I will briefly outline the background thinking. The starting point is that the act lays down the prescriptive periods and therefore we think that, in general, those ought to be the periods that actually apply. That is one premise. A second premise is that, if we are to allow any extension to those periods, the extension must balance the interests of parties—which obviously diverge—and must not be capable of undermining the system as a whole. That led us to the view that it should not be possible to extend the 20-year period, with the single exception that we have already discussed about proceedings that were continuing. The period is meant to be an absolute cut-off, so to allow people to extend it would clearly undermine that principle.
We then focused our attention on the shorter periods, such as the five-year period. Should it be possible for parties to change that? A key factor for us was that we thought that it would be inappropriate for parties to be able to change the prescriptive period in advance—for example, while making a contract. We were concerned that if, for example, parties were to enter into a contract that stated that there would be a 10-year prescriptive period instead of a five-year one, that would, first, undermine the system, which is supposed to be as clear and have as few different periods as possible, and, secondly, favour the party in the stronger bargaining position. That is what led us to the view that the right balance is struck if we permit some agreements to extend beyond the period but only in strictly limited circumstances. As I have just been saying, we proposed that the dispute must have arisen already. You do not invent a new prescriptive period in advance; you enter into the agreement after the dispute has arisen. We also proposed that the agreements should be limited in time and should be capable of being made only once.
To go back to the construction example, if the employers in a building contract have learned all the relevant facts and know that they have suffered a damage as a result of a design problem that was caused by the architect, they then have five years. Under the existing system, the only way in which to preserve their claim is to raise proceedings. The provision in the bill seeks to give them another option, which is to agree with the architect, before the five years have run out, that they will have a short extension—say, for six months or a year—to see whether they can settle out of court. We thought that that was a more efficient use of resources. It also avoids raising the stakes, or increasing the pressure, in the way that litigation does, and it saves costs, too. It seemed to us that that was an appropriate way of dealing with the issue and that it struck the right balance.
The other point to make in addressing Alison Harris’s question is that, although there was some divergence of view about whether these agreements were a good thing, a lot of it was really predicated on the particular conditions that applied. We think that the three conditions that I have mentioned—that the period can be changed only after the event, that it can be extended only by one year and that there can be only one extension—address all the reservations that were expressed by consultees.