To ask the Scottish Government whether it will provide an update on the wire corrosion on the Forth road bridge. (S4T-01001)
Official Report · Chamber
Forth Road Bridge (Wire Corrosion)
Topical Question Time
Speakers
Choose an MSP to read only their contributions- David Stewart Lab 3
- Derek Mackay SNP 3
The record
6 contributionsThe Forth Estuary Transport Authority provided an update in a press release on 22 April 2015 that noted that, although wire corrosion requires investigation, there are no immediate safety concerns and the cables still have more than enough strength to do their job. The work will be taken forward by FETA and then through the new Forth bridges unit operating contract that commences on 1 June 2015.
The minister will be aware that, since the acoustic monitoring system was installed in 2006, it has detected 93 wire breaks, but 24 of them have been since the end of January this year. Will he indicate whether that is part of a longer-term problem?
Mr Stewart is correct that the acoustic monitoring equipment is providing us with the information that we require, but there will be a further comprehensive investigation over May and June, which will be more intrusive and in depth. That will give us further information on which to make a judgment. Clearly, some of the cracks that have appeared will be worthy of further investigation, but we are still of the opinion that there are no immediate safety concerns and that the cables are perfectly fine to carry the bridge and the traffic on the bridge. Of course, there will be on-going monitoring and investigation, and the work that we have put in place for dehumidification will prevent further deterioration, although some of this is a legacy from when the first cracks and breaks appeared in 2004-05. There is no reason to be alarmed, but we are conducting a close inspection of the faults that have been found.
Will the minister confirm that, even when the new bridge is complete, the Forth road bridge will still be used for school buses, taxis and cyclists? If there are further wire breaks over the next few months, will he agree to come back to Parliament and make a statement, to reassure the public about understandable safety concerns?
I say again, for reassurance, that, although the increase in the number of detected wire breaks requires a full investigation, there are no immediate safety concerns. The cables still have more than enough strength to do their job. There will also be the on-going investigation that I have referred to.
After consultation, we will produce a road order that will set out what traffic will be able to use the Forth road bridge in the future. As the bridge transfers to the responsibility of the Scottish ministers and a new operating company contract, it will be designated as a motorway and any traffic will have to be compliant with that status. We will produce a road order imminently, which will go out to consultation, and I will be more than happy to report back to Parliament on that and on any other matter relating to the strength of the bridge. As I say, the concerns will be fully investigated, but there is no cause for alarm.
Motions, questions and votes
Linked from this item of the Official ReportIn this meeting
Everything on 28 Apr 2015 →- Time for Reflection Time for reflection · 2
- Nepal Earthquake Questions · 10
- Forth Road Bridge (Wire Corrosion) Questions · 6
- Scotland’s Future Employability Services Debate · 81
- Decision Time Decision time · 6
- Prestwick Airport Spaceport Bid Members’ business · 15
The type of each item (debate, statement, questions, members’ business and so on) and the times shown are worked out by this site from headings, the chair’s opening words and the Official Report’s running timestamps. They are not the Parliament’s own classification. Text: the Scottish Parliament Official Report.