Further to the answer to question S2W-23855 by Tavish Scott on 20 March 2006, why its planned on-line upgrade of the A80 to full motorway s…
The question
To ask the Scottish Executive, further to the answer to question S2W-23855 by Tavish Scott on 20 March 2006, why its planned on-line upgrade of the A80 to full motorway status is one lane smaller than that recommended by consultants in 2002.
The answer
Ministers opted for less carriagewayprovision than recommended by the study consultants as they did not wish to provideincreased capacity for undesirable long distance commuting. An important part ofthat was the undertaking that, should they be required, integral traffic managementmeasures would be implemented to maintain an acceptable level of service on theimproved route. These measures could include ramp metering to assist joining trafficto take advantage of gaps in the mainline traffic and upstream ramp availabilityconstraints and online metering to give priority to high occupancy vehicles andother economically important traffic.
Transport Scotland hasthe operational responsibility for this area, and can be contacted for more informationif required.
Transport Scotland hasthe operational responsibility for this area, and can be contacted for more informationif required.
In the Official Report
No contribution in the Official Report cites S2W-24600 by reference.