Written Question · S5W-00952 · Session 5
Further to the statement by Keith Brown on 9 June 2016 (Official Report, c. 4), whether the “double tracking at key pinch points”, which it…
The question
To ask the Scottish Government, further to the statement by Keith Brown on 9 June 2016 (Official Report, c. 4), whether the “double tracking at key pinch points”, which it committed itself to in its news release of 28 January 2016, £254 million boost to Aberdeen, at the same time as the Aberdeen City Region Deal. is specifically included as a requirement in the feasibility study into rail improvements.
The answer
The additional £254 million investment includes £200 million for rail improvements and the remit of the development works for that rail investment made by the Scottish Government, alongside the Aberdeen city region deal, will explore all engineering options to best support the delivery of improved passenger services to and from Aberdeen.
The development and feasibility works will assess numerous factors, including constructability, topography and environmental challenges, access requirements and disruption before providing recommendations. This inevitably includes consideration of potential double and additional tracking both along and adjacent to the existing single track sections between Montrose and Usan. Full delivery is expected over the course of the 10-year city deal period, with specification of initial requirements to be set out in the Scottish Government’s High Level Output Specification for Control Period 6 (period 2019 to 2024), which is due to be published by Summer 2017.
The development and feasibility works will assess numerous factors, including constructability, topography and environmental challenges, access requirements and disruption before providing recommendations. This inevitably includes consideration of potential double and additional tracking both along and adjacent to the existing single track sections between Montrose and Usan. Full delivery is expected over the course of the 10-year city deal period, with specification of initial requirements to be set out in the Scottish Government’s High Level Output Specification for Control Period 6 (period 2019 to 2024), which is due to be published by Summer 2017.
In the Official Report
No contribution in the Official Report cites S5W-00952 by reference.