Written Question · S6W-44191 · Session 6
Whether it will provide a breakdown of the number of bridges on the trunk road network that require repair work, including (a) the name and…
The question
To ask the Scottish Government whether it will provide a breakdown of the number of bridges on the trunk road network that require repair work, including (a) the name and location of each bridge, (b) when work was first identified as being required and (c) when work is projected to be completed by.
The answer
Each structure on the trunk road network is inspected every two years. Any defects found are recorded and categorised in terms of severity and extent. Currently, of the 2069 bridges on the trunk road network, 1939 are recorded as having defects. An assessment of the extent and severity of these defects is used to prioritise works and produce one and three year programmes for repair. 270 bridges are deemed to have defects severe enough to programme specific works. Programmes are updated every year taking into account data from the previous year’s inspections.Spreadsheet A contains a list of structures with defects along with their positions on the trunk road network.Spreadsheet B contains a list of structures with programmed repairs along with the year in which they are due to commence, , with some schemes devised to address similar defects on multiple structures.These can be found in the Scottish Parliament Information Centre (Bib. Number 66564)
In the Official Report
No contribution in the Official Report cites S6W-44191 by reference.