Written Question · S2W-31695 · Session 2
Further to the answer to question S2W-31493 by Sarah Boyack on 6 February 2007, what estimate it has made of the total cost to the agricult…
The question
To ask the Scottish Executive, further to the answer to question S2W-31493 by Sarah Boyack on 6 February 2007, what estimate it has made of the total cost to the agricultural sector of implementing Integrated Pollution Prevention Control measures.
The answer
The Integrated PollutionPrevention and Control (IPPC) Directive impacts on a number of activitieswithin the agricultural sector. This includes the treatment of animal andvegetable matter and milk processing. The largest impact is in the intensivefarming sector.
A Regulatory ImpactAssessment, completed in 2000, estimated in general terms the cost to industry ofcomplying with IPPC. A separate UK study jointly funded by the Scottish Executive in2006 reviewed the costs associated with obtaining PPC permits. While this didnot estimate the total cost to the agricultural sector, typical costs per intensivefarming unit in Northern Ireland were found to range between £500 and £1,000 forone-off application preparation costs, £500 to £10,000 for capital investment,and £500 to £1,000 for one-off management time costs. However, these findingswere based on a very small sample size and the figures may not berepresentative of all intensive farming sites under IPPC. In addition,operators are required to pay charges to the Scottish Environment ProtectionAgency which vary depending on the size of the installation.
A Regulatory ImpactAssessment, completed in 2000, estimated in general terms the cost to industry ofcomplying with IPPC. A separate UK study jointly funded by the Scottish Executive in2006 reviewed the costs associated with obtaining PPC permits. While this didnot estimate the total cost to the agricultural sector, typical costs per intensivefarming unit in Northern Ireland were found to range between £500 and £1,000 forone-off application preparation costs, £500 to £10,000 for capital investment,and £500 to £1,000 for one-off management time costs. However, these findingswere based on a very small sample size and the figures may not berepresentative of all intensive farming sites under IPPC. In addition,operators are required to pay charges to the Scottish Environment ProtectionAgency which vary depending on the size of the installation.
In the Official Report
No contribution in the Official Report cites S2W-31695 by reference.