Parliament Workbench

Question thread · 4 questions

For what reason Cancellations and Significant Lateness is a regulated measure of rail performance everywhere in the UK apart from Scotland, and how those figures would differ from public performance measures.

Started with S5W-06432 on 20 Jan 2017; latest 20 Aug 2018. Each later question says it follows up an earlier answer.

Follow-ups
3
longest chain 1 step
Span
577 days
20 Jan 2017 to 20 Aug 2018
Answered
4 of 4
by Michael Matheson, Humza Yousaf
Asked by
1
Mike Rumbles

The thread, in order

Each answer’s opening lines; open a question for the full text
  1. S5W-06432 20 Jan 2017 Mike Rumbles LD Answered

    To ask the Scottish Government for what reason Cancellations and Significant Lateness is a regulated measure of rail performance everywhere in the UK apart from Scotland, and how those figures would differ from public performance measures.

    Humza Yousaf, 1 Feb 2017: The regulated measure of rail performance for Scotland for this railway control period is the Public Performance Measure “PPM”. Network Rail has a regulatory target of a Moving Annual Average of PPM by the end of this Control Period in April 2019 of 92.5%. The ScotRail Franchise Agreement contains a PPM benchmark regi…
  2. S5W-18292 17 Aug 2018 Mike Rumbles LD Answered

    Further to the answer to question S5W-06432 by Humza Yousaf on 1February 2017, whether it will provide a breakdown of the elements of the CaSL measures that are captured within PPM, and what additional indicators of this performance are available to rail users.

    Michael Matheson, 5 Sep 2018: The CaSL (“Cancellations And Significant Lateness”) performance measure works as follows. A train is counted as being a CaSL failure if: • It is cancelled at origin. • It is cancelled en route. • The originating station is changed. • It fails to make a scheduled stop at a station. • It is significantly late (i.e. it a…
  3. S5W-18295 17 Aug 2018 Mike Rumbles LD Answered follows S5W-06432

    In which railway control period the PPM was introduced; what preceded it, and what changes have been made since its introduction.

    Michael Matheson, 5 Sep 2018: The Public Performance Measure (“PPM”) is a composite measurement which combines punctuality and reliability. The former Strategic Rail Authority introduced the PPM measure in 2000, during the second rail Control Period. By-period measurements for the Scottish franchise are available from April 1997. The definition fo…
  4. S5W-18331 20 Aug 2018 Mike Rumbles LD Answered follows S5W-06432

    Whether it will prove a breakdown of the elements of the CaSL measures that are not captured within PPM, and what indicators of this performance are not available to rail users because of this.

    Michael Matheson, 5 Sep 2018: All the elements of the CaSL measure, are captured within the PPM measure.

How this thread is put together

Follow-up
A question whose text says it is “further to the answer to question …” (or reply, response, or asks for a “substantive answer” to an earlier question). The question it names is its parent.
Several citations
When a question cites more than one earlier question, the most recent one we hold is used as the parent; the others are listed as “also cites”.
Thread
Follow parents back to the first question; every question that leads back to it is in this thread. Branches are shown in date order.

All question threads