The question

To ask the Scottish Executive, following the invitation to tender for the Gourock-Dunoon ferry route, whether a precedent will be set for other Clyde and Hebridean routes currently operated by Caledonian MacBrayne to be offered for tender, if they are identified as being able to operate without subsidy.

The answer

Answered by Nicol Stephen on 16 Mar 2005 · 28 days after it was lodged, on time

Since 2003 the Gourock-Dunoonroute has been treated separately from the rest of the CalMac network in relationto the tendering proposals for the Clyde and Hebrides ferry services. This reflects the presence of along-established unsubsidised commercial operator on an adjacent Gourock toDunoon route. A prior information notice was recently issued in relation to theopportunity for a commercial service with no operating or timetablerestrictions.
The prior information noticewas not the start of a tender process. Rather, it was the first step inascertaining if there might be operators interested in providing a service fromDunoon Pier to Gourock Pier on a non-subsidised basis. This option was proposedin response to local analysis suggestingthat the Gourock-Dunoon service could beoperated on a commercial basis (without subsidy) if the service were to be allowedto operate without the time and frequency restrictions that have been imposed onCalMac’s vehicle service for many years. These two factors – an unsubsidisedcommercial competitor and analysis suggesting the possibility of a commercialservice – are not present on other Clyde and Hebrides routes. The other CalMac routes which are within theundertaking have been assessed as being loss making and so there are no plansto apply the approach suggested for Gourock–Dunoon to other routes.
The Gourock–Dunoon proposalswill not be taken any further forward until there have been further discussionsbetween the Executive and the European Commission and I have reported back toParliament.

In the Official Report

No contribution in the Official Report cites S2W-14496 by reference.