What the average length of time is that CalMac ferries spend in scheduled drydocking.

Answered Asked by Tim Eagle Con Lodged 26 Jan 2026

The question

To ask the Scottish Government what the average length of time is that CalMac ferries spend in scheduled drydocking.

The answer

Answered by Fiona Hyslop on 4 Feb 2026 · 9 days after it was lodged, on time

The average length of time for scheduled drydocking is 20 days for small vessels is and 30 days for major vessels.