Parliament Workbench
Data: Official Report to 24 Nov 2026

Official Report · Chamber

Queensferry Crossing (Closures)

Portfolio Question Time Transport, Infrastructure and Connectivity

Thursday 21 January 2021 Meeting of the Parliament Questions 8 contributions · 4 speakers Watch on Scottish Parliament TV

Speakers

Choose an MSP to read only their contributions

The record

8 contributions
Claire Baker Lab Mid Scotland and Fife
link

To ask the Scottish Government what action is being taken to reduce the impact of any closures of the Queensferry crossing. (S5O-04931)

Michael Matheson SNP The Cabinet Secretary for Transport, Infrastructure and Connectivity · Falkirk West
link

When there is a risk that the Queensferry crossing may have to close as a result of ice accretions, our operating company BEAR Scotland will be alerted in advance. Our five-point plan is then implemented: it includes enhanced patrols; a heightened focus on prevailing weather conditions; increased data and intelligence gathering; the pre-laying of traffic management measures; and enhanced stakeholder communications. During any emergency closure of the Queensferry crossing, a diversion route will be implemented using the Forth road bridge or the Kincardine bridge as appropriate, depending on the required duration of the closure.

As the member will be aware, the Queensferry crossing was closed this morning at approximately 4.30 am. The northbound carriageway reopened at approximately 9.15 am and the southbound carriageway at 10.20 am. The closure followed forecasts of a high risk of ice accretions between 5 and 7 am this morning, and the five-point plan was implemented successfully. As this morning’s disruption was forecast to be of short duration, traffic was diverted via the Kincardine bridge in accordance with the established procedures.

Claire Baker Lab Mid Scotland and Fife
link

As the cabinet secretary has recognised, the bridge was closed overnight and earlier this morning, which has caused significant delays and diversions for those who are travelling. What cost assessment was made for the ice prevention system that was considered as part of the construction plans for the Queensferry crossing? Why was it decided not to take that system forward?

Michael Matheson SNP The Cabinet Secretary for Transport, Infrastructure and Connectivity · Falkirk West
link

I do not have the precise figure to hand, but I am more than happy to write to Claire Baker with further information on the actual cost associated with that system, which was part of the original design programme.

The reason why the system was not progressed is that it was identified that there was a low risk of ice accretion being a problem on the new Queensferry crossing, given the history of the site and the weather forecasting in the area over an extended period of time. It is clear, however, that ice accretion continues to be an on-going issue, which is why we have enhanced the current arrangements for managing such matters to try to minimise the disruption that is caused to Claire Baker’s constituents, which is always very regrettable. She should also recognise that the bridge is much more reliable than the Forth road bridge, which was closed regularly because of high winds; that is not the case with the Queensferry crossing.

I assure the member that we are trying to identify any measures that would further minimise the risk of disruption to the Queensferry crossing that is caused by the specific weather conditions that result in the accretion of ice. We will do all that we can to minimise the risk and the problems that occur due to such disruption.

Graham Simpson Con Central Scotland
link

Will the cabinet secretary tell us what measures he is looking at to prevent further closures of the Queensferry crossing? The number of closures is becoming immensely frustrating.

Michael Matheson SNP The Cabinet Secretary for Transport, Infrastructure and Connectivity · Falkirk West
link

I recognise the frustration, but there have been only three or four occasions on which this problem has occurred. It was not a problem during construction and occurs only in specific weather conditions. For example, there were no problems on the bridge during the beast from the east.

We are looking at a range of options, which might involve ultrasound or a vibration system. Those may be appropriate means to address the problem, but any system for a bridge must be a bespoke design. The member may be aware that such problems have arisen on similar bridges in the United Kingdom and worldwide. Any new system would have to be a bespoke design that suits the parameters of the Queensferry crossing.

Alex Cole-Hamilton LD Edinburgh Western
link

I was told in a helpful briefing from Transport Scotland that the reason why Kincardine was favoured this morning is that it takes five hours to put in place the contraflow, signage and road changes that would be required to open up the Forth road bridge as a resilience measure.

Given that the censors on the bridge have warned of ice accretion on almost every day since Christmas, it is likely to be a regular issue. What can be done to reduce how long it takes to stand up the FRB as a resilience measure? Will the Scottish Government commit the necessary capital funding for a permanent mitigating solution on the bridge?

Michael Matheson SNP The Cabinet Secretary for Transport, Infrastructure and Connectivity · Falkirk West
link

We are committed to identifying a long-term solution to the issue. Research is on-going to try to make sure that we get a system that will address the problem.

Mr Cole-Hamilton is correct about how long it takes to implement a diversion. BEAR Scotland will be carrying out an exercise in the coming weeks to try to reduce that time. He will understand that if a diversion was implemented on every occasion when it was thought that there might be a risk to the bridge, that would cause significant disruption. There is a balance to be reached in making those judgments. BEAR Scotland’s on-going work and our own research will help to inform how we can help to manage the issue more effectively.

Motions, questions and votes

Linked from this item of the Official Report
  1. Place-based Economic Development Zones Statement · 36
  2. Rural Economy (Impact of European Union Exit) Statement · 30
  3. Covid-19 Restrictions (Support for Tourism in West Scotland) Questions · 6
  4. Tourism (Support) Questions · 10
  5. Agriculture Funding Review (Discussions with United Kingdom Government) Questions · 4
  6. International Tourists (VAT-free Shopping) Questions · 5
  7. Covid-19 (Support for Food and Drink Businesses) Questions · 8
  8. Brexit (Impact on Salmon Industry) Questions · 4
  9. Gene Editing (Crops) Questions · 4
  10. Tourism Industry (Meetings) Questions · 5
  11. Transport, Infrastructure and Connectivity Questions · 1
  12. Sustainable Transport (Investment) Questions · 4
  13. A75 Dualling (Progress) Questions · 6
  14. Queensferry Crossing (Closures) Questions · 8
  15. Covid-19 (Protection of Front-line Public Transport Staff) Questions · 7
  16. M74 (Soundproof Fencing at Uddingston) Questions · 4
  17. Edinburgh to Perth Railway (Upgrade) Questions · 4
  18. M8/M73/M74 Motorway Improvements Project (Evaluation) Questions · 8
  19. Justice and the Law Officers Questions · 1
  20. European Union Security Protocols and Law Enforcement Organisations Questions · 5
  21. Covid-19 Lockdown (House Parties) Questions · 5
  22. Covid-19 Restrictions (Enforcement by Police Scotland) Questions · 4
  23. Covid-19 Restrictions (Education in Prisons) Questions · 10
  24. Collection of Data on Sex and Gender (Draft Guidance) Questions · 7
  25. Reduction in Criminal Trials (Support for Victims) Questions · 10
  26. Naloxone Questions · 5
  27. Scottish Prison Service Annual Report 2019-20 Questions · 4
  28. Culpable Homicide (Scotland) Bill: Stage 1 Bill debate · 24
  29. Dogs (Protection of Livestock) (Amendment) (Scotland) Bill: Stage 1 Bill debate · 27
  30. Decision Time Decision time · 5
  31. Correction Procedure · 1

The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.