The question
To ask the Scottish Government what action it has taken since July 2019 to improve trunk roads in (a) Fife and (b) the rest of the country to make them safer for (i) cyclists and (ii) other road users.
The answer
Transport Scotland’s Strategic Road Safety Plan sets out how road safety improvements are delivered on the trunk road network. The Plan supports Scotland’s Road Safety Framework to 2020, which includes cyclists and pedestrians as a priority action area.
The safety performance of the trunk road network is assessed on an annual basis in accordance with the Strategic Road Safety Plan. This robust, evidence-based approach ensures that the available funding can be prioritised for those locations that offer the greatest casualty reduction potential, and thus best contribute to our casualty reduction targets. This annual road safety review includes engagement with organisations such as Sustrans and local authorities on local priorities for active travel, to ensure that road safety improvements are considered for areas that require them most.
Since July 2019 a number of safety improvements in Fife with respect to active travel have been completed, or are ongoing. These include:completion of a footway/cycleway on the A92 at Freuchie (with a further two schemes, on the A985 at Hilton Road to West of Pattiesmuir, and at Tofthill junction to Balfarg Steadings, currently under construction);a new Toucan (signal controlled shared pedestrian and cycle) crossing was installed on the A92 at Balbirnie in October 2019;uncontrolled crossing point improvements are under construction on the A92 at the Balfarg junction in Glenrothes;schemes are currently being developed on the A92 at Freuchie and Balfarg which involve junction signalisation including controlled crossing facilities for pedestrians and cyclists;Improvements to dropped kerbing provision on the A92 at Forgan Roundabout and installation of bollards to improve visibility of pedestrian crossing points;A feasibility study into a new active travel route alongside the A985 between Waggon Road and Limekilns is also currently underway;our agents have also delivered an upgrade of four pedestrian crossings on the A985 to ‘Puffin’ crossing standard, and a road layout redesign in Kincardine Town Centre at High Street, North Approach Road and Toll Road as part of the ‘Places for Everyone’ scheme to improve pedestrian and cycling movements.
In addition to the above, interventions for other road users have included:two vehicle activated warning signs on the A985 at Clinkum Bank, and enhanced road markings and footways at the Admiralty Road roundabout;on the A92 the speed limit has been reduced between Halbeath and Crossgates, with upgraded warning signage for pedestrians crossing the trunk road coming into force in early August 2020;traffic signs have been upgraded at the Kettlebridge junction;upgraded road markings at Cadham and Balfarg junctions, carriageway resurfacing from the New Inn Roundabout to Balfarg;and an on-going investigation to assess options for re-profiling the carriageway to improve safety at the Crossgates slip road.
In addition to location-specific interventions, our trunk road operating companies also undertake weekly safety inspections of the network any to identify any safety defects that require prompt or immediate attention.
Lesser defects, and general deterioration which do not necessitate such an immediate safety-led response, are recorded and considered with findings from our annual condition assessments to help determine future maintenance schemes. These include assessments of road surface conditions (including skid resistance). Resultant schemes may include localised patching repairs or larger maintenance schemes, which are considered against competing priorities across the trunk road network and programmed accordingly. These maintenance programmes cover the whole of Scotland across a range of schemes and asset types.
As part of the Scottish Government’s vision to promote active travel, suitable provision for all road users, including cyclists, is also considered as part of our major trunk road projects. We work collaboratively throughout scheme development stages w
The safety performance of the trunk road network is assessed on an annual basis in accordance with the Strategic Road Safety Plan. This robust, evidence-based approach ensures that the available funding can be prioritised for those locations that offer the greatest casualty reduction potential, and thus best contribute to our casualty reduction targets. This annual road safety review includes engagement with organisations such as Sustrans and local authorities on local priorities for active travel, to ensure that road safety improvements are considered for areas that require them most.
Since July 2019 a number of safety improvements in Fife with respect to active travel have been completed, or are ongoing. These include:completion of a footway/cycleway on the A92 at Freuchie (with a further two schemes, on the A985 at Hilton Road to West of Pattiesmuir, and at Tofthill junction to Balfarg Steadings, currently under construction);a new Toucan (signal controlled shared pedestrian and cycle) crossing was installed on the A92 at Balbirnie in October 2019;uncontrolled crossing point improvements are under construction on the A92 at the Balfarg junction in Glenrothes;schemes are currently being developed on the A92 at Freuchie and Balfarg which involve junction signalisation including controlled crossing facilities for pedestrians and cyclists;Improvements to dropped kerbing provision on the A92 at Forgan Roundabout and installation of bollards to improve visibility of pedestrian crossing points;A feasibility study into a new active travel route alongside the A985 between Waggon Road and Limekilns is also currently underway;our agents have also delivered an upgrade of four pedestrian crossings on the A985 to ‘Puffin’ crossing standard, and a road layout redesign in Kincardine Town Centre at High Street, North Approach Road and Toll Road as part of the ‘Places for Everyone’ scheme to improve pedestrian and cycling movements.
In addition to the above, interventions for other road users have included:two vehicle activated warning signs on the A985 at Clinkum Bank, and enhanced road markings and footways at the Admiralty Road roundabout;on the A92 the speed limit has been reduced between Halbeath and Crossgates, with upgraded warning signage for pedestrians crossing the trunk road coming into force in early August 2020;traffic signs have been upgraded at the Kettlebridge junction;upgraded road markings at Cadham and Balfarg junctions, carriageway resurfacing from the New Inn Roundabout to Balfarg;and an on-going investigation to assess options for re-profiling the carriageway to improve safety at the Crossgates slip road.
In addition to location-specific interventions, our trunk road operating companies also undertake weekly safety inspections of the network any to identify any safety defects that require prompt or immediate attention.
Lesser defects, and general deterioration which do not necessitate such an immediate safety-led response, are recorded and considered with findings from our annual condition assessments to help determine future maintenance schemes. These include assessments of road surface conditions (including skid resistance). Resultant schemes may include localised patching repairs or larger maintenance schemes, which are considered against competing priorities across the trunk road network and programmed accordingly. These maintenance programmes cover the whole of Scotland across a range of schemes and asset types.
As part of the Scottish Government’s vision to promote active travel, suitable provision for all road users, including cyclists, is also considered as part of our major trunk road projects. We work collaboratively throughout scheme development stages w
In the Official Report