Written Question · S6W-41837 · Session 6
When it will bring the A75 and A77 up to the standard required for major freight traffic to Cairnryan Port.
The question
To ask the Scottish Government when it will bring the A75 and A77 up to the standard required for major freight traffic to Cairnryan Port.
The answer
The A75 and A77 are vital components of Scotland’s strategic trunk road network, providing essential links between Cairnryan Port and the wider UK and European markets. Both routes are designed to higher standards than local roads, with features that support durability, safety, and resilience.The South West Scotland Transport Study (2020) highlighted their economic importance: the A75 west of Dumfries carries goods worth around £20 million daily, while the A77 south of Ayr carries £10 million daily, the highest HGV proportions in the region.Since 2008, significant investment has been made:A75: Six major schemes, including alignment upgrades, overtaking lanes, and the Dunragit Bypass, totalling over £50 million.A77: Five major improvements, including the £29 million Maybole Bypass opened in 2022, totalling £64 million.Maintenance spend since 2007 has been substantial, £173.1 million on the A75 and £146.7 million on the A77, with further allocations in 2024/25 of £20.8 million and £12.5 million respectively. Upcoming works include resurfacing, drainage, and targeted upgrades.Looking ahead, Recommendation 40 of STPR2 commits to further improvements in safety, resilience, and reliability on both routes. This will include enhanced junctions, additional overtaking opportunities, and carriageway widening or realignment to address pinch points.A75: Design and assessment work to consider options for realigning the A75 trunk road with bypasses at the villages of Springholm and Crocketford is underway and proceeding at pace. This work will culminate in the identification of a preferred route option for the scheme in early 2027.A77: Work is underway to further develop and prioritise locations on the A77on the single carriageway section south of Ayr identified as part of STPR2 Recommendation 40. This will include further business case development and stakeholder involvement in this process.This demonstrates the Scottish Government’s ongoing commitment to ensuring these critical corridors meet the needs of major freight traffic and support Scotland’s economic connectivity.
In the Official Report
No contribution in the Official Report cites S6W-41837 by reference.