburgh, for example. We could also stop services a little earlier on different days of the week or at different times of the year in order to ensure that we can still carry out the necessary maintenance work. We could do those things now, but it is complicated because of the industry’s arrangements. A more integrated railway should be able to make those kinds of decisions more dynamically and more easily. I am excited about what integration could mean for Scotland’s railway. We look forward to seeing how it plays out in Scotland.

Hannah Ross Scottish Rail Holdings Ltd
link

Like Joanne Maguire and Liam Sumpter, I am excited by the prospect of further integration of the railway and what it will mean for how we work together for the benefit of passengers and the taxpayer. I appreciate that the political decisions that you have referred to are often about the structure that is chosen as the basis of the integration, but it is really important that we look at the cultural change, because the structure will be what it will be. Building on the existing alliance work of both Network Rail and ScotRail in order to bring forward the integration and the leadership that we demonstrate in order to make it real will be key.

Graeme Cook Transport Scotland
link

We have heard from colleagues in Whitehall and from those at Westminster that rail reform has been inspired by the success of Scotland’s railway alliance. We have heard that again and again from significant figures. I am confident that Scotland is already benefiting from a more integrated railway and that we will further benefit when changes are made to the underlying legislation, to enable additional choices to be made to better integrate the railway.

Iris Duane Green Glasgow
link

It is nice to see that everyone is singing from the same hymn sheet. In the interests of time, I am happy to leave it there.

Willie Rennie LD The Convener · Fife North East
link

We will squeeze in one very last question.

Graham Simpson Reform Central Scot and Lothians West
link

I apologise for the late running of the train, but I am afraid that you will not be entitled to compensation. Laughter.Going back to the question that I tried to ask earlier, I want to get a sense of how you think the new arrangements for Transport Scotland might work in practice when it is brought into the Government. We were exploring that last week, but I am not clear how it would work on the ground. Does any of you have thoughts on that?

Graeme Cook Transport Scotland
link

Transport Scotland has played a pivotal role in transport in Scotland over the past almost 20 years, but policy shifts and the opportunities in public service reform, as well as the fiscal pressures, mean that it is time to look again, to see whether there are opportunities to do things differently.Two of the stated aims of the public service reform programme are to be more efficient and productive and to be more preventative. It is inevitable that having multiple layers of accountability in a system brings complexity and a degree of duplication of reporting. Removing a layer of reporting would provide an opportunity to release staff so that they can focus more on preventative work. I would say that that means that they would be more efficient and deliver the stated benefits of public service reform.

Graham Simpson Reform Central Scot and Lothians West
link

Which reporting layer would be removed?

Graeme Cook Transport Scotland
link

Transport Scotland reports to the Government. Our chief executive, Alison Irvine, is an accountable officer, which means that accounts have to be prepared and submitted to the core Government before being scrutinised by the core Government and considered by the director general. That layer of reporting would be removed by Transport Scotland moving into the core Government and the accounts becoming part of the wider accounts system. There would not be the same process of reporting on or scrutinising the accounts as there was before they were wrapped up into the Scottish Government’s accounts. That would be the opportunity to have a more efficient system by removing a layer of reporting.

Graham Simpson Reform Central Scot and Lothians West
link

Would we not have an accountable officer?

Graeme Cook Transport Scotland
link

The accountable officer would be the director general, and the permanent secretary would be the primary accountable officer. There would still be accountable officers and they would be accountable to the Parliament, but the change would reduce the number of reports and the layers of scrutiny. There is an opportunity to be more productive and more efficient.

Graham Simpson Reform Central Scot and Lothians West
link

I know that we will want to explore that further, but we do not have time now.

Willie Rennie LD The Convener · Fife North East
link

Collette Stevenson, would you like to ask a short question?

Collette Stevenson SNP East Kilbride
link

Graham Simpson is right that we need to look at it further. I take it that Transport Scotland is a registered charity.

Graeme Cook Transport Scotland
link

Transport Scotland is a non-departmental Government body.

Collette Stevenson SNP East Kilbride
link

Right. Okay. I take it that, when the transfer is made, staff will be subject to the Transfer of Undertakings (Protection of Employment) Regulations—TUPE.

Graeme Cook Transport Scotland
link

Transport Scotland is an agency, so all its staff are already part of the civil service and there will be no change in their employment whatsoever. As an agency, Transport Scotland is the same legal entity as the Scottish Government, so there will not be a change of staff terms and TUPE or the Cabinet Office statement of practice—COSOP—will not be required.

Willie Rennie LD The Convener · Fife North East
link

Thank you for your indulgence. We have stayed much longer than I promised at the start of the meeting, but you cannot trust politicians, so you should expect that. Thank you for your evidence. There have been some challenging questions, but we appreciate the answers that you have provided.That brings us to the end of our evidence session.11:38Meeting continued in private until 12:27.

  1. 08:30 Interests Procedure · 3
  2. 09:30 Scotland’s Rail Services Evidence session · 284

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.