What studies it has commissioned on airport rail links; when any such studies (a) were commissioned and (b) will report, and what the cost will be of any such studies.

Started with S1W-17478 on 9 Aug 2001; latest 18 Dec 2001. Each later question says it follows up an earlier answer.

Follow-ups
3
longest chain 1 step
Span
131 days
9 Aug 2001 to 18 Dec 2001
Answered
4 of 4
by Sarah Boyack, Lewis Macdonald
Asked by
1
Sandra White

The thread, in order

Each answer’s opening lines; open a question for the full text
  1. S1W-17478 9 Aug 2001 Sandra White SNP Answered

    To ask the Scottish Executive what studies it has commissioned on airport rail links; when any such studies (a) were commissioned and (b) will report, and what the cost will be of any such studies.

    Sarah Boyack, 28 Aug 2001: In August 2000, the Scottish Executive, the former Department of the Environment, Transport and the Regions and the then Shadow Strategic Rail Authority jointly commissioned Booze, Allen and Hamilton to carry out an indicative financial and economic feasibility study to look at potential rail options for rail links to…
  2. S1W-18005 7 Sep 2001 Sandra White SNP Answered

    Why it would not provide the cost of the Boo', Allan and Hamilton study into rail links to Glasgow and Edinburgh airports on the grounds that it is commercially restricted information when an estimated cost of the study was provided in the answer to question S1W-10834 on 1 December 2000.

    Sarah Boyack, 18 Oct 2001: My answer to question S1W-17478 was given at the time when the Scottish Executive was in the process of inviting bids to undertake a detailed study into rail links to Glasgow and Edinburgh airports. This study will build on work carried out previously by Booz, Allen and Hamilton and their report formed an integral par…
  3. S1W-18007 7 Sep 2001 Sandra White SNP Answered follows S1W-17478 also cites S1W-10834

    Whether her answer to question S1W-10834 on 1 December 2000 breached commercial confidentiality rules.

    Sarah Boyack, 15 Oct 2001: No. The estimated cost of a project prior to contract award is not normally disclosed as it affects the Scottish Executive's negotiating position. However, the figure quoted in my answer to question S1W-10834 was the Executive's assessment of the possible final cost once the contract was under way. It was based on the…
  4. S1W-21215 18 Dec 2001 Sandra White SNP Answered follows S1W-17478

    What progress is being made with the detailed study it has commissioned into direct air links to Edinburgh and Glasgow airports and when it expects the final report to be published.

    Lewis Macdonald, 15 Jan 2002: Sinclair Knight Merz have recently been commissioned to undertake a study into rail links to these airports. It is too early to say what the outcome will be. The final report containing the consultants' conclusions and recommendations is expected in autumn this year.

How this thread is put together

Follow-up
A question whose text says it is “further to the answer to question …” (or reply, response, or asks for a “substantive answer” to an earlier question). The question it names is its parent.
Several citations
When a question cites more than one earlier question, the most recent one we hold is used as the parent; the others are listed as “also cites”.
Thread
Follow parents back to the first question; every question that leads back to it is in this thread. Branches are shown in date order.