This suite of complementary amendments would update and modernise the planning system in relation to Scotland’s peatlands. That special habitat’s importance has grown in recent years because of its capacity to be a vital natural carbon sink. Members will recall that I spoke to similar amendments at stage 2 but, after listening to the minister’s concerns, I did not press them.
I thank the minister for discussing the stage 3 amendments with me; I have also had support from civil servants, including Andy Kinnaird. After further work, I remain convinced that the system of permissions and extraction rights for the habitat is out of date and no longer fit for purpose. I intend to listen carefully to what the minister says before I decide whether to press the amendments.
Many local authorities do not have comprehensive information about existing permissions, never mind the fact that many permissions should not exist at all in the context of Scotland’s climate emergency. I commend the Scottish Government for giving a high priority to phasing out peat use and peat extraction, in recognition of their significant climate change impacts and of the adverse effects on water and wildlife from damaged peatlands.
However, about 500,000m3 of peat is still extracted annually in Scotland. That removes a carbon store that takes thousands of years to form and results in the loss of almost all biodiversity value on the sites involved and in changes to hydrology that can have negative effects on flood management for our communities and populations. The Scottish Government is right to spend millions of pounds per annum on the peatland action fund to restore degraded peatlands across Scotland, so it surely makes sense, for coherent policy, to prevent the degradation of further sites, whose restoration costs could well lie with the public purse.
At stage 2, a target of net zero emissions by 2045 has been accepted for the Climate Change (Emissions Reduction Targets) (Scotland) Bill. The word “net” is important. The United Kingdom Committee on Climate Change’s advice on net zero targets says that it is
“confident that Scotland could feasibly achieve”
a higher target than the rest of the UK because of its greater sequestration capabilities.
Given increasing global recognition of the need for carbon reductions from land use activity, the proposals in the amendments would offer a relatively quick and cost-effective opportunity to address the issue in the public interest. The Scottish Government supports the UK Government’s target for retail soil supplies to be peat free by 2020 and for commercial horticulture to end the use of peat by 2030. The Scottish Government has also set a target of restoring 250,000 hectares of peatland by 2030. The amendments are entirely in line with that policy position, so I want to know clearly whether the minister thinks that amendment 208 should be pressed and the other amendments moved.
I hope that members will bear with me as I discuss these technical amendments in turn. Whether or not I move them all, it is important to put the issues on the record, so that we can move forward together as a Parliament, with the Scottish Government in the lead—particularly if I do not press all the amendments.
Amendment 208 would allow planning authorities to impose nature conservation as a recognised aftercare condition. Schedule 3 to the Town and Country Planning (Scotland) Act 1997 sets out three uses—for agriculture, forestry and amenity. A note from the Scottish Government on the amendment, for which I thank the minister, explained that the 1997 act defines a use for amenity as meaning that the land is
“suitable for sustaining trees, shrubs or other plants”,
which is dealt with in planning advice note 64, on the reclamation of surface mineral workings. That is welcome, but the critical omission from the list in schedule 3 is peatland restoration. Amendment 208 would remedy that by introducing a broader definition.
Planning advice note 64 was up for consultation and revision in 2015 and has not been updated since January 2017. Can the minister confirm whether he still intends to update PAN 64, as recommended by the opencast coal review? Will he commit to consulting on the adequacy of the advice on aftercare and the priority that is given to nature conservation, particularly if amendment 208 is withdrawn?
I highlight that, since stage 2, on the advice of the minister, I have edited the amendment that I lodged then to remove the involvement of Scottish Natural Heritage. I will not go into the details of that, but it is appropriate, because SNH has only an advisory role. The amendment is reasonable, given the environmental and climate emergency. The Scottish Parliament information centre has confirmed that the amendment would strengthen the status of nature conservation, particularly in light of developments in understanding about the importance of peatland and other issues that I have highlighted. For a number of mineral extraction sites, nature conservation is indeed the most appropriate and locally desirable afteruse. If I withdraw amendment 208, I urge the Scottish Government and members across the chamber to take forward the issues that are raised in it.
I come to amendments 209 to 211. Following comments from the minister at stage 2, I altered the similar amendments that I lodged then to limit their scope to peatlands, rather than all mineral extractions. There are two difficulties. The onus is wholly on planning authorities to monitor whether sites are lying dormant, and the power does not prevent operators from leaving sites dormant for years and then restarting operations without input from the planning authority. Under amendment 209, where an operator has left a site dormant and ceased operations for two years or more, the planning permission would automatically be suspended and the operator would need to proactively apply to the planning authority to resume operations. That would rebalance the situation and would put some onus on operators to keep their permissions up to date, and it would improve the ability of planning authorities to become aware of dormant sites. However, there may be a different solution to that issue.
Amendment 210 would introduce a sunset clause. It aims to simplify and clarify the process of the review of old mineral permissions by introducing a sunset clause for all old peat extraction consents, setting a time by which they must all be reactivated or they will permanently expire. Current permission periods are lengthy and poorly regulated. I will not go into the detail but, in the 23 years for which the processes have been in place, there has been ample opportunity for site operators and local authorities to make use of them. However, in a report in 2003, which was a significant number of years ago, SNH struggled to draw conclusions about progress with ROMP, having encountered difficulties obtaining information from local authorities.
That is another concern. The Environment Act 1995 introduced a requirement for the periodic review of mineral permissions, but only 15 sites are known to have gone through that review process, and there is no penalty or mechanism to enforce those statutory requirements. I would appreciate hearing from the minister whether a more robust mechanism might be put in place. It tends to be developers that trigger the process voluntarily. There is no centrally available information on sites where planning permission has ceased to have effect, and existing planning permissions act as a barrier to obtaining funding for restoration through mechanisms such as peatland action.
The bill presents a logical opportunity to simplify those procedures and to align planning with other areas of Government policy on peatland. Setting a clear end date for old planning permissions by introducing a sunset clause for extraction permissions would deliver that. Under amendment 210, all companies that have consents in the phase II and III lists or sites that were consented before 1982 would need to reactivate them—which seems a reasonable stipulation, considering how long ago that was—by a fixed national date or lose the consent permanently, although restoration and aftercare conditions would still apply.
That would remove long-term uncertainty around the status of the carbon in the soils and it would remove the burden on local authorities to instigate the process, thereby overcoming issues with lack of enforcement and clear data collection. The sunset clause does not pose a risk of encouraging developers to start production at unworked sites with old permissions, as it would simply require companies to reactivate consents.
14:15
Some members will be relieved to hear that we have come to the final amendment in the group. Amendment 211 clarifies that any calculation of compensation for restrictions on working rights for peat extraction should assume that there will be no UK “market for horticultural peat”—I will not repeat the dates. That would give planning authorities the confidence to consider restricting working rights in strategically important areas to allow for peatland restoration, because authorities would have greater clarity on the scope of possible compensation claims. Amendment 211 would not result in a ban on the sale of the products, but it would prevent peat extraction sites from claiming compensation on the assumption that there will still be markets for the products beyond the dates specified. Rather, the damaging products will have been phased out.
There is a presumption against new commercial peat extraction in the planning permission system and, in particular, in planning policy. Schedule 8 to the Town and Country Planning (Scotland) Act 1997 allows local authorities to order that mineral extraction be discontinued if that is in the interest of their districts, but any such order could trigger a claim for compensation by the holder of the extraction rights. Schedule 10 to the 1997 act, on periodic review of planning permissions, provides that compensation provisions are applicable when working rights to mineral extraction are restricted as a result of new conditions, except those relating to restoration and aftercare. In practice, that provision has been cited as a deterrent to planning authorities considering limiting the length or size of peat extraction sites, even when the peat extraction is clearly not in local interests or in the interests of meeting biodiversity targets. I gave an example at stage 2, so I will not go into details. Auchencorth Moss in Midlothian, in my region, is one such example. RSPB Scotland states that the site accounts for an enormous one fifth of Scotland’s total carbon emissions from peat extraction, and it is adjacent to a site of special scientific interest. I will not go into more detail, but the site is very precious.
I thank the minister for meeting me to discuss my amendments and for sending over information. I understand that the Government has concerns about amendment 211 in relation to the European convention on human rights, and I will listen carefully to the minister’s response.
However, there is clear public interest in ensuring that peatlands are safeguarded, and that there is a more transparent and realistic basis for compensation claims to prevent instances such as the one that I have highlighted from taking place. The Scottish Government has supported targets for ending horticultural peat sales, due to a significantly increased understanding of the importance of protecting and restoring peatlands for reasons relating to carbon and the wider ecosystem. I very much hope that the minister will consider those points.
I thank those members who have been able to listen for listening.
I move amendment 208.