Written Question · S6W-10982 · Session 6

Further to the answer to question S6W-08912 by Michael Matheson on 15 June 2022, how it reconciles the uplift in Scottish Water charges of …

Answered Asked by Jackie Baillie Lab Lodged 7 Sep 2022

The question

To ask the Scottish Government, further to the answer to question S6W-08912 by Michael Matheson on 15 June 2022, how it reconciles the uplift in Scottish Water charges of 1.5% a year above inflation and the revised figure of 1.8% above the rate of the Consumer Price Index (CPI) inflation that would be required to achieve expected income levels with the figures of 2% and the more than CPI+2%, respectively, which are quoted as required in the letter from the Water Industry Commission for Scotland to Scottish Water of 3 February 2022 regarding water charges for 2022-23, and the figure of CPI+3% that Scottish Water states in its Board Paper 11/22, which was released under FOI.

The answer

Answered by Michael Matheson on 17 Oct 2022 · 40 days after it was lodged, on time

As set out in the response to S6W-08912, the Final Determination explained that the Commission would expect that its charge caps would allow Scottish Water’s annual revenue in the final year of the current regulatory control period to be no less than £1,392m (as set out in page 10 of the Final Determination). This level of revenue was based on assuming an average charge cap of 1.5% a year above inflation over the regulatory control period 2021-27.
The Final Determination set a maximum amount of charges of CPI + 2% on average for each year of the regulatory control period. As set out in the Final Determination, the difference between the CPI + 2% and the CPI + 1.5% each year on average was to cover any additional costs that Scottish Water incurs in selecting an investment option that has a higher net present value than the lowest financial cost option, after allowing for externalities such as carbon, natural and social capital. This is the allowance of £132m set out in pages 9 and 15 of the Final Determination. This money would only be used where such projects had been thoroughly appraised. The minimum revenue expectation did not take account of this allowance.

In the Official Report

No contribution in the Official Report cites S6W-10982 by reference.