SPCB Written Question · S1W-30171 · Session 1
Further to his answer to question S1W-29132 on 24 September 2002, how many works packages were let as part of the Holyrood project; what ot…
The question
To ask the Presiding Officer, further to his answer to question S1W-29132 on 24 September 2002, how many works packages were let as part of the Holyrood project; what other mechanism, other than a performance bond, was sought and in respect of which works packages; whether a parent company guarantee was used and, if so, in respect of which package, and what the value of each contract was.
The answer
To date, a total of 60 Trade Package contracts have been awarded. Other than a Performance Bond, the SPCB is entitled, under the terms of each contract, to request a Parent Company Guarantee as advised by the Construction Manager. In addition, there are a number of performance management tools in place throughout all Trade Packages which ensure that the client's interests are suitably protected. These are:1. The Construction Managers monitor on a daily basis that work is being carried out to the required standard set out in the detailed specification for materials and workmanship, and performance delivery is measured against the construction programme.2. Action is taken as necessary to ensure that no payment for sub-standard work is made and steps are taken to encourage improved levels of performance.3. Three per cent of the gross value of all payments due to contractors is retained and released only when the client is satisfied that the contract has been completed and any defects rectified to the required standard. To date, with the exception of the contract with Flour City Architectural Metals (UK) Ltd, no recovery has been sought against a Parent Company Guarantee in relation to any of the Trade Packages let. The value of the original contract with Flour City Architectural Metals (UK) package was £7,157,281.29.
In the Official Report
No contribution in the Official Report cites S1W-30171 by reference.