Written Question · S5W-28493 · Session 5
What modifications have been made to link spans in (a) Ardrossan, (b) Brodick and (c) Gourock in the last five years, and for what reason.
The question
To ask the Scottish Government what modifications have been made to link spans in (a) Ardrossan, (b) Brodick and (c) Gourock in the last five years, and for what reason.
The answer
Ardrossan
There have been no modifications to the Arran linkspan at Ardrossan in recent years other than works of a general reactive and annual maintenance nature. The existing Arran linkspan at Ardrossan will be replaced as part of the Ardrossan Harbour redevelopment works. The specification for the new Arran linkspan at Ardrossan has been specifically developed around the design and operational characteristics of the MV Glen Sannox vessel and the other in-specification vessels e.g. the MV Caledonian Isles and the MV Hebrides.
However, there has been an extensive programme of maintenance and refurbishment works to the Irish Berth linkspan at Ardrossan over the last 12 months. These works included replacement of motors and gears to ensure the linkspan is fully operational and is in a robust condition. As discussed at the Ardrossan Taskforce, that upgrading work will accommodate the anticipated increased level of services of the Irish Berth at Ardrossan during the period of construction work to refurbish and reshape the Arran Berth.
Brodick
A new linkspan was installed at Brodick and brought into service in 2018 as part of the Brodick Ferry Terminal Redevelopment project. This new linkspan (and berth) is larger than the previous linkspan and was designed to allow for a range of vessels to berth at Brodick, including the MV Glen Sannox.
Gourock
There have been no modifications made to the Gourock linkspan over the past five years. However, the linkspan has had a number of repairs undertaken, including: structural deck repairs; lifting cylinder seal replacements; lifting cylinder replacement; and numerous minor repairs. All of these repairs were undertaken to keep or return the linkspan in use and further work is programmed to enable the linkspan to provide continuity of service as a port of refuge, while a longer term masterplan for redevelopment of the site is delivered.
There have been no modifications to the Arran linkspan at Ardrossan in recent years other than works of a general reactive and annual maintenance nature. The existing Arran linkspan at Ardrossan will be replaced as part of the Ardrossan Harbour redevelopment works. The specification for the new Arran linkspan at Ardrossan has been specifically developed around the design and operational characteristics of the MV Glen Sannox vessel and the other in-specification vessels e.g. the MV Caledonian Isles and the MV Hebrides.
However, there has been an extensive programme of maintenance and refurbishment works to the Irish Berth linkspan at Ardrossan over the last 12 months. These works included replacement of motors and gears to ensure the linkspan is fully operational and is in a robust condition. As discussed at the Ardrossan Taskforce, that upgrading work will accommodate the anticipated increased level of services of the Irish Berth at Ardrossan during the period of construction work to refurbish and reshape the Arran Berth.
Brodick
A new linkspan was installed at Brodick and brought into service in 2018 as part of the Brodick Ferry Terminal Redevelopment project. This new linkspan (and berth) is larger than the previous linkspan and was designed to allow for a range of vessels to berth at Brodick, including the MV Glen Sannox.
Gourock
There have been no modifications made to the Gourock linkspan over the past five years. However, the linkspan has had a number of repairs undertaken, including: structural deck repairs; lifting cylinder seal replacements; lifting cylinder replacement; and numerous minor repairs. All of these repairs were undertaken to keep or return the linkspan in use and further work is programmed to enable the linkspan to provide continuity of service as a port of refuge, while a longer term masterplan for redevelopment of the site is delivered.