Written Question · S4W-01199 · Session 4
Further to the answer to question S4W-00611 by Keith Brown on 21 June 2011, what estimates have been made of increased traffic flows on the…
The question
To ask the Scottish Executive, further to the answer to question S4W-00611 by Keith Brown on 21 June 2011, what estimates have been made of increased traffic flows on the A77 when the new Loch Ryan ferry terminal and Stena Line vessels become operational, broken down by (a) HGV and (b) other traffic.
The answer
A Transport Assessment prepared by RPS Group to support the Harbour Empowerment Order considered test scenarios in respect of current operating conditions and of a larger vessel operating at full capacity. The Transport Assessment indicated that one third of the HGV traffic travels north on the A77 and the remaining two thirds travels via the A75. Relocating the terminal to Old House Point will result in an additional third of the HGV traffic passing through Cairnryan. The Transport Assessment indicates that this would result in an additional
7 to 15 HGVs passing through Cairnryan when a ferry docks.
The distribution of cars between the A77 northbound and the A75 is split equally. The Transport Assessment therefore demonstrates that the village of Cairnryan will not be subject to any increase in car traffic. (The car traffic heading north will no longer pass through the village but the car traffic heading to the A75 will do so).
7 to 15 HGVs passing through Cairnryan when a ferry docks.
The distribution of cars between the A77 northbound and the A75 is split equally. The Transport Assessment therefore demonstrates that the village of Cairnryan will not be subject to any increase in car traffic. (The car traffic heading north will no longer pass through the village but the car traffic heading to the A75 will do so).
In the Official Report
No contribution in the Official Report cites S4W-01199 by reference.