Whether it will support the construction of a footpath alongside the A76 between Cumnock and New Cumnock to ensure the safety of those who …

Answered Asked by Cathy Jamieson Lab Lodged 30 Apr 2008

The question

To ask the Scottish Executive whether it will support the construction of a footpath alongside the A76 between Cumnock and New Cumnock to ensure the safety of those who walk this route.

The answer

Answered by Stewart Stevenson on 14 May 2008 · 14 days after it was lodged, on time

There are currently no plans for construction of a footpath alongside the A76 trunk road at this location. An investigation was carried out into the feasibility of providing a footpath in 2004; however, the cost was estimated then at over £250,000 and did not represent value for money because of the low numbers of pedestrians. Road safety on this section will continue to be monitored.