Written Question · S5W-34929 · Session 5
In the absence of the delivery of the MV Glen Sannox, what action it will take to improve the reliability of Arran ferry services, in order…
The question
To ask the Scottish Government, in the absence of the delivery of the MV Glen Sannox, what action it will take to improve the reliability of Arran ferry services, in order to reduce the risk of disruption.
The answer
The MV Glen Sannox will be delivered and, based on the work programme shared with Parliament by the Turnaround Director of Ferguson Marine Port Glasgow, Mr Tim Hair, the vessel should be delivered to CalMac for deployment on services on the network by April-June 2022, following sea trials.
We continue to invest in the reliability of vessels in Clyde and Hebrides network through the Resilience Fund which was set up to improve the future reliability and availability of vessels, including both vessels operating on the Ardrossan to Brodick route and for ensuring the resilience of the Lochranza service.
This funding has been in place since 2018 and has been used to upgrade or replace key systems and equipment on the vessels throughout the CalMac fleet to reduce the risk of breakdowns.
We continue to invest in the reliability of vessels in Clyde and Hebrides network through the Resilience Fund which was set up to improve the future reliability and availability of vessels, including both vessels operating on the Ardrossan to Brodick route and for ensuring the resilience of the Lochranza service.
This funding has been in place since 2018 and has been used to upgrade or replace key systems and equipment on the vessels throughout the CalMac fleet to reduce the risk of breakdowns.
In the Official Report
No contribution in the Official Report cites S5W-34929 by reference.