Written Question · S3W-27530 · Session 3
What measures to improve the infrastructure for cyclists and pedestrians will be included as part of the Forth Replacement Crossing project.
The question
To ask the Scottish Executive what measures to improve the infrastructure for cyclists and pedestrians will be included as part of the Forth Replacement Crossing project.
The answer
Specific cyclist and pedestrian facilities will be provided throughout the Forth Replacement Crossing (FRC). These will include dedicated footpaths and cyclist routes incorporating priority crossing facilities at Ferrytoll Junction and South Queensferry Junction. The footpaths in the vicinity of the A8000 overbridge will be extended to connect with adjacent paths and cyclists, new footpaths will be provided along Society Road in the vicinity of the FRC and pedestrians using the FRC will be able to enjoy the facility without the traffic alongside.
At South Queensferry, pedestrian and cyclist crossing facilities will be included to the south west of South Queensferry along the A904 Builyeon Road and the U221 Road via dedicated footpath/cycleways through the new South Queensferry Junction. The roundabout will be traffic signal controlled with pedestrian and cyclist phases activated on an on-demand basis.
At South Queensferry, pedestrian and cyclist crossing facilities will be included to the south west of South Queensferry along the A904 Builyeon Road and the U221 Road via dedicated footpath/cycleways through the new South Queensferry Junction. The roundabout will be traffic signal controlled with pedestrian and cyclist phases activated on an on-demand basis.
In the Official Report
No contribution in the Official Report cites S3W-27530 by reference.